ML19344E273
| ML19344E273 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/24/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| References | |
| NUDOCS 8008280295 | |
| Download: ML19344E273 (1) | |
Text
.
~
O J Franklin Research Center A Division of The Franklin Institute August 20, 1980 United States Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. Edward J. Butcher, Jr.
Project Officer O!S 416)
Reference:
Plant Name:
R. E. Ginna Rochester Gas and Electric Corporation Utility:
Docket:
50-244 NRC TAC No.:
12381 SEP Plants, Topic III-12, Project:
Electrical Equipment Environmental Qualification (EEQ)
FRC Project / Task No. C5257/178 Draf t Interim Technical Evaluation Report / Formal Issue
Subject:
Dear Mr. Butcher:
On August 7, 1980, NRC requested that FRC prepare, where applicable, a proprietary and a non-proprietary version of the Draf t Interim Technical Evaluation Report for the area of Equipment Environmental Qualification.
In accordance with this resolution, please find enclosed the Draf t Please note Interim Technical Evaluation Report on the referenced subject.
that a proprietary and a non-proprietary version of the subject report is enclosed. The reports are clearly marked:
WORKING COPY, FOR INTERNAL USE ONLY, e
CONTAINS PROPRIETARY INFORMATION -
(This is the proprietary version designated as FRC Task 178 dated August 20, 1980.)
WORKING COPY -
e (This is the non-proprietary version designated as FRC Task 178(NP), dated August 20, 1980.)
l We request that you' process the proprietary version of the referenced report in accordance with NRC internal procedures for the handling of y proprietary information.
s Very truly yours, bI SLD f de
-g S. P. Carfa,..o 7G4 bibh b kG$
I Project Manager
.A p/ : 3 3
- 231'"
8omoo 2W Z. Rosztoczy - 1/1 copy-cc:
J. Lombardo - 6/6 copies The Benjamin Franklin Parkway Philadelphia,Pa.19103 (215)448-1000 TWX-710 6701889 i