Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
-
's
- s;> ,
z i'
llcl._ plY. ..
W a:. ..
Wisconstn Q
i% '
1Electnc PCNER COMPANY:
y..
30 231 W Michigan Po. Box 2046. MMaukee. WI 53204 (414)221 2345 p b. , <
e
..', .VPNPD-89-640 NRC-89-154 a !'
4 .jL December 8, 1989 NUCLEAR: REGULATORY COMMISSION -
iDocument Control Desk Mail; Station'P1-137-
. Washington, D.;C..'20555 Gentlemen: . .<
3 l
QQCKETS'50-266"AND 50-301' I MONTHLY OPERATING' REPORTS ,l POINT BEACH NUCLEAR PLANT, UNITS 1 AND-2
-Aktached are: monthly / operating reports for Units 1 and 2, o<
Point Beach Nuclear Plant, for the calendar month of November 1989; i
'f l Very.truly.yours, j
~
W "
j#7 C. W Fay.
Vi President
.N clear Power Attachments ;
i
-Copies to'R. S. Cullen, PSCW NRC Regional Administrator, Region III m
NRC Resident Inspector 8912130236 891130 PDR= ADOCK 05000266 .
R PDC 7 AsawwyonnuwuhDexynepomwa y
.e
, 6:
s OPERATING DATA REPORY s DOCKET NO. 50-266 .
DATE December 7, 1989 COMPLETED BY C. W. KRAUSE TELEPHOPE 414 221 2001 OPERATING STATUS
- 1. UNIT NAME! POINT BEACH NUCLEAR PIANT UNIT 1 . NOTES .
- 2. FMPORTING PERIOD: NOVEMBER 1989 . .
- 3. LICENSED THERMAL POWER (MWT): 1518 . .
- 4. NAMEPLATP: .lATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRI"AL RATING (NET MWE): 497. . .
G. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
- 7. MAXIMUM DEPL*NDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, 1F ANY (NET MWE}: NOT APPLICABLE
- 10. FEASONS FOP RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH TR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 8,016 167,160
- 12. NUMBER OF HOURS REACIOR WPLS CRITICAL 720.0 6,984.3 137,599.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
- 14. HOURS GENERATOR ON LINE 720.0 6,962.8- 134,795.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,081,457 10,001,058 187,343,882
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 358,2PO 3,394,010 63,223,060
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 352,341 3,240,328 60,224,796
- 19. UNIT SERVICE FACTOR 100.0 86.9 80.6
- 20. UNIT AVAILABILITY FACTOR 100.0 86.9 81.1
- 21. UNIT CAPACITY FACTCR (USING MDC NET) 100.9 83.3 73.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.5 81.3 72.5
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.8
- 24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Forty-two day refueling and maintenance outage scheduled to comance March 30, 1990.
I
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CAICULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 4 g- p g g. W y*m ,. ,,, .1e .:. p w g ya. p & 9 y m <vw.- -+-ee--a..+ -4ar+--va..
_..__--x.-_- _ _ - _- . _ - -
.n-
. DOCKET NO.- 50-266 ..~ .
UNIT NAME- Point Beach, Unit 1 . *-
DATE December 7, 1989 COMPLETED BY C. W. Krause TELEPHONE -414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH NOVEMBER 1989 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL FOWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 494 11 486 21 495 2 493 12 474 22 494 3 494 13 495 23 494 4 495 14 495 24 494 5 491 15 496 25 495 6 495 16 495 26 495 7 486 17 495 27 495 8 455 18 495 28 496 9 454 19 494 29 495 10 456 20 496 30 495 EQR-28a (04-86)
.e
. .. UNIT STCTDOWNS AND POWER REDUCTIONS DOCKET NO.- 50-266 _.
UNIT NAME Point Beach Unit 1 DATE December 7, 1989 - '
REPORT MONTH NOVEMBER 1989 COMPLETED BY C. W. Krause.~
TELEPHONE 414/221-2001 c
3:
O 4 d^ N 4-4 Q n C O to c O 1-4 o
.* -e-4 14 O tP O IEe dn e 90 vs 'o c o vo Oc g g Licensee Event gy No. Date g o g] 'Cause & Corrective Action a s- m $gOvo Report No. >,o Ou To Prevent Recurrence o ose m u 2:.c v2 1F: Forced 2 Reason: 3 Method:
- Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load 5 Exhibit H-Same Source F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Other (explain)
EQR-28B (00.-87) -
- +.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit 1 Date December 7, 1989 Completed By C. W. Krause
, Telephone 414/221-2001 Unit 1 operated at approximately 494 MWe net throughout the
! period with no major load reductions.
On November 7, 1989, it was discovered that the Point Beach Nuclear Plant was in a condition which was outside.of the requirements of TS 15. 3. 7.B.1. f and 15. 3. 7.B.1.g . These TS state:
L "15.3.7 B.1.f: One of the batteries, DOS or D06, may be inoperable for a period not exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided the other three batteries and four battery chargers remain operable with one charger carrying the DC loads of each DC main distribution bus."
"15.3.7.B.1.g: One of the batteries, D105 or D106, may be inoperable for a period not exceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided the other three batteries and four battery chargers remain operable with one charger carrying the DC loads of each DC main distribution bus."
On November 9, 1989, at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, the PBNP Manager's Supervisory Staff determined that the DOS and D06 station batteries were technically inoperable as a result of the discovery of an original plant design deficiency which could render one or both of the two plant main DC systems inoperable as a result of a single bus fault. The potential problem had been reported to the manager - PBNP at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> by our corporate l headquarters Nuclear Engineering group. Upon arrival at the plant site approximately two hours, the issue was presented to the Manager's Supervisory Staff. LER 89-009 was written to document this incident.
1 During the steam generator crevice flush, the steam generator i specific auxiliary flow indicators from the aux feed line into the steam generator were supposed to be isolated. The flow indicators from Unit 1 were isolated rather than Unit 2. They were left in i this condition for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. This is a condition L prohibited by Technical Specifications. LER 89-010 is being l drafted to document this incident.
l e
'O OPERATING DATA REPORT .
DOCKET NO. 50-3~J1 -
DATE December 7, 1989 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
- 2. REPORTING PERIOD: NOVEMBER 1989 . .
- 3. LICENSED THERMAL POWER (MWT): 1518 . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . ..
O. IF CHANGES OCCUR IN CAPACITT RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANT (URT MhT,): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6.016 151,945
- 12. NUMBER OF HOURS REACIOR WAS CRITICAL 168.0 6,499.6 132,601.8
- 13. REACTOR RESERVE SHUTDOWN HOUES 0.0 0.6 216.7
- 14. HOURS GENERATOR ON LINE 132.0 6,364.7 130,461.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 4.8 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 141,690 9,514,380 185,460,214
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 47,730 3,263,740 62,937,440
- 18. NET ELECTRICAL ENERGY GENERATED (HWH) 42,431 3,112,332 59,966,754
- 19. UNIT SERVICE FACTOR 18.3 19.4 85.9
- 20. UNIT AVAILABILITY FACTOR 18.3 79.5 86.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 12.2 80.1 80.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 11.9 78.1 79.4
- 23. UNIT FORCED OUTAGE RATE O.0 2.0 1.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (T!PE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHisTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUEtTTED IN NRC LETTER DATED SEPTEMBER 22, 1977
m .. - . . = _ . - - __ .__
DOCKET NOo. 50-301 . c. ...
UNIT ~NAME Point Beach, Unit'2' .
DATE December 7, 1989 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERI.GE DAILY UNIT POWER LEVEL MONTH ' NOVEMBER 1989
. AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER' LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -2 21 -12 2 -2 12 -2 22 -14
-3 -2 13 -2 23 -13 4 -2 14 -2 24 -14 5 -2 15 -2 25 35 6 -1 16 -2 26 116 7 -2 17 -5 27 262 8 -2 18 -11 28 460 9 -2 19 -3 29 501 10 -2 20 -3 30 500 EQR-28a (04-86)
- l, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 6 -
UNIT NAME Point Beach Unit 2 DATE December 7, 1989 REPORT MONTH NOVEMBER 1989 COMPLETED BY C. W. Krause ~
TELEPHONE 414/221-2001 5
o 9 C^ es M D es C o U2 c o La e
- H ks o tP o Ev ce e 43 OC4 ee oe No. Date g yy t/J y "y y Licensee Event #y g] Cause & Corrective Action E-4 c- cr; ooe Report No. No oo To Prevent Recurrence o e c cr: m o
- E: .c m
4 ;390923 S 588 C 4 Not Applicable ZZ ZZZZZZ Continue the annual refueling and maintenance outage.
5 .391125 S 1 B 6 Not Applicable ZZ ZZZZZZ Overspeed testing.
"F: Forced 2 Reason: 3 Method:
- Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load sExhibit H-Same Source F - Administrative 6 --Other (explain)
G - Operational Error (explain)
H - Other (explain)
EQR-28B (04-87)
t - .
,, eo NARRATIVE
SUMMARY
OF OPERATING EXPEPIENCE i-Docket No. 50-301 Unit Name Point Beach Unit 2 Date December 7, 1989 Completed By C. W. Krause Telephone 414/221-2001 The Unit 2 refueling and maintenance outage was completed November 25, 1989, when the unit was phased back on line. The '
unit'was taken off line for about one hour during the turbine overspeed testing and was phased back on at 9:32 p.m. on November 25, 1989.
Major work completed includes replacement of D06 station battery, replacement of the B main feedwater pump, performance testing of the D105 and D106 station batteries, and repair and replacement of damaged low pressure turbine blades.
On November 3, 1989, during refueling operations, contractor personnel generated a false trip signal while investigating a wiring discrepancy in the reactor protection system instrument >
racks. The reactor was defueled and the reactor trip breakers were open. Therefore, no safety-related equipment started.
An original wire labeling error was considered the root cause of '
the event.- LER 89-008 was written to document this event.
During the test of the emergency lighting, a lighting breaker was opened as a part of the test. At the same time the steam generator level indication was being tested and an " artificial" steam generator level generator was plugged into a lighting receptacle. The breaker opened for the emergency lighting also supplying power for the steam generator level generator. When the breaker was opened, the steam generator level lost power and indicated a "no level" in the steam generator. This caused a trip signal to be generated. LER 89-009 is being drafted to document this event.
. ,