Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEAR2CAN099009, Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 9009251990-09-21021 September 1990 Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 900925 0CAN099002, Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP1990-09-14014 September 1990 Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP 0CAN099007, Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-14014 September 1990 Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 2CAN099004, Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis1990-09-0707 September 1990 Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis 0CAN099001, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised1990-09-0707 September 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised 1CAN099003, Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 19911990-09-0606 September 1990 Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 1991 0CAN089009, Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg1990-08-31031 August 1990 Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg 0CAN089006, Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual1990-08-30030 August 1990 Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual 0CAN089008, Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d)1990-08-29029 August 1990 Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d) 0CAN089005, Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 9010011990-08-27027 August 1990 Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 901001 1CAN089011, Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers1990-08-16016 August 1990 Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers 2CAN089009, Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 9010311990-08-13013 August 1990 Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 901031 0CAN089002, Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 11990-08-0808 August 1990 Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 1 05000313/LER-1989-041, Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria1990-08-0202 August 1990 Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria 2CAN089006, Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info1990-08-0202 August 1990 Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info ML20081E0891990-07-31031 July 1990 Advises That Since Guidance Contained in Reg Guide 1.97 Not Addressed in Submittals Re Generic Ltr 82-33,further Clarification of Position Re Compliance W/Generic Ltr Appropriate,Per .Ltr Will Be Submitted by 901215 0CAN079014, Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 9009301990-07-31031 July 1990 Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 900930 0CAN079020, Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790)1990-07-31031 July 1990 Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790) 0CAN079024, Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures1990-07-31031 July 1990 Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures 0CAN079015, Discusses Clarification to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Surveillance Sampling Being Performed Monthly & Analyzed Prior to Loading/Releasing Each Load to Russellville Municipal Sewage Sys1990-07-26026 July 1990 Discusses Clarification to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Surveillance Sampling Being Performed Monthly & Analyzed Prior to Loading/Releasing Each Load to Russellville Municipal Sewage Sys 0CAN079018, Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3)1990-07-24024 July 1990 Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3) 0CAN079021, Forwards Rev 12 to QA Manual Operations1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations 0CAN079019, Forwards Rev 12 to QA Manual Operations.W/O Encl1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations.W/O Encl 0CAN079017, Discusses Amend 8 to Plant Updated Sar.Certifies That Info Amend Represents Changes Made,Per 10CFR50.591990-07-23023 July 1990 Discusses Amend 8 to Plant Updated Sar.Certifies That Info Amend Represents Changes Made,Per 10CFR50.59 0CAN079010, Amends 880616 Response to Violations Noted in Insp Repts 50-313/88-11 & 50-368/88-11 Re Integrated Leak Rate Test. Procedure Rev Postponed & Will Be Incorporated Into Single Rev to Be Completed by 9103011990-07-20020 July 1990 Amends 880616 Response to Violations Noted in Insp Repts 50-313/88-11 & 50-368/88-11 Re Integrated Leak Rate Test. Procedure Rev Postponed & Will Be Incorporated Into Single Rev to Be Completed by 910301 0CAN079011, Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 9002161990-07-20020 July 1990 Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 900216 2CAN079008, Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps1990-07-17017 July 1990 Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps 0CAN079006, Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance1990-07-17017 July 1990 Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance 2CAN079001, Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip1990-07-0505 July 1990 Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip ML20043H5161990-06-19019 June 1990 Informs of Changes of Responsibility for Plant Emergency Plan,Effective 900605 ML20043H3121990-06-18018 June 1990 Forwards Responses to Remaining NRC Questions Re Seismically Qualified,Partially Protected,Condensate Storage Tank (Qcst).Analyses in Calculations Demonstrate That Qcst Tank Foundation & Drilled Piers Adequate W/O Mod ML20043F3321990-06-15015 June 1990 Submits Addl Info on Tech Spec Change Request for Seismic Instrumentation,Per 890809 Request.Licensee Concurs W/Nrc Recommendation Re Editorial Change ML20043G0661990-06-13013 June 1990 Responds to Deviations Noted in Insp Repts 50-313/90-11 & 50-368/90-11.Corrective Actions:Further Evaluations Conducted to Develop Optimum List of post-accident Instruments Requiring Identification on Control Panels ML20043H3471990-06-11011 June 1990 Forwards Rev 19 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043G3801990-06-11011 June 1990 Responds to Violations Noted in Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Decision Made to Staff Unit 1 Exit Location Point W/Health Physics Technician 24 H Per Day ML20043F5121990-06-0808 June 1990 Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606 ML20043E6561990-06-0707 June 1990 Requests That Listed Distribution Be Made on All Future NRC Correspondence.Correspondence to Ns Carns Should Be Addressed to Russellville ML20043F4341990-06-0707 June 1990 Informs of Receipt of Necessary Approvals to Transfer Operating Responsibilities of Plant to Entergy Operations, Per Amends 128 & 102 to Licenses DPR-51 & NPF-6, Respectively.Extension of Amend Request Unnecessary ML20043E4991990-06-0505 June 1990 Provides Supplemental Response to Violations Noted in Insp Repts 50-313/89-02 & 50-368/89-02.Corrective Actions:Listed Program Enhancements Being Implemented to LER Process to Provide Timely Determinations of Condition Rept ML20043E3851990-06-0404 June 1990 Concurs w/900516 Ltr Re Implementation of SPDS Complete for Both Units & Requirements of NUREG-0737,Suppl 1 Met ML20043E3771990-06-0404 June 1990 Forwards Response to Concerns Re Control Room Habitability Survey.Addl Mods Identified Will Enhance Overall Reliability of Control Room Sys & Changes Designed to Increase Performance,Effectiveness & Response of Habitability Sys ML20043C0821990-05-25025 May 1990 Withdraws 900410 Request to Amend Tech Spec Table 3.3-1 Re Applicable Operational Modes for Certain Reactor Protective Instrumentation Operability Requirements ML20043B6531990-05-22022 May 1990 Forwards Rev to Industrial Security Plan to Eliminate Need to Protect Certain Vital Areas of Plant.Rev Withheld (Ref 10CFR73.21) ML20043B7091990-05-21021 May 1990 Forwards Revised Maelu Certificate of Insurance for Nuclear Onsite Property Insurance Coverage for 1990,changing Policy Number from X89166 to X90143R ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043A5991990-05-15015 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Repts for Feb & Mar 1990 for Arkansas Nuclear One,Unit 1 ML20043B0841990-05-0909 May 1990 Corrects 900309 Ltr Re Completion of Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Design Change Package Addressing Perimeter & Interior Lighting Scheduled to Be Onsite Late Summer 1991 ML20042H0551990-05-0909 May 1990 Forwards Civil Penalty in Amount of $50,000 for Violations Noted in Insp Repts 50-313/86-23 & 50-368/86-24 Re Environ Qualification of Electrical Equipment Important to Safety. Comprehensive Corrective Actions Undertaken ML20043A8361990-05-0707 May 1990 Responds to Violations Noted in Insp Repts 50-313/90-05 & 50-368/90-05.Corrective Actions:Personnel Involved Received Counselling Re Incident & Operations Personnel Being Trained on Significance of Surveillance Requirements ML20042G4771990-05-0404 May 1990 Forwards Summary of Util Exercise Critique Board Evaluation of Radiological Emergency Preparedness Exercise REX-90,per Insp Repts 50-313/90-08 & 50-368/90-08 1990-09-07
[Table view] |
Text
e ARKANSAS POWER & LIGHT COMPANY POST DETIQ BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 June 22, 1981
@CAN@681@8 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Ccmmission Washington, D.C. 20555
SUBJECT:
Arkansas Nuclear One - Units 1&2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPR-6 NUREG-0612 " Control of Heavy Loads at Noclear Power Plants" (Generic Letter 81-07)
(File: 1510, 2-1510)
Gentlemen:
With reference to our letter dated May 15, 1981, we confirmed to you that AP&L had completed its work on the " Interim Actions for the Control of Heavy Loads" at Arkansas Nuclear One, Units One & Two. We
- also indicated that a report would be sent to you by June 1, 1981, that would sumnarize our actions relative to the information requested by Enclosure 2 of your December 22, 1980, letter. This report, sent to you in our letter dated May 29, 1981, also addressed specific work on the general requirements for overhead handling systems as referenced in Section 2.1 of Enclosure 3 of your December 22, 1980, letter on Page 2 of Item 1. We indicated to you that additional information would be forthcoming in order te meet the requested Section 2.1 response date of June 22, 1981. With the above as background information, the purposes of this letter are as follows:
(1) Interio Actions The first purpose of this letter is to reconfirm to you that AP&L has ,
completed its work on the " Interim Actions for Control of Heavy Loads" I at ANO-1 and 2. Specifically, the following items were considered in complying with the requested interim actions of Enclosure 2 of your December 22, 1980 letter:
f09 s 8106290307 /-
h MEMGER MIDOLE SOUTH UTIUTIES SYSTEM
. - c- ,
0, , .
..f x
- w s (CAN#68198 June 22, 1981 (1) , Safe load paths were defined per the guidelines of Section 5.1.1 (1) of NUREG-0612.-
(2) ' Procedures were developed and implemented per the guidelines of Section 5.1.1 (2) of NUREG-0612.
(3) Crane operators will be trained, qualified and conduct themselves per the guidelines of Section 5.1.1 (3) of NUREG-0612.
-(4) . Cranes'will be inspected, tested and maintained in accordance with the guidelines of Section 5.1.1 (6) of NUREG-0612.
(5) Special attention will be given to procedures, equipment and personnel for the handling of heavy loads over the core.
It is our position that we have adequately considered and positively addressed all significant aspects of the requested interim actions and are now in full' and complete compliance in every respect. All documentation is readily available at the plant site for your-inspection.
~
(2) Crane Design Verifications with CMAA and ANSI Standards The second purpose of this letter is to complete our response to Section 2.1 of Enclosure 3, " Request for Additional Information on Control of Heavy Loads" at ANO-1 and 2. The purpose of these analyses (see Attachment 1) was to verify that the various crane designs complied with the applicable CHAA and ANSI guidelines. Specifically, the following items were considered in complying with the requested
" General Requirements for Overhead Handling Systems" information contained in this and our May 29, 1981, correspondence:
(1) We reviewed our plant arrangements to identify all overhead handling systems from which a load drop may result in damage to any system required for plant shutdown or decay heat removal.
(2) We-reviewed the exclusion of any overhead handling system from the 'above category by verifying that there is sufficient physical separation from any load-impact point and any safety-related component to permit a determination by inspection d2at no heavy load drop can result in damage to any system or component required for plant shutdown or decay heat removal.
(3) We considered and developed where appropriate the following
, ~ specific information items with respect to the design and
r e
I 1-
- CAN968198 June 22, 1981 operation of heavy load handling systems in the containment and spent fuel area, and for those load handling systems identified in Item (1) above in this section:
(a) Drawings of sketches sufficient to clearly identify the location of safeload paths, spent fuel and safety-related equipment.
(b) A discussica of measures taken to ensure that load-handling operations remain within safe load paths, including procedures for any necessary deviations from these paths.
(c) A tabulation of heavy loads to be handled by each crane which includes the load identification, load weight, its designated lif ting device and verification that the handling of such load is governed by a written procedure containing, as a minimum, the information identified in NUREG-0612, Section 5.1.1 (2).
(d) Verification that lifting devices identified in (c) above, comply with appropriate ANSI standards. Describe
, . _ , alternatives where appropriate.
(e) Verification that ANSI B30.2-1976, Chapter 2-2 has been considered with respect to crane inspection, testing, and maintenance.
(f) Verification that the various crane designs comply with applicable CHAA and ANSI guidelines.
(g) Exceptions to these guidelines with respect to operator training, qualification, and conduct.
With the submittal of Attachment I to this letter and the Attachment to our May 29, 1981, letter, it is our position that we have adequately considered and positively addressed all significant aspects of the requested Section 2.1 information, " General Requirements for Overhead Handling Systems". Our conclusion is that we are iu general compliance with all Section 2.1 reporting requirements. For completeness, however, we will actively pursue to the fullest extent practicable the currently unavailable crane manufacturer's proprietary data identified in Attachment 1 to'this letter.
(3) Response Date Extension Requests The third purpose of this letter is to request your approval of the following extensions to the indicated response dates. Part of Item (1) on page 2 of your December 22, 1980, letter requested that we
p . ,e l 9CAN9681p8 June 22, 1981 submit Sections 2.2, 2.3 and 2.4 information within nine months of December 22, 1980. Items (2) and (3) of this same letter each had requested response dates of within six months of December 22, 1980.
Due to the nature of the complexities involved, we request a three-month extension to the response dates for each of these three items. By extending the duc dates to December 22, 1981, September 22, 1981, and September 22, 1981, respectively, we would be able to perform a more meaningful engineering analysis and assessment of the information requested.
(4) Overvie_w of NUREG-0612 Status The fourth purpose of this letter is to provide you with an overview of our-present NUREG-0612 status. To date AP&L has spent approximately
$120,000 on addressing NUREG-0612. The following information was requested on page 2 of your December 22, 1980, letter:
Requested
. Description of Original Extension Item Requested Information Due Date Date
- 1. Submit Section 2.1 informa- June 22, 1981 Completed
_, tion within six months of December 22, 1980.
Submit Sections 2.2, 2.3, Sept. 22, 1981 Dec. 22, 1981 and 2.4 information within nine months of December 22, 1980.
- 2. Furnish confirmation June 22, 1981 Sept. 22,1981 -
within six months that implementation of those changes and modifications you find are necessary will commence as soon as possible without waiting on staff review, so that all such changes, beyond the above interim actions, will be com-pleted within two years of submittal of Section 2.4 for the above report.
o L-? ' -
?
I pCAN968198 June 22, 1981
- 3. Furnish justification with- June 22, 1981- Sept. 22, 1981 in six months for any changes or modifications that would be required to fully satisfy.the guidelines of NUREG-0612 which-you believe are not necessary.
Altho 2gh our engineering analyses are not complete as yet, preliminary indications are that no crane hardware modificaticn: will be required at ANO-1 or 2 in order to meet the intent of NUREG-0612. With your approval, we will keep you advised as to our progress and conclusions per the above revised response schedule. Should you have any questions before our next scheduled reponse date, please advise.
Sincerely, David C. Trimble Manager, Licensing DCT:DET/jm Attachment
.)
4 ATTACHMENT 1 Response to Item 3(f)
SECTION 2.1, ENCLOSURE 3, " REQUEST FOR ADDITIONAL INFORMATION ON CONTROL OF HEAVY LOADS" SIX-MONTH REPORT TO THE NRC Discussion Arkansas Power & Light Company has completed its evaluation of crane design compliance for the overhead load handling systems at Arkansas Nuclear One which fall within the realm of the requirements of NUREG-0612. Design compliance with CMAA Specification No. 70 and Chapter 2-1 of ANSI B30.2-1976 was evaluated for the following cranes:
Unit 2 Polar Crane - 2L2 New Fuel Handling Crane - 2L35 Unit 1 Polar Crane - L2 Fuel-Handling Crane - L3 Auxiliary Fuel Handling Crane Intake Structure Gantry Crane The results of our evaluations are presented below.
2L2 and 2L35 The first two cranes listed, 2L2 and 2L35, were designed and constructed to CMAA-70 which further addresses compliance with ANSI B30.2.0. Both of these cranes, therefore, fully comply with the requirements of CF.AA Spec.
No. 70 and Chapter 2-1 of ANSI B30.2-1976.
L2 and L3 the Unit 1 Polar Crane, L2, and the Fuel Handling Crane, L3, were designed and constructed prior to the issuance of CMAA-70 and ANSI B30.2-1976. Both cranes, however, were built to EOCI Specification No.
61, Specifications for Electric Overhead Traveling Cranes, which was superceded when CMAA-70 was issued. EOCI-61 is very similar to CMAA-70, with very few additional or revised criteria exhibited in CMAA-70.
Approximately half of the CMAA-70 requirements are equivalent to (verbatim) E0CI-61 requirements. Arkansas Power & Light Company, therefore, performed a point-by point review of CMAA-70 and ANSI B30.2 requirements to determine the design compliance for L2 and L3.
For only one criteria did both L2 and L3 prove to be in specific noncompliance with the standards. Criteria 4.4.3.1 of CMAA-70 recommends that the minimum hoist groove depth be equal to 3/8 x hoist rope 1
s diameter. For the auxiliary hoists of L2 and L3, this minimum depth was not met by 1/64 and 1/32 inch respectively, which corresponds to a 6.7%
and 11.1% deviation.- It is the position of Arkansas Power & Light Company that the actual hoist groove depths provide sufficient margin of load handling safety.
Also, several items for which compliance could not be proved, due to unavailability of manufacturer's proprietary data and calculations, were identified during the evaluation. Arkansas Power & Light Company will attempt to obtain this information, however, these items are not considered significant to load handling safety for the following reasons:
- ~The intent of the CHAA nr ANSI criteria is met by the corresponding EOCI-61 criteria.
Both L2 and L3 have been operated since 1974 and load tested without structural mishap or wear beyond expected values.
'Both L2 and L3 have received the manufacturers recommended maintenance since being placed in operation.
The items for which compliance could not be proved are:
CMAA-70 (3.3.2.1.3.2 and 3.3.2.1.3.3) specify that twisting moments be calculated using the distances between the respective centers of gravity and the shear center of the girder section. EOCI-61
-- (18.B.1.c(2) and 18.B.I.c(3)) specify this distance to the center of gravity of the girder section.
CMAA-70 (3.3.3.1) specifies design limitations for welded box girders which differ slightly or expound upon the limitations provided in EOCI-61 (18.C.1).
CMAA-70 (3.4.3) specified allowable vertical stresses for bridge end trucks. EOCI-61 (19.C does not specify these allowable stresses.
CHAA-70 (3.5) and ANSI B30.2 (2-1.7.2.a) both specify that footwalks be designed for a live load @ 50#/ft.2 EOCI-61 (20) does not specify this particular loading. CMAA-70 (3.5) additionally specifies allowable steel stresses for footwalks.
CMAA-70 (3.7) specifies allowable steel stresses for trolley frames.
EOCI-61 (22) does not specify these stresses.
ANSI B30.2 (2-1.9.4.i and 2-1.9.5.a) specify that trolley and bridge brakes have torque capability to stop motion within 10% of the rated load speed when traveling ar. full speed with rated load. EOCI-61 (31.A and 31.C) do not specify this requirement.
- ANSI B30.2 (2-1.9.2.b, 2-1.9.3.b, 2-1.9.4.k, and 2-1.9.5.d) specify that trolley, bridge, and hoist brakes have thermal capacity for the frequency of service. EOCI-61 (31) does not specify this criteria.
2
p
. J-
- CMAA-70 (4.5.2) specifies allowable values of torsional deflection for bridge cross shaf ts. EOCI-61 (28.A) does not specify these values. This criteria applies to L3 only.
- CMAA-70 (4.12.1 and 4.12.3) specify deceleration rates for bridge and trolley bumper design. ANSI B30.2 (2-1.8.2.a.2 and 2-1.8.3.a.2) apecify same. EOCI-61 does not specify criteria for bumpers, however, the AP&L design specifications for L2 and L3 require bumpers wn*ch meet all other CHAA and ANSI criteria.
- - CMAA-70 (5.4.6.8) specifies that failure of any hoist control component shall not permit excessive hoist speed in either direction. L2 and L3 design specifications require compliance with this criteria only in the lowering direction.
CMAA-70 (5.4.6.10) recifies that the crane manufacturer shall state in his proposal whether hoist motor horsepower is based on average hoisting and lowering speed or actual hoisting speed required to raise the rated load.
Auxiliary Fuel Handling Crane The Auxiliary Fuel Handling Crane is a 2-ton standard manufacturer's motorized-trolley hoist. It is suspended monorail fashion from a 12 inch I-beam welded to one of the main bridge girders of L3. The standard
_ hoist is outside the scope of CMAA-70 and ANSI B30.2 per Section 1.1.2 and 2-0.1 respectively. However, since the hoist is integral with L3, certain CMAA and ANSI requirements should be met by the hoist, particularly where the structural integrity of L3 is affected. Since the Auxiliary Fuel Handling Crane was included in the design of L3, any items for which specific compliance with CHAA-70 or ANET 930.2 requirements could not be met were identified in the evaluatio- of L3.
The Auxiliary Fuel Handling Crane was also reviewed with respect to ANSI B30.11-1973, Monorail Systems and Underhung Cranes, and ANSI B30.16-1973, Overhead Hoists. Crane design and construction were found to comply with the intent of both of these standards.
El The Intake Structure Gantry Crane, L7; was designed and constructed prior to issuance of CMAA-70 and ANSI B30.2-1976. This crane was, however, built to EOCI Specification No. 61, Specifications for Electric Overhead Traveling Cranes. Arkansas Power & Light Company performed a point-by point review of CMAA-70 and ANSI B30.2 requirements to determine the design compliance for L7.
The crane was found to be in specific noncompliance with only one criteria.
ANSI B30.2 (2-1.3.1.d) specifies that outdr sr storage gantry cranes shall be provided with remotely operated rail c.2mps or equivalent devices.
3 L.
Also,'.a wind indicating device is required which will give a visible and audible alarm to the crane operator at a predetermined-wind velocity. L7 is not provided.with remotely operated rail clamps or'with a wind
' indicating alarm. L7 does, however, have a storm lock which, by procedure, is engaged by plant personnel upon receipt of a severe weather waring from the AP&L system dispatcher (who obtains his information from an AP&L meteorological system and the National Weather Service).
Additionally, the onsite meteorological system continuously monitors wind speed and direction. It is the position of Arkansas Power & Light that-the intent of.this ANSI requirement is met per the above discussion, and that a potentially hazardous load handling condition does not result from this item.
Also several items for which specific compliance could not be proved, due to unavailability of manufacturer's proprietary data and calculations, were identified during the evaluation. As stated in the discussian for cranes L2 and L3 above, Arkansas Power & Light Company will attempt to obtain this information; however, these items are not considered significant to load handling safety.
The items for which compliance tauld not be proved are:
ANSI B30.2 (2-1.3.1.b) specifies that every outdoor crane shall be provided with secure fastenings convenient to apply and to hold the crane against a wind pressure of 30 pounds per sq: tare foot. Crane L-7 has a storm lock to secure it, however, design data to show
- compliance was not available.
CHAA Spec. 70 (3.3.2.1.3.2, 3.3.2.1.3.3) spectfy that twisting moments for girders be calculated using the shear center of the girder whereas E0CI Spec. 61 (18.B.c.(2), (3)) specify that twisting moments be calculated using the center of gravity of the girder.
- CMAA Spec. 70 (3.3.2.2) specifies that the combined bending stress for girders shall be calculated including a wind load of 5 pounds per square foot for outdoor cranes whereas EOCI Spec. 61 does not include a wind load for calculating the combined bending stress.
CHAA Spec. 70 (3.3.3.1.1 .5) specify proportions, moments of inertia for longitudinal stiffeners, basic allowable stresses, requirements for stiffened plates in compression, and requirements for diaphragms and vertical stiffeners for welded box type girders. These sections specify several additional requirements not addressed in EOCI Spec.
- 61. >
- CMAA Spec. 70.(3.4.3) specifies allowable vertical stresses for bridge end trucks. These are not specified in EOCI Spec. 61.
- CHAA Spec. 70 (3.5) and ANSI B30.2 (2-1.7.2.a) require that all footwalks be designed for a live load of 50 pounds per square foot.
CHAA Spec. 70 (3.5) further specifies allowable steel stresses for footwalks. These requirements are not addressed in EOCI Spec. 61
-(20).
4
I -
e
-9 ,
CHAA Spec. 70 (3.7) specifies allowable vertical stresses for trolley frames. These stresses are not addressed in EOCI Spec. 61.
- CMAA Spec. 70 (3.9) specifies special requirements for leg, end tie, strut, and sill members of gantry cranes. These requirements are not contained in EOCI Spec. 61.
- CMAA Spec. 70 (4.4.3.1, 4.4.3.2) recommend a minimum drum groove depth of 3/8 x rope diameter and minimum drun groove pitch of either 1.14 x rope diameter or diametet + 1/8 inch, whichever is smaller.
These requirceents are in addition to the drum design requirements contained in EOCI Spec. 61 (26).
- ANS1 B30.2 (2-1.9.4.i, k and 2-1.9.5.b) specify thermal capacity adequacy, deceleration capability, and- torque capability (with respect to stopping distance) of bridge and trolley brakes.
ANSI B30.2 (2-1.9.2.b, 2-1.9.3.b) specify that holding and control brakes on hoists shall have thermal capacity for the frequency of operation required by the service.
CMAA Spec. 70 (4.11.1, 4.11.4) specify wheel tolerance and clearance requirements. These requirements are not addressed in EOCI Spec. 61 (32).
- CMAA Spec. 70 (4.12.1(i), (i)A) and ANSI B30.2 (2-1.8.2.a.1, .2)
-. specify bridge bumper deceleration rate and energy absorbing capcity requirements. These requirements are not addressed in EOCI Spec.
61.
ANSI B30.2 (2-1.3.2.b.2) specifies runway stops be designed to withstand forces resulting from collisions at speeds of at least 40%
of rated speed.
CMAA Spec. 70 (4.12.3.(i)) specifies trolley bumper average rate of
- deceleration requirements. This requirement is not addressed in EOC1 Spec. 61.
ANSI B30.2 (2-1.8.1.b, 2-1.8.3.a.1, 2) specify trolley bumper and stop enetgy absorbing capacity and rate of deceleration requirements.
CMAA Spec. 70 (5.4.6.1) specifies that static power components such as rectifiers, reactors, etc., as required, shall be rated in accordance with the horsepower, voltage, and time ratings of the motor with which they are used. This requirement is not addressed in EOCI 61 (36).
CMAA Spec. 70 (5.4.6.8) specifies that the failure of any hoist control component shall not permit excessive hoist motor speed in either direction. This requirement is not addressed in EOCI 61 (36).
5
r
- CHAA Spec. 70 (5.4.6.10) specifies that the crane manufacturer shall state in his proposal' whether the hoist motor HP used with static control is -on the basis of average hoisting and lowering speed, or on the basis of actual hoisting speed to raise rated load. This requirement is not addressed in EOCI 61.
~
4 4
G i
e.
f 6