UNITED STATES
., w
NUCLEAR REGULATORY COMMISslON
l
fj
nEcion i
et
C
631 PARK AVENUE
MING OF PRUS$1 A, PENNSY wVANI A 19404
.....
,
n
OCT e
120
3
=
P
Docket No. 50-289
R
C
,q
!G
- .
Metropolitan Edison Company
1
$$
'
ATTN: Mr. R. C. Arnold
Me
{
a
$
l
Senior Vice President
,
100 Interpace Parkway
-m
Parsippany, New Jersey 07054
U
1)
,s
y
,
Gentlemen:
d
Subject:
Inspection 50-289/80-27
This refers to the special inspection conducted by fir. L. Bettenhausen of this
office on September 10-30, 1980 at Middletown, Pennsylvania of activities authorized
by NRC License No. DPR-50 and to the discussions of our findings held by Mr.
Bettenhausen with Mr. R. Toole of your staff at the conclusion of the inspection.
'
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosee with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Wittin the scope of this inspection, no items of noncompliance were observed.
l
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
,
l
accompanied by an affidavit executed by the owner of the information, which
l
identifies the document or part sought to be withheld, and which contains a
!
statement of reasons which addresses with specificity the items which will be
l
considered by the Commission as listed in subparagraph (b) (4) of Section
i
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
l
Document Room.
.
No reply to this letter is required; however, if you should have any questions
l
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
l
l
C
l
____
-
l
E1
. Brunner, Chief
~
Rea tor Operations and Nuclear
Support Branch
.
___
,
,
s
!
Metropolitan Edison Company
2
OCT. S
1300
Enclosure:
Office of Inspection and Enforcement Inspection
.
Report Number 50-289/80-27
cc w/ enc 1:
J. G.~Herbein, Vice President-Nuclear Operations
R. J. Toole, Manager, Unit 1
W. E. Potts, Manager, Radiological Controls, Unit 1
J. J. Colitz, Manager, Plant Engineering, Unit 1
L. W. Harding, Supervisor of Licensing
R. F. Wilson, Director - Technical Functions
E. G. Wallace, Licensing Manager
I. R. Finfrock, Jr.