ML19329F219

From kanterella
Jump to navigation Jump to search
Motion to Lodge W/Aslab FPC Order Approving Settlement & Underlying Settlement Agreement.Certificate of Svc Encl
ML19329F219
Person / Time
Site: Midland
Issue date: 04/26/1977
From: Jablon R
MICHIGAN MUNICIPAL COOPERATIVE POWER POOL, SPIEGEL & MCDIARMID
To:
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
NUDOCS 8006230744
Download: ML19329F219 (134)


Text

IlETis] TO EM.C.?l CETSI. Fil13 U..i C..,id

,=

UNITED STATES OF AMERICA dO'}h BEFORE THE THIS DOCUMENT CONTAINS NUCLEAR REGULATORY COMMISSION P00R QUAllTY PAGES APPEALS BOARD 1h g

In the Matter of

)

)

Consumers Power Company

)

Docket Nos. 50-329A_

(Midland Units 1 and 2)

)

5D-330A MOTION TO LODGE SETTLEMENT AGREEMENT The Cities of Coldwater, Grand Haven, Holland, Traverse City and Zeeland, the Northera Michigan Electric Cooperative

(" Northern"),

the Wolverine Electric Cooperative ("Wolverins") and the Michigan Municipal Electric Association ("MMEA"), collectively referred to as " Michigan Cities and Cooperatives" respectfully request per-mission to lodge with this Appeals Board an " Order Approving Settlement," Consumers Power Comoanv, Docket No. ER76-45, before the Federal Power Commission and the underlying settlement agreement.

Since this Motion should be noncontroversial, they attach the documents.

Is support of this Motion, Michigan Cities and Cooperatives state as follows:

1.

On July 30, 1975, Consumers Power Company

(" Consumers Power") filed with the Federal Power Commission pro-posed rate increases and tariff changes applicable to wholesale electric service.

2.

Intervention was sought by and granted to the cities of Bay City, Charlevoix, Coldwater, Harbor Springs, Hillsdale, Marshall, Petoskey, Portland, St. Louis and Union City, the Village of Chelsea, and the Southeastern Michigan Electric Cooperative, Inc., as 80082so ? yy g

e i well as to Edison Scult Electric Company and Alpena Power Company.

One of the cities in the above group, Coldwater, is an intervenor in this proceeding and cther cities are members of the Michigan Municipal Electric Association.

These cities and the South-I eastern Michigan Electric Cooperative, Inc. rairad issues concerning alleged anticompetitive conduct on the part of Consumers Power Company.

Some of the issues raised relate to concerns that are presently before this Appeals Board for decision.

j 3.

The parties agreed to settle the Federal Power Commission rate case without determination on the merits of anti-trust issues, which issues are before this Board for decision.

The settlement provides (page 7, Settlement paragraph 10):

l "Cortsumers Power is presently a party to antitrust l

proceedings at the Nuclear Regulatory Commission with regard to its application to construct Midland Nuclear Units 1 and 2 (NRC Docket Nos. 50-329A, 330A) (hereafter " Midland antitrust proceeding").

Consumers Power agrees that it will not ask a court of competent jurisdiction to stay a final order of the Nuclear Regulatory Commission in the Midland antitrust proceeding which imposes license conditions; provided, however, as follows:

a.

Such final order is issued prior to July 1, 1977; b.

In the event that such license conditions require Consumers Power to Tke action which results in the filing of agreements or other documents at the Federal Power Commission, each party hereto agrees that such filings shall, unless Consumers Power chooses other-wise, contain provisions which (1) automatically terminate the filing and any Company obligation thereunder on the date such license conditions are held by competent legal authority to be unlawful or otherwise inoperative, and-(2) provide that the filing shall not be effective unless the automatic termination provision just described is accepted l

I'

, without qualification by the FPC.

The automatic i

termination provision of such filings shall provide that Consumers Power Company will promptly advise 1

the Commission and any party affected thereby as to the date on which the termination provisions of the filing became effective; provided, however, that cuch communication shall not be deemed to be a

' change' in rates, charges, classifications or service or in any rule, regulation or contract relating thereto, as provided in Section 205(d) of the Federal Power Act, and shall also not be deemed to be a 'new schedule,' as provided in Section 205(e) of the Act; and Nothing contained herein shall limit the right of c.

any party hereto to:

(i) petition for reconsideration of any order of the NRC or any Board thereof; (ii) pursue an appeal or petition to review before any appellate body it chooses; (iii) seek a stay of any court order which modifies in any respect the final order of the NRC; (iv) seek an expedited appeal at any level; or (v) seeks a stay from the NRC or any Board thereof of any order of the NRC or any Board thereof. "

i The settlement provides (page 9, Settlement paragraph 12):

"No party hereto shall be deemed to have waived, approved, accepted, agreed to or consented to (a) any principle 1

of rate-making, cost of service determination, allocation method, or rate design formula, terms and conditions of service or any other principle underlying or supposed to underlie any of the rates provided for herein or (b) any allegations or defenses relating to actual or potential anticompetitive or discriminatory practices raised in this proceeding."

The settlement was filed December 10, 1976, with the Federal Power Commission.

4.

The substance of the settlement is that Consumers Power Company will implement any final order of the NRC without seeking a judicial stay.

While not waiving their claims, the parties to the FPC rate case agreed to forego trial of anticompetitive claims that might have asserted before the Federal Power Commission, pending resolution of the issues by this Appeals Board.

. Respectfully submitted, k-M bb Robert A. Jablon Attorney for the cities of Coldwater, Grand Haven, Holland, Traverse City and Zeeland, the Northern Michigan Electric Cooperative, the Wolverine Electra Cooperative, and the Michigan Aunicipal Electric Association, all in Michigan April 26, 1977 Law Offices of:

Spiegel & McDiarmid 2600 Virginia Avenue, N.W.

Washington, D.C.

20037 202-333-4500 t

ne r-r-

e APPENDIX A

" Order Approving Settler.ent," March 7, 1977 "Irrata Notice," March 31, 1977

UNITED STATES OF AMERICA FEDERAL POWER COMMISSION ELECTRIC RATES:

SETTLEMENT Richard L. Dunham, Chair =an; Before Cc=missioners:

Don S. Smith, John H. Holloman III, and James G. Watt.

Consumers Power Cc=pany

)

Docket No. ER76-45 ORDER APPROVING SETTLEMENT (Issued March 7,1977)

On December 16, 1976, the Presiding Adminis trative Law Judge in this proceeding certified to the Ccuaissien a proposed Settlement Agreement together with the evidentiary record and -

certain exhibits and tes ti=ony not intrcduced in the for=al proceedings.

The Cc-aission finds that the Settlement Agreement is in the public interest and accepts and approves it as hereinafter ordered and conditioned.

Proceedings were initiated on July 30, 1975 when Consu=ers Power Ccmpany (Consc=ers) submitted for filing proposed rate increases under eighteen FPC rate schedules totaling $5,065,568.

By order issued August 29, 1975, the Cc-aission accepted the proposed rate increases for filing, suspended them for one month, and permitted them to become effective September 30, 1975.

(,

The Cc= mission instituted a separate proceeding under this decket designated as Phase II to investigate allegations by an intervenor, Publicly Owned Sys tems (Sys tems), of certain anti-cc=petitive practices cf Consumers concerning pooling and arrangements of interchange and coordination.

Phase I concerned the lawfulness and reasonableness of the rates and charges proposed in the filing.

~

As a result of a. formal settlement conference held on June 3,1976 and other discussions between the parties, an uncon-tested settlement agreement was reached.

The settlement is proposed co dispose of issues in both Phase I and Phase II of this proceeding.

'The settlement rate would provide a rate increase of

$4.058 million.

K-A-17 S

  • e.

e

,m

,y w

r g-r-g

Dcchet No. ER76-45

. t

...i.,.

,' E. :':

Consu=ers is p~res ently a party to antitrust proceedings at the Nuclear Regulatory Cc==ission with regard to its appli-cation to cons truct Midland Nuclear Units 1 & 2 (Dccka t Nos. 50-329A and,330A).

Under the propesed settle =ent, Censu=ers agrees not to request stay of a final order of the NRC in the Midland anti-trus t proceeding.

Censu=ers so agrees subj ect to certain provisiens, a=cng the=, that in the event that the NRC license conditiens require Ccnse:ers to file new agree =ents with the FPC, these filings will conta'in previsiens to autc=atically ter=inate should they be dee=ed unlawful en appeal.

Public notice of certification of the propcsed agree =ent was issued en Dece=ber 29, 1976 with respenses due en er before January 12, 1977.

Staff and Sys ta=s filed cc==ents in succort of the propcsed settle =ent.

s Based'en our review of the record in these proceedings,,

including the settle =ent agree =ent itself, we conclude that the settle = ant agree =ent represents a reascnable resolutien

'f the issues in the proceeding-in the public interest.

nie udingly, the settle =ent should be approved.

The Cc==ission finds:

The settle =ent agree =ent certified by the Presiding Judge to the Cc_ mission in this docket shculd be approved and =ade effective, as hereinaf ter ordered.

The Cc=nissicn crders:

p (A)

The settle =ent agreement certified by the Presiding

~

Judge in this docket en Dece=ber 16, 1976, is hereby approved and' =ade effective, and is incorporated herein by, reference.

(B) Within 30 days frc= the date of this order, 'Consu=ers shall file with the Cc==ission revised tariff sheets in con-for=ance with the settle =ent agreement.

(C)

Within 30 days after the settle =ent tariff sheets are accepted for filing, Consumers shall refund amounts 'collec-ted in excess of the settle =ent rates based en service rendered after Septe=ber 20, 1975,- together with si=ple interest ce=puted at 97 per annu=.

-,, - + - -,. - -, - -,.

n,...;..,.., - - -,,

n,.,m-.

m

Docket No. ER76-45 (D)

Within 20 days after refunds have been made, Censumers shall file with the Cc= mission a compliance report showing monthly billing determinants and revenues under prior, present and settlement rates; the monthly settlement rate increase; the monthly rate refund; and the monthly interes t ec=puta tion, together with a summary of such information for the total refund 1

period.

A copy of such report shall also be furnished to each State Co= mission within whose jurisdiction the wholesale custo-j t

mers dis tribute and sell electric energy at retail.

(E)

Consumers shall file with the Cc= mission increases to

. rates resulting frcm application of the tax adjus tment provision of Rate "WR", together with computation showing the basis for the changes in rates, pursuant to appropriate Cc=aissien Regulations.

('

(F)

In the event that filings are made with the Cc==ission as a result of NRC orders arising from the Midland antitrust proceeding (Dccket Nos. 50-329 A and 330A) and tha t the autcma tic termination provisions of such filings are invoked, Consumers shall promp tly notify the CR..aission as to the da te on which the termination provisions of the filing; became effective.

(U)

This order is without prejudice to any findings dr orders which have been made or which will hereaf ter be made by the Cc= mission, and is without prejudice to any clai=s or contentions which may be bade by the Ccemission, its staff, or any party or person affected by this order in any proceedings now pending or hereafter ins tituted by or agains t Consumers or any other person or party.

(

(H)

The Secretary shall cause prompt publication of this order in the Federal Register.

By the Commission.

(SEAL)

Kenneth F. Plumb, Secretary.

m-

,se e-

--,-m-ew r

w v

UNITED STATES OF AMERICA FEDERAL POWER COMMISSION Consumers Power Company

)

Docket No. ER76-45 i

ERRATA NOTICE

- (Farch 31,1977)

ORDER APPROVING SETTLEMENT (Issued March 7, 1977) y Page 2, paragraph (B)

(

On line 1, delete "30" and insert "6 0 ".

Page 2, paragraph (C):

On line 1, delete the first phrase "Within 30 days af ter the settlement tariff sheets are accepted for filing," and insert "At the same ti=c tha t the revised tariff sheets are.

filed in conforcance with the settlement agreement,".

On' line 4, dele te "20" and insert "30".

C Kenneth F. Plumb, Secretary.

P 1

DC-A-24 4

4

=

--r-e

- +

wew

---y

=

,-ww

,v---v,-y,--,

.e

-,wwy-..

,--r-9w

,,w--

y--

.., 4 APPENDIX 3 Settlement Agreement

. UNITED STATES OF AMERICA BEFORE THE FEDERAL POWER COMMISSION

)

In the Matter of

)

)

Docket No. ER76-45 CONSUMERS POWER COMPANY

)

)

SETTLEMENT AGREEMENT The parties hereto agree as follows:

1.

Within thirty days af ter a Commission order ap-proving this agreement becomes final and non-appealable, Con-sumers Power Company will file with the Ccmmission revised rate schedules and rate sheets.

These filings will consist of Whole-sale for Resale Electric Service Contract Rate "WR", appended hereto in Appendix A; revised superseding rate sheets, which amend its existing rates applicable to individual wholesale customer contracts -- appended hereto in Appendix B; a.d a Service Agreement for Wholesale for Resale Service (hereinaf ter

" Standard Service Agreement"), Standard Rules and Regulations Applicable to Wholesale for Resale Electric Service, and other documents relevant to the Rate Schedule -- all appended hereto in Appendix E.

At the same time as these filings are made, Consumers Power shall make refunds in accordance with this settlement agreement, at an interest rate of 9% pe': annum.

Within 20 days thereafter, Consumers Power shall advise the Commission in writing that such refunds have been made.

> - - -, + - - -

,.+----s-

,w,

,,-,a,.-

--~

2-2.

The Rate "WR" contained in Appendix A-1 and the revised superseding rate sheets contained in Appendix B-1 will be effective for the period f rom September 30, 1975, to Decem-ber 31, 1.975.

The Rate "WR" contained in Appendix A-2 and the sheets contained in Appendix B-2 will be effective for the pe-riod f rem January 1,1976, to the third day following the date on which the Federal Power Commission issues an order approving and accepting this settlement agreement.

The Rate "WR" con-tained in Appendix A-3 will be effective on the termination date of Rate "WR" contained in Appendix A-2.

The rate levels contained in Appendixes A-1 and 3-1 are identical to each other, and the rate levels contained in Appendixes A-2 and 3-2 are identical to each other.

The difference between the level of rates found in Appendixes A-1/3-1 and Appendixes A-2/E re-flects changes in Michigan tax laws applicable to Consumers Power which became effective on January 1,1976.

The differ-ence between Appendixes A-1/B-1 and A-2/3-2 compared to Appen-dix A-3 is that Appendixes A-1/3-1 and A-2/3-2 include provi-sion for conjunctive billing of customers taking service at multiple delivery points (and surcharges relating thereto) while Appendix A-3 contains no such provision.

3.

The rates contained in Appendixes A and 3 are based upon cost of service shown in Appendix C.

These rates are designed and apportioned in the manner shown in Appendix 0 hereto.

For the pericd II test year (calendar year 1975),

l

-g

-*m-r-mm e

m w

e

~

vyr'-*

w y

  • m----

'w 1

y ry---m*-+--==e-y

  • '-*r 4-

'7

3.-

the rate schedules set out in Appendix A-3 produce revenues of

$19,238,663, an increase of S4,058,~278 over rates in effect prior to September 30, 1975.

This increase compares with a test year, revenue increase of S5,065,568 which results from the races presently in effect subject to refund.

The rates con-tained in Appendixes A-1/B-1, together with applicable sur-charges, would produce a test year revenue increase o[ S248,353 compared to revenue produced under the rates contained in Ap-pendix A-3, if effective during the entire period II test year; during the three-month period in which these rate schedules will be effective, they produce additional test year revenue of

$66,858.

The rates contained in Appendix A-2/3-2, together with the applicable surcharges, produce a net test year revenue decrease of 517,301 compared to revenue produced under the rates contained in Appendix A-3.

~

4.

Consumers Power agrees to maintain the settlement rates in effect through July 1, 1977; provided, however, as follows:

a.

Consumers Power's agreement to maintain these settlement rates in effect through July 1, 1977, does not apply to taxes, charges, or assessments of any kind I

which the Company is required to put !n effect by law or regulation arising out of the energy shortage; and

, b.

Consumers Power may file super-seding rate schedules with the FPC prior to July 1, 1977, which filing would seek an effective date earlier than such date but would state that, pursuant to this agreement, Consumers Power will not put new rates into effect until af ter that date.

5.

Except as noted below in this paragraph, the provisions of the Company's superseding amended rate sheets filed July 30, 1975, and its SCHEDULE OF RATES GOVERNING NHOLE-SALE FOR RESALE ELECTRIC SERVICE, filed July 30, 1975, are the same as those provided in Appendixes A, B, and E herein.

The changes are as follows:

a.

Changes to the Capacity Charge of the Monthly Rate provisions contained in the superseding rate sheets and the Rate "WR",

as reflected in Appendixes A and B; b.

An addition to the Fuel Cost Ad-justment Charge provision contained in the superseding rate sheets ani the Rate "WR",

to reflect incorporation af Staff Witness Tindall's recommendations concern-ing fuel adjustment charge synchronization; M

4 w

-r

- - - = = -

-v-v-

y___

.* Editorial revision to the Charges, c.

Amendments and Supplements provision of the Service Agreement for Wholesale for Re-sale Electric Service to conform with

' FPC O rder No. 541; d.

Revision to the Tax Adjustment provision of Rate "WR",

reflecting revi-sions previously filed with tha Commis-sion by letter of September 24, 1975; and e.

An addition to the superseding rate sheets and the Rate "WR" to provide for service and billing to multiple delivery points and a surcharge relating thereto, effective only during the refund period, as provided in paragraph 13 of Appendixes A-1 and A-2.

6.

Consumers Power agrees that 1 n::::- Fo rates resulting from application of the tax adjustment provision of Rate "WR" shall be filed with the Commission, pursuant to its Regulations.

7.

In applying the multiple delivery point ad-justment provisions of Appandixes A-1, A-2, B-1, and B-2 to Bay City, Consumers Power agrees that the monthly demands of of the following delivery points shall be combined for bill-ing purposes:

Trumble Street - 26th S treet, Water Street -

Sidney Street, and Henry Street - State Park.

,e l

. 8.

Within fif teen days af ter a Commission order approving this Agreement becomes final and non-appealable, Consumers Power and the Company's wholesale customers which are parties hereto agree to execute a Standard Service Agree-ment in substitution for the existing individual contract forms.

The form of the Standard Service Agreement is appended hereto in Appendix E.

Consumers Power agrees that this substi-tution will not change the rates in effect for that customer at the time of the substitution.

The parties to this Agree-ment agree not to protest, object to, or otherwise challenge in any Federal Power Commission proceeding the filing of such a Standard Service Agre'ement or to the terms of the Agreement or the Standard Rules and Regulations applicable thereto as set out in Appendix E.

Such parties as have heretofore filed protests, objections or other challenges to the Company's Standard Service Agreement in any FPC proceeding (including dockets ER7 6-142, ER7 6-23 5, ER76-257, ER76-3 74, and ER76-522) agree to withdraw same with prejudice within fif teen days af ter a Commission order approving this Agreement becomes final and non-appealable, without prejudice to raising such objections in subsequent proceedings governing future rates.

9.

Within fif teen days af ter a Commission order approving this Agreeme..t becomes final and non-appealable, the municipal and cooperative intervenor parties hereto agree to dismiss with prejudice their appeal of the Commission's

c

.r

.* e order of August 29, 1975, in Cities of Bav City, et al. v.

Federal Power Commission, pending before the United States Court of Appeals for the District of Columbia, Docket No.

75-2077.

10.

Consumers Pcwer is presently a party to anti-trust proceedings at the Nuclear Regulatory Commission with regard to its application to construct Midland Nuclear Units 1 and 2 (NRC Cocket Nos. 50-329A, 330A) (hereafter "Midlanf antitrust proceeding").

Consu=ers Power agrees that it will not ask a court of competent jurisdiction to stay a final order of the Nuclear Regulatory Commission in the Midland antitrust proceeding which imposes license conditions; pro-vided, however, as follows:

a.

Such final order is issued prior to July 1, 1377; b.

In the event that such license conditions require Consumers Power to take action which results in the filing of agreements or other documents at the Federal Power Commission, each party hereto agrees that such filings shall, unless Consumers Power chooses otherwise, contain provisions which (1) automatically terminate the filing and any Ccmpany ob-ligation thereunder on the date such li-cense conditions are held by competent

.. legal authority to be unlawful or other-wise inoperative, and (2) provide that the filing shall not be effective unless the automatic termination provision just described is accepted withou t qualifica-tion by the FPC.

The automatic termina-tion provision of such filings shall pro-vide that Consumers Power Company will promptly advise the Commission and any party affected thereby as to the date on which the termination provisions of the filing became effective; provided, however, that such communication shall not be deemed to be a " change" in rates, charges, classi-fications or service or in any rule, regu-lation or contract relating thereto, as provided in Section 205(d) of the Federal Power Act, and also shall not be deemed to be a "new schedule," as provided in Section 205(e) of the Act; and c.

Nothing contained herein shall limit the right of any party hereto to:

(i) petition for reconsideration of any order of the NRC or any Board thereof; e

/

P y

-ep

- ~

v

9-(ii) pursue an appeal or petition to review before any appellate body it chooses; (iii) seek a stay of any court order which medifies in any respect the final order of the NRC; (iv) seek an expedited appeal at any level; or (v) seek a stay f rom the NRC or any Board thereof of any order of the NRC or any Board thereof.

11.

Consumers Power may withdraw its approval of this Agreement in the event that a final order is issued by the Nuclear Regulatory Co= mission in the Midland antitrust proceeding prior to issuance of the Federal Power Commission's order accepting, without =cdification, this Agreement.

12.

This Agreement is in settlement of each and every issue in this proceeding.

The making of this Agreement shall not be deemed in any respect to constitute an admission by any party that any allegation or contention in these pro-ceedings is true or valid.

No party hereto shall be deemed to have waived, approved, accepted, agreed to or consented to (a) any principle of rate-making, cost of service deter-mination, allocation method, or rate design f ormula, terms and conditions of service or any other principle underlying or supposed to underlie any of the rates provided f or herein or a

. (b) any allegations or defenses relating to actual or poten-tial anticompetitive or discriminatory practices raised in this proceeding.

13.

Each party hereto shall cooperate in securing Commission acceptance of this Agreement without modification.

If the Commission does not accept this Agreement without modi-fication, it is withdrawn and deemed not part of the record in this case.

If the Commission does not accept this Agree-ment without modification, the Agreement is and shall be privileged, and shall not be used, other than as a basis for further settlement discussion in this docket, in any manner, for any purpose, in connection with this docket or any other docket or proceeding or anywhere else.

14 All offers of settlement and discussions relat-ing thereto are and shall. be privileged and shall not be used in any manner, for any purpose, in connection with this docket or any other docket or proceeding or anywhere else.

i

.. p 11 -

3ec.e m bee Executed this /0 day of Mo t b-cr,1976, by and on behalf of the parties listed below.

[-

George A. Avs'ry Keith S. Watson Wald, Harkrader & Ross 1320 Nineteenth Street, N.W.

Washington, D.C.

20036 sel for Consumer rvser m

Company 3

6,, k

..J J.

C Da h Mann, Jr.

i[ %

f Mfrgan, Lewis & Bockius 1800 M Street, N.W.

Washington, D.C.

20036 Counsel for Alpena Power Company

-9 7

g

-L-,

(

j Robert C.

Kline, J*g Attorney at Law 311 Central Savings Bank Building Sault Ste. Marie, Michigan 49783 Counsel f or Edison Sault Electric Company

/

.,f // /.,.

Robert Jablon Spiegel and"McDiarmid 2500 Virginia Avenue, N.W.

Washington, D.C.

20037 i

Counsel for Intervening Cities and Cooperative

p O

O g

J i

APPENDIX A 1

i f

f 3

e 4- -- --

,,.n..-----,.--.__-.

a n

4 '.

ucc,.e. r. 6c..:.4.

s=

A;;endix A-1

-: age, c c e.Y"e.V.t reA.7.:.

n

. J, - 2. e.d..

....v... Tab St.aa w.i ataC,.,,

~a..e m-tw.

L.".

(For Service Fre: Septe=ber 30, 1975 to rece:ber 31,1975)

1..

n a.t.1s.,a_9 4,.

v C, e. '. c a ~-.*.. e s',... -c. e d.,,. e.

s-...,.s ~,

' a'.

.-.s-

..a.'...d-c. e,-. -', -

m

  • a.y,., c

_s a

gw.. ~.,7..,a...,....a. s..g,,e.

s e. ga. - g,gy _, s..

n g.<..a.

s

.s functics, and desiring pr -= / voltage service for resale to the d

genersi public in its service area, where the partial er tctal pcwer recuire=ents of the Cust:=er are er will be purchased fr =

.s..e C _.a..s.

2.

.r...e 4..

..a.~

.. e...

/

Unregulated alternating current, 60 hert, three phase, 2,hCO ::=-

4,1 va, s. -..,...,.a.-. d.-" %....'. ' -.

,..'".a su,,.'/..C.' age d..

each case to be deter =ined by the C pa./.

3.

.M. erd ly Kate Capacity Charge:

$6.CO per %I for the 'irst 2,200 %I cf 3"'d:g De=and

$h.SO per M for the next 7,6CO %i cf 31*:s Ee:and 33 95 per %i for.he nex: Ic,CCO Zi ef 34i=; re=and

$3.hO per Mi fer the next li,CCO ZI cf 3d

  • g re and

$3.10 per %i for all ever 35,CCo Mi cf 3"'*:g recand Ene../ Charge:

1.6Ce per Mih fer all Zih E.

Tuel Cost Ad.'ustment Char e

"."..e.'".e_' c.,s',.a <w' ' us'.=e..'., d e' e 3 - a 8. _--". 's.- '..- ' ' =

.e..-.s. c a-

.w,,,,sa 2

s..c.-ne n3, e

,4 3.,.a..u....

4

.. a c,

...a.....u..

f:r=ula set forth belev, shall be applied to all kilewa :heurs i

s.-,7 *.d dur..e- .a. %. " ' *.g- _c.'.'...

d.

~.

{=c

=h b

' fetal Syste: Efficienev

'i =

X (S

S)

Isti=ated rihclesale Syste Ifficiency s,

c tihere A = Ad,just ent facter in cents per kilevattheur to be a.clied to each kilevattheur supplied under this rate schedule, r

I sn

., t,-. -.i..

a P ;* !! p..n. I 1.,

g

.i

.,, Il.[ if,t j fe..i y, l't

,....a vi en

..,r n.. n c.,, u......

rr

,a

.g 1 1, n

,t.,.- u.i,;-

3, o a.

r, ooo

i

{j

2. p ". ll. l.* 1. t,1; n,
i. g4 g

'a

't i it.

'l "J'"

.t.1M n

J.n..n'llt"gn nau o Ir. <

t.

~1. il p 9 o f.I,1l,e. n 'y, h.5'.

laln: 8 i.n.li Ig.

J,

.o i p 3 l?,.-

  • " *t l.;

i?

3' Irn.. U R

y o

'. g p

n

,n

  • a '?

IS g...

an u

.!io:*3.!;'.;.'1i.l.-

)

S 1

.1 n.ti. n I, 8.il p,gf i,l?.1.1 1

n t,e n-. n p-L.,

.o it. t. : n ra i

l nn.o.,

n.. n,

n l,

't. i p. ll a'll N n. q g..

c:

n.

o 4

I, a "! U " it

>" Y 11 y.

o 4.

.k, it.C, f. 'a.

f t.h.9.,1,..,'.i. a. l!..l.l lt ?.."g

+p.

D:.

p-n l 7

<=,g

. o El n.n,...

n r

/, l'.._. l.

,:, ir g :t it

a a.; 7u n '.;,1 Ar il.,,... P..'.

il e,

i, a

2w 2 / J.l o,l.e! l'.;

3... :, :i. 1:s.I; f.i

.it. It le, L;.:' [:. "

l i

'a

,,.,, r nn o

o.o,

=q

', l'. 3 ff.l :. p>

il 't 6.S,

.!'h,f.,.ua:fb,y lk-

. n.!..o, o.l,, i r.:e. o n ln. I ta u

n fj :; l. n.c. L. n.o i.

i 4

n oI

...o

+ n o. a ll vi q s.

a 1.( n

.t ' " I

,4 n

, f.c gel.

.l} '3

.n q

,, ; ;'l,l.;,,j, l;.. <i

. 3 4!. !! !!.; ;-

S e

og n

o.n L. n p 1, o'- [i,,','

' o.

..'..,, J..,i.1 o

,L a

. i.) g';,

i4 yy n..tg.l'itr,;l; 9

.n a

i ni p. L.

.k a

,,1 a.

.r c.

r a

,,[

s i

.i:*t.*'o'q#at;h tg..p..,

n q ;,r p.

.n.

.,.n.t.y a a,. ~ p' r

a i

o n s 1-

, t... p r.

i it n.3 a.

,,. a

.,. l.I s

,j n e

it':i n -

t.

P I'!

7,3 ji 9 if f r,., ::

n. p 4lC,;

t U 'N ll T

.i

.I !i

.I o 1

.P

,,, P,) :l

l. t o n,

l.' W lr n I, lf ' 8-ln a

I 1,,

u l

7.;..".

j! 1 l1 l 'a 's! Ij l l :.

  • If := !(

p i

I n, it c.,,

I',.,n 11 7

.,, li,

'l }!.h' y!..

  1. ".) it l1t'. }; !.! tl C U a ?..

l'-

)

., I ;i it ei

)J;du,11..!

,o,l1,,7.y

.H..

a i.

. ~.

n.., i. f.s.. s p' y.. p' " l'I.p.I

,a n '3...f..

n.

g n, t.1,a

.n,. a.,. ~ n.

y '

l.:

i o q il.,e n.

4 a n-e n

4 1 '*1 0 i,.

!), I.!."..I i,. f.? M a u.$ <,,\\

- im 11' d,.., ;l 1. '.r; a

n. a p

I..

OP" m

1

" J..i 11 h

,3 il n n.p i

. I',E.n a

!),

i,' o.O.. i ',":

e

,J u !.,~9-F m,

W

,,.t.:.,11 o q,',' i,i.l

,!.,$ L;

.u

,.j it, t if a ; ;* - 'i!

1. n i

1 i

tl, h,. ii r!a, n j.r !! p r't :j 7,. "-

[1

,1 :" It

t
  • 11,. }t i, d.,r a

...u i

. n. :.i

',.., a,. n, i i,t i:

n. :::.n..,",'

t

.,, it

tl.lfi"liifa!,ty.

... t...,

...,,...,. r.

f,,

.. ~

l" inn:<t..,t,i,.s !! II.

IIt {}i-0 ' ""

..., m n

.,I

.,,,.e, n

m-I. j.!

it a..!.:, ll "l1 *l:3., 1,,

P:

.n.';l 8

,, j.

..' :' r.., a.

4 t

, r, i, n 1g

..1..g1..q,.".r a.g

,, r., i,,

yp p...ur,,.:Ip:n

,p, e.p :t p..

p..c s,e e,

u, m :,..,

a.

a:y3,..u,ap;.,ie:n uI

,, 2. :

n 2:i -

t!

n p :j 'y

. s..

i,. 2.g.

.-i*...

If If,n.e.n

. pL

.n T,

' o-

?"

ji,,. c. Il I,' m m

li '

t 1.

i. L'l a

8g*

n i'.

8

,n o-l.-

g' ui

)

I 7

Dockst No. EH7645 Appandix M Pc; < 3 cf 6 WECLESALE FOR ESALE ELEC'TC SERVICE CCNT2ACT PES *dR" (ForServiceFrc=Septe=ber 30, 1975 to Dece:ber 31, ic75) 6.

ML' d -"- Charge The capacity charge included in the rate applied o the capacit/

reservatien in effect. For determi.ing the applicability of this

=ini=u= charge, revenue received frc= the fnel cost adjust =ent' clause shan be excluded.

7.

Delsved Pr, tent Che=re A delayed pay =ent charge of 2% of the total net bin shan 'ce added to any bill which is not paid en er before the due date shcun thereen.

8.

Me:cL u Da-e-d The =a:d-'m demand er rate of use cf electric energ-/ fer.each =enth shan be the greatest average load 1. kilevatts during the thirey-

=inute period folleving the clock hcur er the thirty-=inute peried before the clock hcur of such =enth as registered "cy suitable instra-

=ents instaned by the Cc=pany to =ake such deter =inatien.

9 Billing De=and subject to the provimiens of paragraph 13, the bi7'* g de=and for each

=enth shan be the =axi=u= de=and at each delivery point fer such =enth, provided that the b47 74.g de=and shall in no case be less than SC$ of the actual =axi=u kilevcita= pere (kVA) de=and established during any thirty-=inute period folleving the cicek hcur er any th'n y-=inute pericd before the cicek hcur of such =enth.

Ecwever, in no case shan the bin-ing de=and be less than 6C$ of the =axd.=u= cn-peak de=and created duri.g the preceding 11 =enthsA less than 30% of the =a:d=u= off-peak de=and created during the preced.ing n =cnths, whichever is greater.

For purposes of this provisien the hcurs between 8:C0 M1 and lo:CO FM Monday through -Mday shan constitute the on-peak pericd. The hcurs between 10:00 PM and 8:00 #! Monday thrcush Friday and an hours of Saturday, Sunday, and Eclidays shall be censidered off-peak. The ter:

Ecliday refers to New Year's Day, Ma-arial Day, Independence Day, Labor Day, Thanhcgiving Day and Christmas Day.

l 1

i I

1

~,,.. _. -,,, _ -, _, _..,, _.

. _,-,,-_,......__. ~

3,CC.gd g

J,n g. T ).

.a w

.a t.A4;C n.1 e

y 2

k e#.C

.3g..

w.

t.m.-.e...

e y d

h ;w.

7.' cn :. L w

q

,.,.e,

.. - rw re wC.".'t pL %..:.:nw...%;,.

nn

(""g C.g

7..e.

4 w e**.4'.".*ke ".."O

' C"I s t

  • C

'. ' *.'.....k. C.**,'3_',

.'.g',', )'

y 3.,

9 m.f.

  • A4 A. y. 1"."*..

.#.. h. 4.=. T s....

.a 8"'s 4 3

,6.

...n4.=gg g 4.s.a..a.= 4.= *4.......#

  • b.. c.a. pe -e.

e...

  1. .s.*.=

.. -g g.

J 4 4 E.4. A. k..,

.b. a.

4'.f.* S* w.== e..,.

,3 J

8

. b.a s4914 g.,. 0 4.. A..

.C.... b.

g

.g g.y..,

a. g w a.=.#g ~.

..J. *.*

b. a.

A.

  • e.=.=.4 = a.,A
  • b

+..b.

e *.

.a.=.g. C.#

=~.

...a

.. a

.g.

9,.4

  • s.4..*

/E.. 3 c.

A

  • r 4.* & =.=..b.* = =.

A. ~= 4 =. * %..

%. 4 9

  • 4 = === a =4_ A.

g g..g

... ~..

.~4 g

g g r-s t,., 9 1,. s...,.. 4.

m, g.4 _

.,4 _9

b..

3.. *,4 ? ~ *L.. b

.e

?

.g

.= _

4 _it.b.t

%. e..

. 4

.,..b..

_=./.

e... ~.6.

.#s.... s.

.a

. b. a. s.4**

g.4 4-

.,.4,. A s..,.3.4

.b.

L.,. 4.L.i ~,.

?.

5..4....sL,...

.g g..

w;.

.g

.s t.

.g

  1. .s.

J..

4.

  • b. e %. 4 * * *..e :g 4 A

.ch,i*

..g.

~=

b. a.

.g 1e.33. b.1

. bO.

.b.e a.,3

-e

.sL A..

4.

.b.. s.4??4 w...

..g

_g

.b 4,3

..g 3.b.1 2ea

.b.

1

.. E. 4.

. ~41 *. st 4..,,,84 wb, w

~.

.g 5

s./.b.

g e. s

_4

._b,.

. sv.,.., 3..

.b.

c..

..r3

.s...g. -.

~~ - ~.

.. gw A..

4.

.b s4 _*14.

e 4 A.

-.g og y 1_i.

......4...sd.4..3

. w.-..

  • % g.n..e g -. 4... 43 g,,1_4.A g..

.4.g*,,

..,g,..

w.e....

._6,.

ec,Cr.O...t.3,.b.t C 2.

2.f t t.,..

cs w

.b.

St 4..

a

.s

...~

.. ~....

. b..e 31.

7w,.1., g..

4

..:. J ab.

, e. g CJ e'*4..J..*.9

k. m.

A J.

  1. .=

b.49*

$. g..=.s A.,

yy g 4

4 g eggg

. b.e

.A. m,. A. gA

..e.

_sc..

.g.b y

,A.a..

g y yw g

gg

.e Sa

.4.

a%,

S.r,.

e.w.

s -. S..e.

b "3"..

g g

4. g 4g p mT.4.N g*. g

.4

,i 3 *

,..# h

  • G.
  • b

.g

y..

~ --.

.2 d* C tar.8

=*

,C A.. b..

(*....

=.s cp

==.=..='4J..e s T.* e d.' *b..

g%w.

.w..

b.w.

y..

C

=...e..==..

... 4C g g

g.#

4

.. * ? J a..

3 J.

p a...p.

4..e.

3,g

4. =....

.#. g.T 1 g

.gy

.= y = =....

L

  • b. a g s..*. d. e.,
  • b.e.

e.

g3.* 1

k. e ' *.#_* * *
  • E.

. b..

A

.4.-.

. _bs w.., 2,...g w

e.

%,.,. 4 y

4 A. m A.#*=

  • b.g.#**.*.4.=

..bi.

e.

e.A 4 g

3* w,.#

3..

.. g

... g

%41'4

.A.en.,

A g Q.ug 4 b.e. /*g A a.d_.. 4.

..e.

.A 6,. gb.e.ye. '.

)

w.

T 6

. C. b.5 g C.3.w.

. g.g.

.l

e..#

6..b. _4 _1.gf.43 g g A. s u.gg

... g w

C e 3 *.'...*..'*"V * ".

  • 'g**.*d.y..*..*.'.'g
  • ".a,. * - *'.' '.

4.".G'.'. '. a. '..'..*)". * *. * '.

  • b

.. = =

9 m.4 4 *8e 4.A w., J [ E.# 6..a.*.

  • b..

J

- -- g

    • '"s.A. O. A..
  • 4... -e.*a.

e.4

.. c.

4:';

b A

A

..g w

1. E w..,.J

..b..

. b.

E. C*

.b f a 3

.w e.3..

,,w s..

.... g b.

.w

' ' ~ ~ * * *

  • e "4'** t' ""* *** *
  • uc u. s,. Ec..

,.a. s,g Appendix A-1 Fage 5 cf 6

  • :s.r...en,..=.re=. =. =.n
=.. m.

e

.i

.e

..l C,.:.m. e.,, :n..: u,,.., n

.a w.

(For Serrice Fre= Septe her 30, 1775 te Dece:her 31,1975)

,a.

~

,.s.~,-

.. C.

....a c..a.

(1)

Supp'.y Vehage h6,CCC Volts er less

$. C,.C.,.e.,. *u.r *.r,,.

s..%...c.a. s 1, :s=o

'.f.n*

,~a. o,e.- y.;.e.,-. n....

-e

,,= c, c.s,.

$.lc per Zi fer all cver 5,CCC Zi (2) Supply Vcl. age Cver h6,CCC Ve hs

$.60 per Mi fer the first 5,CCC 24 3. "cC, er '.<.'.i.".-

'.%....a..

' C, CCC

'.<.'.I 3.10 per Zi fer =" cver 15,CCC Zi

.i.1

.. t. 4. 1.-9u e.1 a.,.

O.

4.

n.J. 4.,.,..

  • a

.~.

1.

e..

a.~2s ~... *,. c.h.. s s a.."..a. a....- * '..'. a...' -a. a. da....=,..,,*,,_'..'.s,

. n. u.a, a

se,.,.*s c.' s"-"

"..s.,-a, a s d. =..'_'..= '.. ".. = ara-a '- c h ** "

.e..,., s.'.all S.e c

-S*

a.d. '.'--s.'.s-'.*--.'.'.-*'. s"-e, vd.'. '....'.

..s *..-".

-=

.~

.c

,.,.4 4 e e..,.'.. a...a-n e.'- d.at e._-*..ed '.y '.%.. C ya /3 ec '..h.a. " _' " 3

.f.3 3.

e cal.~' ated and e.d.a.-=.'.'.

.- ' %. c.." '.a d.

d a ' ' ~. =. ~.,,~

3 '...s.

... ~

-su;4. -.. s. e.,,e.

4.ve d.-.es c.' sa..d_.e und.a.- '.'-' s c....*..,a.....e,

... e

  • n

. a-a.

- s..u.e.-. g.s,,,

s.

,a.

. - e.,,

.,a..,., e. r e -.- n.o

~..s.

s r

._a.e. e,c.o d1 c,

.w,.. s.4.n a - a r.e

a..

2 ~~...

Custc=ers F.eceiving Serrice at Cne Delivery ?cir: at k6 27 and abcve

$CO.126/S Cas' ers.r.a.-a.*.".3.c.."... a..v_- ' '.'., i a.

e Deliver / ? cists at k6 kV and abcVe

$CO.132[d

. Large ?r.'=ari Custc=ers Taking Service at Cne Deliver / ?cist

$CO.126/6 E=all Pri=a / Custemers laking Serrice at Cne Deliver / ?cist

$CO.C6/Et I

Fcr the purpcse of this paragraph, the felleving systems C-*"

'- e dee=ed "large pri=a y custe=er=": Charlevcix, Celdwater, "*' edale and Marshall.

~

e

,r-.,-

o y

-....-,+.-------------.-w

-.---m.

-,-r-a r-e-,r-

---mr,--

vy v

D ckst 2lo. IR76 45 Appandix A-1 Page 6 of 6 WHOIISAIS FCR ?25AG EI2CTP2C SERVICE CCIT"RACT RATE "WR"

(?cr Service Fres Septe=ber 30, 1975 to Dece=ber 31,1975)

\\

lb.

Centract A written centract in the fers set forth in ??C Electric Rate Schedule Ifo.1 is required for this service.

v 6Y e

/

f

~.,. - -, - - - -. -..

Dechat Ho, IR76 h5 Appencix A-2 Page 1 of 6 WOESAlZ FOR EISAE II.ZCTRIC SERVICI CCITI'?ACT PATI "'iR" (For Service Rendered Fres January 1,1976 to the Third Cay After the Cate c ;ihich the ??C Issues a: Order Accepti.s The Pre;csed Settle =en: Agreement in ??C Decket ITc EF76 h5) 1.

Availability Cpen to a::7 invester-evned ;cver ce=;a=, rural electric coepera-

/

tive, or municipally-evned electric syste= serving a public utility function, and desiring pri=ary voltage service for resale to the general public in its service area, where the partial or total pcver recuire=ents of the Custccer are er vill be purchased frc=

the Cetpa=y.

2.

Nature of Service Unregulated alte=ating curre=t, 60 hert, three phase, 2,hCo ecc.

inal volts er =cre, the particular naturr. of the su;;17 voltage in each case to be dete=ined by the Cc=;a:/.

3.

Monthly ' ate Capacity Charge:

$5.80 per EJ for the first 2,200 MT of Silling re=ard

$4.65 per ET for the next 7,6Co Mi of 3"'4 g re=and

$3.80 per Et for the next lo,CCo Er er 34'Wg re=and

$3.30 per E7 fer the text 15,cCo Et of 31111:g re=atd

$3.C0 per Ei for all ever 35,cCo ZI cf 34d:g re=acd Iser,/ Charge:

e 1.60p per Eih fer all Eih h.

Fuel Cest Ad.justment Charge The fuel ecst adjustment, detamined =cethly to the nearest c e-thcusandth cf cue =111 per kilevattheur in acccrdance with the femula set forth belev, shall be applied to all kilevattheurs supplied during the bfd:g centh, f#

=\\

A=

  • b l X Total Systen Ifficiency c

S S

Isn:ated '4helesale Systes Ifficiency i

ifhere A = Adjustment facter in cents per kilevattheur to be a:;11ed

,o eac: kilevattheur supplied under this rate schedule.

1 1

i

'~

~' '

' App;ndix A-2 Paga 2 cf 6 WIICESAE FOR RESAIE IIECTRIC SERVICE CONT?ACT ?.CE "'iR" (For Service Eendered Frc= January 1, 1976 cc the Third ray After the Date en Which the F?C Issues an Order Accepting )

The Prc;csed Setele=ent Agree =ent in DC Decket lic ER76-45 k.

Fuel Cest Ad.'us t e=c Charce (cc.d)

F = The ecsts cf fcssil and uclear feel bu: ed in the case (b) and cur e=t (c) perieds shall be a's de#d A

d-Acccu=ts 151 a:d 518 cf the U:1rer= Syste= cf Acccu=ts. Fuel ecsts (F) shan in-clude:

(1) the weighted average delivered ecst of an feel burned at the Cc=pa:y's electric generatics plants, plus (2) the feel ecsts asscciated with energ/ purchased cc a=y basis other than an ecccc=ic dispatch as ec=tained in (3) belev, plus (3) the net en-ergy cost of energ/- purchases exclusive of capacit/ cr de=and charges when such energy is pu=hased c an ecccc=ic dispatch basis, less (k) the ces: of feel recevered threugh i=ter-s/ste=

sales 1:cludi:g the feel costs related to e:e.7/ scid c an ecc-sc=ic dispatch "casis.

S = An '5: sales in the base (b) and the current (c) perieds.

I Such sales shall be:

(1) syste= generatic=, plus (2) purchased

cver, plus (3) inte=hange ;cwer-in, less (k) e ers7 for pe=p-ir.g assceisted with the pu=;ed stcrage cperatic, less (5) 1=-

terchange ;cwer-cut, and less (6) syste= lesses.

r

'b p = 3ase feel ecst cf 1.5157# per '<evatthecr

- o To synchreti::e the cost incurrence and the b4 77 8:g adjust _ent under this paragraph, bd'* g under this paragraph win be based pre'd-d -

arily en the bil'4 centh's aales =ultiplied by the adjust =ent as dete ined abcVe frc= the second preceding =ceth. This billing vin be subsecuently cor ected by the dollar a=cust ever or under ccHected fic= the actual feel cost adjustment for the bil" g =ceth.

Such correction will be =ade to the secced bi"' g =cuth fencving the pre 1 *- d ary bd 17 d "g.

Tax Adjustment 34 m shall be increased withis che '* dts of political subdi-visic=s which levy special taxes, excise taxes, ince=e taxes, license fees or rentals against the Cc=pa y's electric ;= pert /,

i er its electric c;eratices, er the ;=ductic: and/orsalecf i

electric energy, to ef' set such special charges and thereby pre-ve c ether custc=ers frc= being ec=pelled to share such local increases. Sills shan also be increased te offset a=y =ev er increased specific tax cr excise i=pesed by a=y gever== ental au-thorit/ upc the Cc=pa=7's generatice er sale cf electric energy.

-- ~

' uccKS: Oc. n.<(t A A:pe-d3r A-2

.Paga 3 of 6

- O.tr. ear..:..mR c.r.e r..

_r,.e u..s.,

nc m

SERVICE CCN"' FACT FATE "WE" (Fcr Service Rendered Frc= January 1, 1976 to the hird Cay After the Cate c= *ihich the 7FC Issues an Order Accepting The Prc;csed Settle =ent Agree =ent in FFC Occhet :*c IE76 k5) 6.

M* '-- Char:e The capacity char e 1: luded in the rate a ;"ad to the ca

..,. > e.e.,

a...a s..u.e, u

,ua u s..,.

p acit2 S

,.. s e.,.a a.,.. <, e.u,,...

.s

.s c> ua.s

-d ~ charge, reve=e received fr= the fuel ces; addus. e=0 clause shan be ex-'-ded.

7.

Delayed Fa'r e.t char:e A delayed pa/=ent charge of 2% cf the tetal set bin sh=" be added te a=y bi" which is ::: paid c er befers the due date shev: thereen.

8.

y, + - co-,->

The -=+~ de=and er rate of use of electric energy for each==th shan be the greatest average lead in Vevatts dring the thir:/-

3 ute peried felleving the clock h = cr the thirty -* ute peried before the cicek h ur of such =csth as registered b suitable instr -

/

=ents ins =" ed by the C=pany tc =ake such dete atics.

9 a# " #

De=a.d Subjec: to the provisicas cf ?aragraph 13, the bi'3 g da-=-d fer each

sth shall be the = e'.:= de=and at each delivery ;cist fer such== th, provided that the b'"'

g da-=-' shall 1:== case be less than EC% of the actual -a*:= kilevelta.:;ere (k'tA) de=and established dring any thirty

  • -ute peried fell wi=g the eleck h ur er any thirty -' ute peried before the eleck hour of such =enth.- E vever, in== case sha n the bill-ing de=and be less th 60% cf the =axi== c. peal. d-=-d created dring the preceding 11 :: ths er less than 3C5 cf the =axi== cff-peak da-*-d created dring the preceding n ::::hs, ir.1:hever is greater.

For pur;cses of this previsies the h =s between 8:C0 #1 and 10:00 FM Mc= day thr ugh Friday shall ec:stitu:e the c=-peak peri:d. The hc=s between 10:C0 E{ and 8:CO AM Mc= day threugh Friday and all h =s cf Sat = day, Sunday, and Eclidays sha be ccusidered off-peak. Tre te=

Ecliday refers te New Year's Day, Fe=crial Day, Independence Day, laber Day, Tha-Wgivi=g Day and Chrims Day.

1

-c

,a n

,,,+ - -

,,.,-n.-~~,

-..wr a

.-.w--

v- -. -

---w,

-,.-n c--

,,m_

g Os a-5

" * " * ~

Decket ITc. IR76-45 Appe= dix A-2 Page 4 cf 6 tie 0ESAE FCR RISAE EIZCTRIC SERVICE COIiTPACT PATI ";iR" (For Service Rendered Frc= Jccuary 1,1976 to the Third Day After the Eate c tihich the F;C Issues a: Order Accepting The Proposed Settle =ent Agree =ent in FIC Ecchet fic IR76 h5)

10. Ad.*ust=ent for ?cuer Tac cr This rate requires a deteminatics of the average pcVer facter

=aintained by the Cus:c=er dring the billing peried.

Such average ;cver factor vin be dete=ined thrcugh =stering of lagging kilevarheurs and kilevatthc=s during the bining pericd.

The calculated ratic cf lagging kilevarheurs c kilevattheurs vill then be cerverted to the average pcver fac cr for the bin-ing pericd by using the apprgriate ccaversics fac;cr.

The average pcver facter dring the bi"* g pericd shall not be less than.8CO.

If the average ;cver facter duri:g the ti"dng

=c th is less than.800, the capacity charge vill be 1: creased by the ratic that.8CO bears to the Custc=er's average ;cuer facter duri g the billing peried.

11. Metering Ad.just=en:

7cere service is supplied at a sc=inal voltage of =cre than 25,CCO volts, the Ce=pany =ay elect to =casure the service at the supply voltage in which case 27, vill be deduc ed, fcr bi n -

ing purposes, frc= the de=and and energy =casure=ents thus =ade.

12. Transfc=er Cveership Tcere service is supplied at a ecuinal voltage of =cre tha:

25,CCO velts and the Custc=er prevides all of the necessa:f tra:sfer= leg, cc trc7'4 g 1 d protective equi;=ect fer all of the serrice, there shan be deducted frc= the capacity charge herei provided for, the felleving ecsthly credit per k'4 cf bi1'* g de-a-d (after the 2% deduction referred to above).

For these Custe=ers where part of their lead is served through i

Custc=er-cvned equi;=ent, the credit shall be based c the

-avd us integrated de=and(after the 2% deducticn referred to above) created duri:g the===th through such Cus:c=er-cw:ed equip =ent.

-+y

.--,.3,

,,v-...11.-.., -,,.-

y.,..,,.-. -.,.,..

v, m

v.4-,

..n, i,v.,

y.

y

.,,-.....,,..v

-,..r.,--

..v._-y.

Decket No. ER76-45 Appendix A-2 Page 5 of 6 WECIESAlZ FCR RISATI E1EC"'RIC SERVICE CC?i~?ACT PATZ "WR" (for Sertice Eendered Frc= January 1,1976 to the "tird ray After the rate en Which the F?C Issues an Order Accepting The ? reposed Settle =en Agree =ent in ??C Decket Ito Ea75-45)

12. Transfe~r=er C cershi: (centd)

(1) Supply Voltage M,0C0 Volts er less

$.60 per Zi fer the first 1,5CO W S.25 per W fer the nex: 3,5CO W

$.10 per W fcr all ever 5,CCO MT (2) Supply Veltage Over M,CCC Velts

$.60 per W fer the first 5,CCO W a

$.20 per W fer the nex 10,CCO kW

$.10 per W fer an ever 15,CCO W 13 Multiole Deliver / Point Ad.just=ent When a custe=er takes service at =cre than three deliver / points, the bi'14:s de= ands cf such custc=er, as defined in Paragraph C hereof, shan be ce=bined through arith =etical su=s, withcut regard to coincidence, in a ca-er deter =ined by the Cc=pany, so that bins vd11 he calculated and rendered for the cc_bined deliver / points.

During the effective dates of service under this centract rate, the fencving surcharge shan be applied to a =axi.=== cf the fir:t 2,200 W of =cathly b4 d ng de=and :

Custc=ers Receiving Service at Cne Deliver / Peint at M K7 and abcVe

$CO.126/%i Custc=ers Receiving Service at Multiple Delivery Points at M kV and above

$CO.132/Zf large Pri=ar/ Custccers Tahing Service at One Delivery ?cint

$CO.M6/W S=an Primary Custc=ers Taking Service at Cne Deliver / Foint

$CO.C6/Mi For the purpose of this paragraph, the fc11cving syste=s shtl1 be dee=ed "large pri=ar/ custc=ers": Charlevoix, Celdwater, Eillsdale and Marshall.

~

~ ~ ~ - -

D:cket IT3. IT/6-k5 App ndix A-2 Pago 6 of 6

'ECIISALI 703 RISAIZ IIICTRIC SIEVICE CO:iT?ACT PAS "WR" (For Serdee Rendered fres January 1,1976 to the Third Cay After the rate en %"nich the m Issues an Order Accepting The Pre;csed Settle =ent Agree =ent in ??C Occket :*o Ia76 h5) 1!+. Centr act A written centract in the fe = set forth in IPC Electric Este Schedule Ito.1 is required for this serdce.

0

Decket No. 2576 h5 A;;;: dix A-3 Page 1 of 5

'ECIESALE FOR RESALE IIICTRIC SI.T/ ICE CCliI?ACT PATE "*E"

' (For Service Eendered C: and After the Third Eay After the rate On Which the ??C Issues an Order Accepting the Prc csed Settlemen:Agreementin??CEceketIicIa76-h5) 1.

Availability Ope: to any irrester-cwned ;cver cc= par /, r ral electric cecpera-tive, or ra:icipally-cwned electric s/ste= serting a public utilit/

fccctics, and desiring pri=ar/ voltage sertice fer. resale to the general public in its sertice area, where the partial er tetal pcwer require =e=cs of the Custccer are er vd" be purchr. sed frem the Cc= par /.

2.

Nature of Serrice Unregulated alternating current, 60 hert=, three phase, 2,kCO =cs-inal velts or core, the particular esture of the supply voltage is each case to be dete=1:ed by the Cc= par./.

3.

Mc=ch17 Eate Capacity Cha:ge:

$5.80 per 21 for the first 2,200 ET cf 317'*:g re=and

$4.65 per Ei for the nex: 7,cCO El cf 31111:g re=and

$3.80 per Et fer the next 10,CCO Et cf 317'<:s Ee:and

$3.30 per ET fer the next 15,CCO El cf 3177'ng Ee:and

$3.00 per ET fer all ever 35,000 Zi of 34d:g re=acd Iner,/ Charge:

e 1.60p per Mih for all MTh 4

Fuel Cest Ad.justment Charge The feel ecst adjust =e::, dete =ined centhly to the nearest c e-thcusandth cf c=e =ill per kilcwat heur is acecrdance with the fc=ula set fc:th belev, shall be applied to all kilevattheurs supplied during the bill f g =cnth.

f ~r r

c

  • b Total Systen Ifficiency A =-
  • ( Esti=ated Wholesale Sys es Ifficiency S

S.

(c c

'4here A = Adjust =ent factor in cents per kilevattheur to be applied to each kile.rattheur supplied under this mte schedule.

P

_me..

Eceket No. IR'76 k3

-a.

ts g..C 6.,

y 6 Faga 2 of 5

'ridOESAE FCR RISAE IECTRIC SERVICl* CCIT FACT FN"I "*aR" (For Service Eendered. Cn and After the Third ray After the Cate c Which the ??C Issues an Order Accepting the Pre;csed Settle en: Agree =ent in TFC Decket I'c I.TT6 45) k.

Iuel C:s Addus =e= Cha=e (cc=d)

F = The ec=s cf fascil and =:: lear fuel bu=ed in the base (b) and curre= (c) peri:ds shall be a's defined is Ac:cu=s 151 and 518 cf the U:1f:= Syste= cf Acceti:ts. Fuel cest: (F) shall in-clude:

(1) the weighted average delivered cer: cf =' fuel bu=ed a'. tLe C~~,a,'s ah.'..d-.. -...

.d--

-, "-..'.a,

' " s ( 2 )

'."..e.^ '

r

a-cests assceis.ted with ene. s punhased c: a=7 : asis ether than an ecc===i: dispatch as ce= sired in (3) belev, plus (3) the : : e:-

e.u ces: cf ene.w pur:hases es: hsive cf capacit/ cr de=asd charges when such e: era-is pu=h sed c an ecc::=ic dispatch basis, less (k) the ces: ef fuel nccvered thrcush i=er-r/ste=

sa,.s.

.3..aa-,. as....e, c sta.

a

,1.,.

.,.... _as. so-2

-m

1: dis;atch 'casis.

S = All b'c sales is the base (b) and the cur e=t (c) peri:ds.

Such sales s: " be:

(1) systa= generatics, plus (2) purchased

cver, phs (3) i..te=ha
ge ;cwer-i=, less (h) ete.g for pu=p-irs asscciated with the pu= ped stcrage cpersti:, less (5) in-ta =ha:ge ;cwer-cut and less (6) syste= lesses.

s T

b p = 3ase fcel ces: cf 1.515'7p ;er V'%st heur a

To synchrenice the ecst incurence and the billing adjustment under this paragraph, bd "* g u. der this paragraph will be based pr-t'-'s-arily c the bd"* g =ceth's sales =ltiplied by the adjut=ent as dete---d aed above frc= the secend preceding===th.

This billing v'"

be subsequently corrected by the dellar a='::t ever er c der eclie:ted frc= the actual fcel cost adjustment for the billing = th.

Such cen ection vd1' be =ade to the second b'"'.g renth felleving the prel 4-'na.~/ billing.

5.

Tax Ad.justment av,.

n a-

,.,.e

.s,g.,a.a a.. r._u. v aa. ~ = - v. a,.,,.. s" 3.

visic:s which levy special taxes, ex:ise taxes, inec=e ta::es, license fees or rentals against the C =;a=7's electric pre;erty, or its electric cperatic:c, cr the ;= ductie: and/cr sale cf c h a'-' - e:e.a, to cf;.' set such special charges a:d thenby pre-ve= cther cus =ers fr== being c.,elled te share such 1:ca'.

i=resses.

3*"

shall also be in:ressei to cffset a:-/ tev cr inc=ssed specific ta= c ex ire i=pesed b/ a=/ g:ver==e=:a1 au-therity upc the C = par./'s generstic: cr sale cf electric ene.d.

~...

-.' ' ~~

Appendix A-3 Pase 3 cf 5 WECLESAIZ 5tR HISAG IIICTRIC SERVICE CCIITEACT FATI "L*R" (For Service Re=dered C and After the Third Cay After the rate en '# ich the FIC Issues an Order Accepting the Prepcsed Settlement Agree =ent in ??C Decket !ic I.TT6 h5) 6.

!& d -- Char e The capacity charge included in the rate applied te the capacitf rese ratics is effect. For deter-d-d g the applicability cf this 4

-d d --

charge, revenue received frc= the f e1 ecst adjus

=-t clause sh*" be excluded.

f 7.

Delayed Pay est C. arre A delayed pagsent charge cf 25 cf the Octal ne: bd shall be edded te any 'ed which is cet paid c cr before the due date shev: thereca.

8.

x=u-- De=azd The -avd- - de=r:d er rate of use cf electric energy fer each===th shan be the greates; average lead is kil::.ratts during the thircy-

-d ute peried felleving the eleck hcur er the thiny-cinuce pericd befcre the cicek hcur of such =c th as registered by suitable instra-

=ents installed by the Cc=pa=y to =ake such dete-d atic=,

9 3d " d -e De=acd The bd"d g de=acd for each =c=th shall be the -a d--

de=and at each delivery pein for such =c th, previded that the bdd g de=acd sha

1: =c case be less than 50% cf the actual =ard- - kilovelta= pere (kVA) da-a~* established during any thirc/-=inute pericd felle,ri s the elech hcur or a=y thirty-mi=ute peried bercre the elech Ecur cf such =c=th.

Ecvever, in r.c case sha" the bd"d g de=acd be less tha: cC$ ef the

=ayd -- cc-peak de=c d created duri g the preceding 11===:hs er less tha 3C% of the =ay'-"

cff-peak da-a-d created during the preceding 11 =ceths, whichever is greater.

For pu7cses cf this previsic: the hcurs be:veen 8:00 K4 and 10:00 24 Menday thrcush Friday shall cc:stitute the c:-peak period. The hcurs between 10:C0 24 and 8:C0 AM Menday thrcugh Friday and all hcurs of Saturday, Sunday, and Eclidays shall be censidered eff-peak. The ter=

Ecliday refers to Tev ' fear's Day, l.fa~rrial Day, Independence Day, Labcr Day, Tha=ksgiving Day and Chrisc=as Day.

t

,. -.~,-

,~,,

.., - - ~.,,,

-.=--------.n.--

.,,,a y

.,.,,., - - - - -,..,,, ~.

-n

Dceket No. FR76-45 Appsedix A-3 Fage 4 cf 5 i

,n 2 W..e.A L C,

e.a.

..r.:.s,,a.3. C c.:..

u SIH7 ICE CC:iTFACT FATI "W" (For Service F.endered C= and After the Third ray After the Date en '4hich the I?C Issues an Order Accep*ing 'he Pr pesed Settlement Agree =ent in ??C Decket Irc Iri6-k5)

, o. a _.4,.. s.. e

.e 4

".-' s.-' '. ~ ~.*.*.~..*. a d=... # a.d.. c '. " =-

av=..- %.,c.e. '.a.

.-~.

s.

_g$.g$,a y./ su. cas...- 2 a...,- ~s.. utna,- e a.g.

.eg s.

u

.n a.ve.~*.-=, cve.

."a-...- vd ' '=.d.=..._*-=.d

~,.t.'.~=..=.~d.- c.'

?a a

943 Ta u.,.. s a.a 1.,.4.i cva..s.,.. s a..

4,.

.u.. u.4._13 4

.,.. 4 a.

g e -.e --

g

  • = ca.i-~'s.ed.-.'c

ge'.3 V.'.'.. ar'.~. ~. s... V d '

a...".. ~ ~ s a

-a

.p..i.i 6 6..

%. s..-.....gA-..-'=.=.e.

g*.=m.-s -o., -y e =

a..b.e. %. 4 ' '.

-g

.t.s :g a-g %.,. 3.a,-..u..,

n

,,. ~,.-a, r. g en.

g2--

.ag.

a

-s =

A..s.ver.,g. -. e.

.*a n..~.~ d~ ~. '..g- =..'~ =. ' n " e, e ~ ' ~. d s.'.* M ~..~. ' e 3 ss s.a

.C'C0.

.l.." ' =. av5. = g-=. s a e.. a -...- d - d.e '. ' = * * " '..e-

~. ~ ' ~

  • s ' =ss ' a.

=

. CO,..".= c o,ac' ~.~s cha. = -' ' *. e.*..~. = s e *.

by the ra:ic that.cCO bears tc the C=s:c=er's average ;cver e., n..

..a

.u.e y a n o e-

,.-a g.

.n

...g 11.

'.t.e:"i== Ad.j" s..'..e.*.

/

,c,..~. se..s..

t

. s 1,,, s.; z., c s..1.,. y,.,,.a.~.,..> -.... _s.<.

u 25,CCO vel s, the Cc=pany =a's elect t: =easure the service at u s., s=pp.,. ve, ~,.a.-,. a -., a c=se.2,,.p,, ue e.s.

. a,.

sa,,.

s a

< _.,,, eses,

.o.,

.s., ge-,

a-gr s.

. ~..., _.,sgr. ~.....s.,. _,ae.

~

,o.

..,. s.s.... c. ~....s...a..,

.u

  • ihere service is. supplied s: a =c=inal voltage cf _cre than 25,CCO velts and the Cus:c=er prevides al2. cf the necessarf

.~~~.s.'~.*..,,c..~~~..~~M*~-

  • .^,.~ ~ e.,. '.~. e e ~,.~ ',~ e...'~.~ z '.. c.*

the service, chere shall be dedccted frc= the capacit7 charge u

._ya a.a

.o.~,

' e.'- '

~f-

~-..'.'.,7 c ~' '.,- *.~ '.2 c.'

(after the Ey,'deductic referred te above).

e.

y c

. f b'

g d=-e->

Icr these C sec=ers where part of their lead is served threcgh Custc=er-evned equip =e=t, the credit shall be based c= the

.4 a,

e

.a..

.,4.(a. e

.s.... ~c;, d.a t.-.a

.,..,a.

,,.4..

.e..e.-

above) created d=ri:s the===th through such Cuscc=er-evned equip =e=t.

f

_._,,m.

_~ _ _ _. _ _ _ _ _,,,,,,,.

Decket ITc. IR76 k3 1

Appadix A-3 i

Page 5 of 5

  • E0ESALI FOR EISAI2 IIICTRIC SERVICI CC?r: PACT ?ATI "'.i?."

(Fer Service Renderd Cn and After the Third ray After the rate en Which the ??C Issues an Order Accepting the Prepesed Settic=ent Agreenent in FFC Decket $c IK76-45)

12. Trs sfemer C-T.e shi: (centd)

(1) Supply Vcitz.;;e M,CCO Volts er 7ess 4.60 per Zi fer the first 1,5CO Zi

$,25 per Ei fer the next 3,5CO ET

$.10 per Zi fer all ever 5,CCO ET (2)

Supply Voltage Cver M,CCO Volts

$.60 per Zi fer the first 5,CCO Mi

$.20 par Mi fer the ne=: 10,CCC Mi

$.10 er Mi fer *" cver 15,CCO Zi

13. Cen:rze:

A citten centrac. '- -"

'er= set fer-h in ??C Ilectric Za.te Schedule :ic.1 is required for this service.

1

T AP?EiDIX 3

l

^ '

City of Bey City l

Appendix B-1 Peg 2 1 of 4 CFA:nIs :.22.CTr/I w_ fn 3 30,1975 TO CC:c?ACT FOR IIIC-RIC SI??/ICI DATE II3EUARY 13,1967 2 r4II:7 CCITCEES PCIER CC:GA:Tl KD S~

CI."? 0F BAY CITI (DISE:IATE CCIISCEES PC'4IR CC GATI PATI.

SCFEUII FIC 270.1), AS Ah wD 3Y ORDER CF S2 ICI?AL PCTER CC:CESSICN D ECC.:.,x HO. I-7803 IATID AUGUST 30,197k A:iD MADI

.:::.CTr/I JU:II 7,1973, A:D 37 PEICR A'!I:CE:CS 1.

vcere used i= these changes, the ter= "cus:c=er" shall be dee=ed c be interchangeable with the te:= " City."

2.

1: Section 6 cf the Cen:rset, the parsgraphs headed " Capacity Charge,"

"Inergy Charge," "_mel Cest Agust=ent Charge," "Mi=i=u= Charge,"

" relayed Psy=ent Charge," "Ce:er. inatica cf 31111:; re _and," and " Tax Clause," are deleted and the fclhving nev paragrs;h: are substituted i= their place:

c.

en _;. :

The en::c=er a.rees to pay for such electric energy delivered to it he--

-d =--

d-ac~ ~de---

eith the foll:ving rate te vit:

Menthly Eate:

Capaci:/ Charge:

$6.C0 per Ef for the first 2,2C0 M7 cf 3*"' g E*-*-d k.80 per El fer the = ext 7,8CO Mi cf 3dd g De=and 3.95 per er fer the next 10,CCO E7 cf 34<

re=a d 3.h0 per EI for the = ext 15,CCO ti of 31111 g re=and 3.10 per ti f:: all over 35,CCO ti of sin '

re=aci Iserg7 Charge:

1.60c per % n f:r all Mih 7:el Cest Addust=ent Charge The fuel cest acus:=ent, deter ~' ed===:hl-/ to the nearest cue-thecsandth of cae =ill per 'dlevattheur in accordance eith the fer=cla set forth belev, shall be applied Oc all ki hwattheurs supplied duri=g the t' I :sth:

e c

'e

't Tetsi Syste: Efficierer g, S.

g S.

Is:_:sted !itclesale Syste: Ifficiet:-/

c c

.w

-.m

-m r

9

-#-9 9w.--w-y 97-y-.-

,w-7

City of Bey City Appendix B-1 Pags 2 of 4

?:el Ccst Adjust =ent Charge (Centi =ued) 1

'#cere A = Adjust =ene facter in cents per kilevattheur te be applied te each kilevattheur supplied under this rate schetle.

? = "'he ecsts of fessil and nuclear feel bu=ed h the base (b) a:d cu ne=

(c) perieds shall be as d #d ad da Acccunts 151 and 513 cf the U:ifc= S/sta= cf Acccu=cs.

? el ccsts (?) shall (1) the weighted average delivered cos: cf all feel ine'ade:

bu=ed at the Cc=;any's electric generating pla ts, plus (2) the f el ecscs asscciated with energy purchased c= any basis other than an ecccc=ic dispatch as cc=:ad-=>

(3) belev, plus d-(3) the net energy ces: cf energy ;urchases e=clusive of capacitI er d - -d e'-' ses when such energy is perchased c= a= ecccc=ic dispatch basis, less (k) the ecst cf feel recovered thrcugh inter-systa= sales ine'-'d g the feel ces:s related te ene.s/ scid c an eccur dc dispatch basis.

S = All 'S sales in the base (b) a:d the cure : (c (1) systa= gsseratics, plus (2)) perieds.

Such sales shall be:

cver, plus (3) inter 5 ge ;cver-i=, less (4) energy;crchased fer y= ping asscciated with the y= ped stcrage c;eratics, less (5) intercha ge i
cver-cut, and less (6) syste= lesses.

p

-.D.

2ase fuel cest of 1.5157p per 'ed' wattheur

=

S b

Oc s7:chrc= ice the ecst 1 cure =ce and the b4"* g addust=ent under.

this paragrsph, bd"d r under this paragraph vd" be based pre'd-d -

ardly c the bd"' g =cuth's sales =ultiplied by the adjust =ent as dete - d ed abcVe frc= the secced precedi=g = cath.

"'his bd " d g vd "

be subsecuently ccrrected by the dcM*~ a=cust ever er =>a-~ " acted frc= the actual f e1 cest adjus =ent fer the bd"d g = cath.

Such 1

cerectic: vd " he =ade tc the second bd"d g =cach fc11cvi=g the pr-id-d-* 7 bi213 r.

.Vd-*

= C' arge :

The capacitf charg=

d--'"'a' d-the rate applied tc the capaciti reservatics i: effect. For deter d-d r the applicabd'dt/ cf this

-d d -

charge revenue received f.w the fael cest adjust =e t clause shall be excluded.

Delayed Pa'/=ent Charge:

f A delafed pay =ent e5

  • ge cf 2$ ef the total net bd" sb="_ be added te a:7 bd" which is =ct paid c: c befers the due date sheva thereen.

4 1

i

. - ~ -

- - - + - - - - - - - - * - ~

~ ~ ~ " - ^ ~ ~

~ '-

'^

Dockst No. ER76-45 City of Bay City Appendix B-1 Page 3 of 4 Tax Ad.just=est

- a n,

,1.. n u a

s

- e _- -.s 3 e y.a.1. a.

u..s..,,a -a u. - c.>,c., a s.a., s u.a -

c.-

vist=s W.ich le',f special taxes, excise taxes, i=c=e ta:ces, 16e:se fees er rentals against the Cc=psey's electric pre;er:f, er its electric c;eraticus, er the pred : tic: a:d/crsaleof electric energy, to effset such special charges and thereby pre-vent c:her cust=ers fr= being c-.,e"-d to share such icesi kcreases. 3d " e sh1 2 also be 1: creased to cffse: s=y ze:r er increased specific tan er excise i=pesed by say sevec._.e tal antheritf upc the Cc:= any's generati= cr sale.cf electric energy. -

rete. d-*tica cf Ed' d--

re=and i

Subject te the previsicas of the Multiple relive:f ;cist Adjust-

ent belev, the bd "d r da-a-d for each ::::h shan be the =ani=

d -*-d at each deliverf pei t for such== h, provided that the bd " d g d--=-d sha" d-c case be less :'e-EC5cftheactual

- s.:= >d t~rcits=pers (%7A) h-a-d established dring a 7 thir:7-

-d =e peried foneving the cicek h::ur er a=7 thirty d =e peried I

bercre the cicek h::ur cf such centh. Eevever, 1 no case sha n the i ;

bd"d--d-.--A be less th*- 6C4, cf the ~*

d-

- c -teak de=acd created dr ing the precedd r E =cuths er less than 30% of the

-*--d.:= cff-peak d-*-i created dri=g 'the precedd r 11 =cuths, W.ichever is greater.

Ier pur;cses of this previsic the hc== be ree: 8:C0 AM and 10:C0 31 Menday thrcugh Triisf shan ec stit=e the en-;eak peried.

Se hcurs between 10:C0 m and 8:00 AM Mc: day thrcugh tiday and *"

hecs of Sated.sy, S= day, and Eclidays shall be c=sidered eft-peak. The te:= Ec2.iday refers to Hey Year's ray, Me=crial ray, Icdependence Day, Iaber ray, Pa* giving ray and C'..rist=ss ray.

The fo ueving nev parag aphs are added te Sectic 6 felleving the parsg: sph entitled "Addust=en: for ;cwer Facter;"

Meterir-Ad.duse ent:

icere service is supplied at a

-d-** voltage cf =cre ths: 25,CCO velts, the C wys:7 =sy elect to =eas=e the sertice at the supplf veltye in hich case 2% v'" be deducted, fer bd"d r ;= poses, fr= the d-a-d and energy =essee=ents thus =ade.

Trs sfc=er Cwnershit:

'Icere serrice is supplied. at a :--d-al voltage of =cre than 25,CCO volts and the cust=er provides *" cf the necessa / transfer-d r, centre " d-- and =. ctactive ectir est fer an cf the service > there sha" be deducted frc= the espacity charge hered: previded fer, the fcucyd:g==thly credit per k:1 of bd"d r d----d (after the 2%

ded.cticsreferedtoabcve). Fcr those cust=ers where pa-: cf-

,,,,,-,-w 7-y.r -m

-,,,-,,y.-- - -,

,-,,n r,--,--,y,,

,,-nn----,,

- ~

~

Drckst No. ER76-45 4

City of Bay City App 3ndix 3-1 Page 4 of 4 their lead is se-red thrcush custe=ar-cwned ere.1;=ent, the credit shall be based c the -

--d.:= integrated da->-d (after the 25 ded a.*.*

.d'

.. A. '.o a5 cva. ) cre.=.'e d d"-'...- "ome....'S..'..,."%.". su.".

castc=er-cwr.ed etc1;=ent.

(1) Sc;;4 Voltage M,CCO Vcits er ?ess

$.t.o.e v.4.c

  • u.

.,_, =CO..a'

.25 per MT fer the next 3,5CO Mi

.10 per Mi fcr = M cver.5,CCO Mi a

.u.-

4,.

e,4.te s :, 4 u.sd. e,,,.

.. a -

In acy = cath in #ich this paragrs;h is effective, te: the custc=er takes sertice at =cre than three delivery points, the bd"'

g da-e-ds cf such custc=er (as da'd-~A the Eete:--d atics cf 3d"d g ta-a-d d-a c.te ) ss.., n e c_w4

,a.,.u_ g..

.,,.4..u 4_,,,

w

~

,.,,._.u t._..g_. a to ced:cidence, in a -=- er date.-'-ad by the Cc=;2:7, se that b'" e v'" he c*'~ '*:ed a:d rendered for three ec=bi ed delivery peints.

  • ad's tbd e paragraph is effective, a su.rcharge of $CO.132/h'4 shall n

be applied to a -*--d-~

ef the first 2,200 Zi cf =csthly b'"d Se= _d.

This paragrs;h shall be effective c=17 fer the ti=q peried fre=

Septe=ber 30, 17f5 to the third day after the date c= st.ich the 770 issues as crder accepting the preposed Sett a en: 1.g ee=es; i: I;C i

Ecchet No..M 6 h5 1

l 1

~'

- ~~

~ ~

Uccks: No. ER/6-45

,e V111rg3 of Cholssa App ndix B-1 Page 1 of 4 CIIA!!GES : ::CTIVE SEPII:GER 30, 1975 TO CC !IFACT FCR EIZCTRIC SERVICE EATED SEFrI:2EER 17,1955 SIT.lEIII C0!!SU ERS PCNER CCFSA:Tl A::D T:G VILIAGE OF CIGIEEA (CESIGI'ATID CO !S'02RS FOWER CCGAUT? FATE

~

SCISLUIZ FN I!O. 9), AS AIG:;0ED BY OEDIR OF T*G FIDEPAL 77,2R CCGi!SSIC: III DCCIGT !!O. I-7603 IATID AUGUST 30,197h AIG luCE EFIICTI7E JU:2 7,1973, AIID 3Y PRICR A!E:C:E!CS 1.

iTnere used in these changes, the ter= "custener" shall be dee=ed to be interchangeable with the te= " Village."

2.

In Section 6 of tna C=trset, the ;argraphs headed "Ca;ncity Charge,"

" Energy Charge," " Fuel C st Ad* :: nent Char 2," "Minb= Charxe."

":elayed Tay=en: Charge," " rete =instim cf 31111:q 2e=and," and "Ta::

Clause," are deleted and the foll: wing nev paragraphs are substituted in their place:

c'.

=\\._.

The cust:=er cgrees to pay for such electric energ r delivered to it here= der in cceerdance with the foll: wing rs:e, to vit:

Menthl:t Este:

Capacity Charge:

$6.00 per kit for the fir:t 2,200 k:1 ef 3*'*.ng De=and l+.80 per kN for the ne=: 7,600 k:1 cf 3111:. g De=and 3.95 per k,7 for the ne::: 10,CCO k't of 3"".g te= sad 3.40 per k:t f:r the ne.r.15,cCO ka cf Billing re=and 3.10 per kw for an orer 35,CCO kw of sin *.g te=and EnerEy Charge:

1.604 per k:in for all h:ic Fuel Cest Adjust =ent Charse The fuel cost adjust =ent, determined =enthly to the nearest ene-theusandth of ene =ill per kilestattheur in ac:crdance with the fcz::ula :et forth belev, chall be a;; lied to all kilevattheurs supplied during the billing==tn:

r e

'b Total Syste= Efficiency A=e

-X i

j S.

S.

Esti=ated Wholesale :5yste= Ifficiency 0

0 y-y

+-,e--

-.e,..-

--3

~

~

usex3c no. r.c e-43 l-Villege of Chsissa Appsndix B-1 Page 2 of 4

? el Ces: Adjusten: Charre (C :tf=ned)

Where A = A4ust=ent fae:cr in cents per kihvattheur to be applied to each kilevattheur su;;11ed u-d-- - d

  • rate schedule.

F = The cests cf fossil and nuclear feel burned is the base (b) a=d current (c) perieds shall be as defined in Acccu=:s 151 a d 518 cf the Unifer= Syste= cf Acc u.:s.

? el c:sts (?) shall f clude: (1) the weighted average delivered ces: cf a" ^ '

bur:ed at the C:=;any's electric generati.g plants, plus (2) the fuel costs asscelated with energ-/ pa: chased c= any basis c:her than a= ecc :=1: dispatch as centad-ad (3) bel:v, plus (3) tha te: ene./ cost of energy yarchases ex: wive cf capacitf cr d -*-d charges when such energy is parchased c c= ecenc=ic dispatch basis, less (h) the cest cf feel recevered thrcugh inter-syste= sales includ' r the fuel ces:s related to enerr/ scli en an ece md-dispatch basis.

S = All 'Sc sales.d.r the base (b) and the c= rent (c) perieds.

Such sales shall be: (1) systa= generatics, plus (2) purchased,

cver, pl
s (3) i=ter ' se ;cuer-in, less (4) e e./ fer F-ed asseciated with t'a ~ ~. ~ d stcraze c.:eratie:, less (5) intere"*-ee

~

cver-cut, and less (c) syste= 1
sses.

.v

-.b 3ase' feel cest of 1.5157p per m vatthe:.

=

S b

Oc synch:::ize the cost incurre=ce a:d the bd"' g a4us:=ent u=de r this parag aph, bd'd 5 c der this paragraph v be based pr=-

arily en the bd"d g =c=:h's sales =altiplied by the acus:=est as deter-d ed above fr== the secc=d preceding ::sth. This bd "' g v'"

be subsequent 2y corrected by the do"=r a: cunt ever er u=dercellected frc= the actual feel ecst a4ust=e=t for the bd"* r :sth.

Such ccrrectica v'" be =ade to the secced b'"'

=en.h folleving the pre-d -a ry b'" d 5 Md-d =: Char:e:

T.'.e capacitf charOe included in the rate applied to the espacity reservatics in effect. Fcr deter-d-4 r the applicability cf this d-d--

charge reverne received frc= the f el cost a4ust=ent clause shall be ex:' ded.

i telayed Pay :e=t Charge:

A delayed pay =en: #-

ge cf 2% cf the tctal net bd" shall be added to a=y bd " which is =ct paid cc cr before the due date sheva therec=.

I 1

9 i

~

~~~

Dsckne No. ER76-45 _

i Villege of Chcissa Appandix B-1 Page 3 of 4 Ta c Ad.just=ent 3d " e s'-a" be increased withd-the 'd-dts of ;clitical subdi-visicus which levy special axes, e=ise :utes, Ece=e taxes, license fees er rentals against the Ccpany's electric pre;er:f, oritselectricc;eratices,erthepred:ticsand/crsaleof electrh ene.ef, c effset such sper.ial charges and thereby pre-vest other custc=ers frc= *:eing c=;ened to share such heal increases.

3d"- sha n also be inercased to effset a=y new cr increased specific ta= cr excise.=pesed b/ any gover== ental d

authority upc the C=:p a=y's generatics er sale cf electric e=ergy.

rete.-d atics of 34"d-e te=and Subjcet to the previsicus of the Multiple relivery ;cist Adjust-

=ent bekv, the b'"d 5 d--+-d for each== th shan be the -

-d--

d-*-d at each delivery ;cist for such=== h, provided that the bd " d g da-'-d shall in ne case be less t'=

cC$ of the ac;-

~*-d u= *ediovcits=pers (h'7A) d-a-d estab2dshed during a=y,.hir:/-

-d ute peried fc Ecvi:g the c1cch Ecur er a=y thirty d ute peried before the elech heur cf such =cuth.

Ecuever, in se case shan the b4"d r d-*"

be less than 6C% of the -

rd--- cc-;eak de= d created d=d:g the precedi:s E =cuths er less -he "Cf of the

=a:"" ___ off-;eak d-*-_d created during the preceding n==:ths, whichever is greater.

Ier ;ur;cses of this previsic: the hccrs bet:,ee: 6:C0.01 and 10:C0

M Mc= day thrcugh Friday shall ecustitute the c=-;eak peried. The hcurs betweer.10
00 P.i a=d 8:00 AM Mc day through priday and an hccrs of Saturday, Su=:iay, a:i Eclida*/s shan be cc=sidered eff-peek. The ta= Ec2.iday efers to New Year's ray, Me=crial Day, I:depende::e ray, labor Day, P=-Wgivd:g Day and Christ =as Lay.

The foll:ving nev paragraphs are added to Sectic: 6 fcH:ving the parag aph entitled "Ad'us =ect fer ;cwer Iacter "

Meterd=r Ad. inst =ent:

Where sertice is supplied at a :--d-=' voltage cf==re tha 25,CCO volts, the Cc=:a=y =ay elect to =easure the serrice at the suppl,-

voltage in which case 2$ vd" be deducted, for bd"d g pu:peses, f.m the dea-d at:1 energ = essure =ents thus =ade.

f Transfc=er Cvnershi3:

%cere service is supplied at a cr--d-al voltage of =cre than 25,CCO velts and the custc=er provides an cf the necessarf transfe:- d 3, cc:tro"* g and protective eenip._e t f r an of the serrice, there

@=" be ded ::te:1 fr= the capacitf charge herei previ: led fer, the fcHeving===thly credit per kh of b4"d r de--d (after the 2%

deductic: refe red c above). Icr those cus:c=ers where part cf 1

I

~

~

~

~

Villega of Chalsaa App:ndix 5-1 Pega 4 of 4 s,s.._<

, ga a_s s e, a su _...- --e c..s.~_.

.c.,.

.a e.,...a

...,.u.. c.aa.

s s a.,., ue *ase4. c **=...d_.

..e gr* '.e d d=_. - >. ( a ^. e.-.5.=.

- d, c,

g.a. ~.a.

...e.

c:.._ -,

. e..a ~.c ay e.. ) cr=. =.t e. ' '~~~' - '.'.=..~...'.. ". - ~.~e-*.-~.~.*.

.-e.c.

e.

4.,_.

u..

a

.s-(1) Et:pp27 '/citage M,CCO ~cits a less j

g.s.o e <gg c, uu.

.s.a s~ _,,eco.g;

~.

..a5

,.,.,e

.i.r.o*.o,.

u....

2,,,:Ce.s

  • .,.r,s-

~

n

.10 :er h'i fcr all ever 5 > CCO ' i d

s. l~. <,,.., a., -. -.., a_.

.s-.a,.. a. +

.a

...a

-a A.,.

s...4....rou. u.333,,

,w 13 e.<.,

4..e,. a.....s..-.e....-.

-.w..

'.1h. s

.c e r.* c =. a'. ~ ~ ~. = '.'..1~

'.'~- ~=. =. d=..' ' ~. =..~t,w * -. s 3 ="= '., * ' ' ' ~ e~ t = ~ - _ '.s

,4 si..u. c.a.

(.3.

g.J.J.a=.

4 J

'.~be

? e=.e J s.d..- c.# %J114

.*, p e J.

.a a cve) s

.,1,

%.e

%J...A,

+ 6

.k. a.,.J. a.s _... a _,,

w w

.c.-,

,,.4=w,._,.ea a u.a c 4

_4a.....,

4 a - e -~ =..- '.=.e.-- d =-_ >_ -f.- C

.*. ~,,

e-

~

u e c o ' ~ ' ' ' ~ e ' * ~ ' ~ = ~.'.=.= =. ^.*.~ '.'~- ~ = =. c -~*.' = ', d =.' *.. e.~s'

,~ *...

.,,.a,,

  • P4'= this parag sph is ef'ec :ive, a s,:: charge cf $co.C6/47 shall u,e aff ae

. a

..a - c.a rs. e.o_r..,.. 4, s.,0.,ra. c _...s.,.,,, a,, a a

.w s

d=-=-d.

m

.a a.s,1:s. u

-,,, u

,- s -.e e.s.en.._...

e, - o us..--.,, a -. e:_a n.g...,--

m.c e

.e.ep.t"

e..:,o,.,.c,f5.C ie *s.4.2_ da~, a#.e ~ " = da'.e c~.-"' s,. '.*-e.w..

4asues 2 c a g.

u.J

- A.h,

.t>

Cse#

C

*~*"*

-*e'..--n.~.'-*.**""-

~

..y e..

..y e

D e che...e..:,;u, 6 -?..Q.

.u I

e

,i%-

-ewy,-.

r

--e

s D:ckat No. ER76-45 City of Harbor Springs Appendix 3-1 Page 1 of 4 CEA iGET E:::.CTI75 SEFIEGER 30, 1975 To CCICPACT KR IIECTRIC SERVICE TATD SE? EGER 22, 1965 EE:"JEET CCNSGERS PC*ER CC:GA rf AIID THE C1."f 0F EAP30R S?RELS (DESIGNATED CONSil:ERS PCNER CC:GAITI PA"C SCHI UI2 IK : 0. 5), AS REIDED 3Y CECIR OF EE FED.7?AL PCWER COM:ESSIO:t II ICCEET NO. E-7803 DATED AUGUST 30, 1974 AMD MADE :.:::.CTIVE JUNE 7, 1973, aid 3Y PRIOR R E C:C ES 1.

'#cere used i= these changes, the ter= "custe=er" shall be dee=ed to be i=terchangeable with the ter= " City."

2.

In Sectie: 6 ef the Cc= tract, the paregraphs headed " Capacity Charge,"

" Energy Charge," "Fcel Ccs: A4ust=ent Charge," "y* ' ve: Charge,"

" Delayed Psy en: Charge," " Deter =instic: cf 31 r Ce=and," a=8 " ' " "

Clause," are deleted and the folleving nev paragraphs are substituted i= their place:

6.

. TAW __..

The custc=er agrees te pay for such electric energy delivered to it hereunder i= accordance with the follevi=g rate, te vit:

Mc=thIy Eate:

Capacity Charge:

$6.00 per kW for the first 2,2C0 kW of 311'* g De=and k.60 per kW fer the ne.t 7,8Co W cf 31* r De=a d 3 95 per kw for the next lo,CCo kW of 2*"

  • g re=azd 3.2 per kw fer the me.w 15,CCo kW et 31d s re=and 3.10 per kw fer an ever 35,CCo kw of 344 re=a:d Energy Charge:

1.60p per kWh for all kWh Fuel Ccst A4tstment C'.arze The fuel ecst a4ust=ent, deter i=ed =c=thli to the sesrest c=e-theusandth of c e =111 per kilevattheur is acccrdance with the fo==:la set forth belev, shall be applied to all kilevattheurs supplied during the bd77d g =c th:

i r

e

'e "o

Tetal Syste Efficiency A = S.,

.I S.

Est:.:sted Whclesale Systa= Efficiency 0

l Docket No. ER76-45 City of Harbor Springs j

Appendix B-1 1

Page 2 of 4 I

Feel Ces: Adjus =ent Chsrge (Cc=:inued) 7cere A = A4ust=ent fac:cr in cents per kihvattheur to be applied te each kilevattheur su;;11ed under this rate se' ad-'-

F = The costs of fessil and cuclear fcel bu ed. 1: the base (b) and current (c) perdeds shall be as defined i: Acccusts 151 and 518 cf the t::ifer= Systa= cf Acc:ents.

Peel ces:s (?) shall i=clude: (1) the weighted. average delivered ces: cf a" ^ '

burned. at the Cc=pany's electric ge: erat 1=g plants, phs (2) the Pcel c:sts asscciated # th energy purchased c any basis other than an ec::c=ic dispatch as centad-ad (3) belev, clus da (3) the est energy cost of energy rechases exclusive of capacity er d - -d charges when such energy is ycrchased c an ecenc=ic dispatch basis, less (4) the cost cf fcel recovered th=cugh inter-syste= sales including the fcel cests related to energy sold c=

an ecenc=ic dispatch basis.

S = A1.1 MT: sales in the base (b) a.d the cur est (c) pericd.s.

Such sales shall be: (1) syste= generatics, plus (2)

= chased pcver, plus (3) 1 :ercha=ge rever-in, less (4) energy;for r=;ing asscciated with the p.. ped s:crage c;eratics, less (5) intercha=ge

cver-cut, and less (6) systa= lesses.

.v b

-.l.

= 3ase fuel ccst of 1.5157p per d' vattheur S

b Tc synch:

d e the ecst i=currence and the bd"d g adjust =ent under this parag aph, bd"d ? under this parsgraph vd" h e b a.= ed pra' d-d arily c= the bd"d ? =c th's sales --'tiplied by the adjust =ent as dete. d ed abcVe fr.= the secc d precedi=g =c=th.

This bd " d ? # "

he subsecuently corrected by the del.lar a= cunt ever er unda-'*ated fr ~ the actual fcel cost addust=ent fer the bd"' g===:h.

Such 3

correctics v " be =ade tc the secced b'"d g = cath fclievi=g the p;,, 4 =,r b d " ' 5 M4-d = Char:;e :

The capacity char 6e included is the rate applied to the capacitJ reservatics i= effect. For dete.-4-d g the applicabd'dty cf this

-dd--

charge reve=ce received frc= the fcel ecst adjust =ent clause shal' be excluded.

i relayed Ps/=ent Charge:

A delzyed paj=ent #-* ge of Eg cf the total ne: bd" shall be. added d

to any bd" isich is =ct paid c er befere the d:e date shev: therec=.

Doekst No. ER76-45 City of Harbor Springs Appsndix B-1 Page 3 of 4 Ta= Ad.tast=ent 3d"

  • shan be i=reased withi= the 'd-dts of ;clitical subdi-visic s which levy special ta:es, e=cise taxes, d----- ta:ces,

license fees er rentals against the Cc=;a /,'s electric pre;er:7, cr its electric c;eratic:s, er the ;;cductie: and/cr sale of electric energy, to effset such special charges and thereby pre-vent cther cust=ers f c= be g ce=pelled to share such heal d

increases.

3*"e shan also be increased to effse: a:7 new c; increased specific ta= cr e=cise i ;csed by a=y geve== ental authcrit/ upc the C=:;ary'n generati= cr sale cf electric energy.

rete. d-* tics cf 3d"d-- Ce and sud4e.+ *.e *.u.

-.f13_4 s c.' t'a.

.M"__' '. _' _ ' a a

e / >d *..,_ w'A'" ',-

o

=ent b ehv, the bd " d ? da-*-d for e = "- -- -" v-= " '-* the

-=-d

=

de=atd ac each deliver / pett for such = cath, previisd,. hat the

'ed"d g da-*-d shan 1: =c case be less t' =- SC$ of the act- ='

-a d== M' vcita= pere (k7A) da-=-d establis'ae d"-ing a=7 thir:y-

-d =te pericd fellcwing the cicek Ecur er any thirt./-ci:ute peried before the ch ek Ecur cf such =c=th.

cuever, b== case shall the bd"d r da-=-d be less t'-=~ 6C$ ef the -*-d---

cc-;eak de-=-d created d= hg the precedd E =cuths er less than 3C$ of the

~= H--- off-peak d-*-d created duri s the preceding E =caths,

whichever is greater.

cr pu
7cses of this provisica the hc= s betwee: 8:C0 2.I and 10:CO Pd Mc= day thrcugh Frida/ s'*" ce=stitute the c=-seak peried. The hcurs betwee 10:00 21 and 8:C0 Mf Menday thrc=gh Friday a=d an hcurs of Satrisy, 5"-day, asi Ecliieys shan be ec=sidered eff-peak. The ta= Ecliday refers to Hey Year's Day, Me==ial ray, Indepe=dence ray, Iaber ray, ?a=ksgiving ray and Chris as ray.

The fc11cvi:g nev pars. graphs are added to Sectie: 6 folkving the paragraph e= titled "A4 s:=ent fer ;cver Fac:cr:"

Meterin: Ad. dust =ent:

htere serrice is s=;;2fied at a :-d-*' voltage of =cre t'=- 25,CCO velts, the Cc=pany =ay elect to =eas=e the sertice at the s=;;17 vcltage in which case 2% v4" be deducted, for bd"d r pur;cses, frc= the d-a-d and energy =eas=e=ents thus ade.

Trs sfer=er Cunershit:

htere sertice is supplied at a =e-d-=' vcltage of =cre than 25,CCO velts and the cust=er prevides au cf the necessar/ transfer-d 3, centro"' r and protective eqci;=ti.:t for *" cf the sertice, there shall be deducted frc= the capacity charge herei: previded fer, the fcD.rdg =c=:h17 credi per kW cf b'"d r da-=-d (after the 2%

ded:::ics referred to abcve). Fcr those cus =ers where par: cf v.

rw

-..,e,---r,..--

,.-ac

.---.=v.----,,v.--,e--..

arw-.


,e

,,,---e--,-w

,.-.v.

-,%v--+-r----em.-----,.

te,e.

en-r c--

~ ~~

Docks: No. ER75-45 City of F. arbor Springs App:ndix 3-1 Page 4 of 4

. s.. a -,

a a,

n-a e.-.,..s. +.-.

. c's~=..'<*...=.'.=.'....*...,~.'.=c-=.'.'..

~. -

...~

\\

s

-s _.,, s. e z s e A c.. ~' = -= ~ *... e --'.e ' &= ~ '.' i, z <..e. ~.'..= c *,a s.

ge.s.. u.s...-.o....s..., g:cy.) e:..e4 2-a.

~e

...r.- +1._..

.~.

custc=ar-es=st ec.t'.=e:.

(L) En ;Lf 'le Mage h6,CCG 7c hs er T.ess 4.t.o.,e gs.,...-. **..

1_,,C0 *.'i

.,, s0.,..'

.a 5 a e.,.. a,.a..~....

.n

.10 38: Mi "c: aLL cie: 5,CCO El

..... a,.., a r.,.

a....,..s.a,...

-a ~

a /

e.t 4

. a a., h a.b J 3..e.g e

J J

e..J.,.

  • J,,..b._ *b.

C'.* S *.* ~.

~

a.

2.c

-a s.a.r S.a.e. a... -. -..-. o.u, ---.u..

2.12

e. s 2.

a_-..

.u. u.t.9a.

2,-,-;3

,s o

~.. -. ~.

..as

~

C. S*.'.""3'.-*..'*

( Ea-

  1. "*. ' * '. e. a.'""** *".'.. # ~. c..# ':: # ' ' # "" '.',"

Es.CYe' S,11.-.e C s.4-.4,

  • s. w u

s E.,.a u.w. 4.. ?

)

s*

,.. w..

.g, a

g a

a-.

a., q 4-e.42.--.,

4.

2 o

g -, _.

w..g.

A =.. *3 ".*f "..=.. (. ~: 2. ~q, a-

". ' =,. 1 8 M =-

.ast % e c.,1.,v. t 6,,s 2

.s.

._.s.. A.e.

.h w_4.,a s.1 a.*e,., 4.

.~.

y

...a,..

s.u a..,

%. 2.S e.e.ae,.aIe, L y u,

.aa eeno.e.C/.,;

A n.

-a y c s.

.e c 9 u.,

- s.

. ~~..

%.e gi 74.A

  • g g.=, --J - = c.J 'M

.J_J.e. 7,3"4CQ *e'.s*c.... biq* %3T14.==,

d

~

?"*-6.

o s2.

pa,g

% s.u,9n u.e e.on..a t.

.n.. *.

au.~..4-._..,..

2..d. o..,

~

.e.ep.2*.%.e

,,,0, ' W, s:

.,.'.a. "d.'

'*f a.ar ". d'*.e

.'.d,..' "= ':

r.',

s.

Lssues s= c.-'e. s ~~2.'.'-- ' ' - * =.~ ~, c s e'.c ~.. ' = - =. A.:=. _=_..*.

~~.ur',

e

~.

    • -**QC.
    • C r.tr..

.".C.

.. g.

.v t

,.-,.-r.-

+

Dockot No. ER76-45 City of Potoskcy Appandix 3-1 Page 1 of 4 CFKiGIS : ::.cTriz SI?II:eIR 30, 1975 To Cc:rr?ACT ICa IIICTaIC Szav:cz DATID A?RIL 11, 1975 Sh J CC:iSU:E?S PCSIR CC GA rt A:m THE CITY OF ?ITCSKEY (DESIG:!ATID CO iSU:EES ?OWER FATI SCF M F?C :io. ho) 1.

Where used in these changes, the ter= "custc=er" shall be dee=ed to be interchangeable with the ter: " City."

2.

I: Section 6 of the C tract, the paragraphs headed "Capacit'/- Charge,"

" Energy Charge," ".Nel C:st Addust=ent Charge," " Mini== Charge,"

" relayed Fay =en: Charge," " rete:=inatics of 31d r Ee:and," and " Tax Clause," are deleted and the folleving nev paragrsphs are substituted i= their place:

6.

Pr:I:

The custc=er agrees to pay for such electric energy delivered to it hereunder in accordance with tha followi g rate, to wit:

Menthly Eate:,

Capacity Charge:

$6.00 per '47 for the first 2,200 '47 of Billing re=and 4.60 per 'dT fer the next 7,8Co kf cf 317'd r De=a d 3 95 per k's ter the next 10,CCo k t of 3di'd g re=and 3.40 per 'df for the nex: 15,CCo k:1 of sii'd :s re=and 310 per k:1 for all over 35,CCo k's of 3477* r re=aci Iner57 Charge:

1.60p per k:in for all 'di:

i Fuel Ccst Adjust =ent Chars;e

  • he fuel ces; adjust =ent, deter d ed===thly to the nearest cue-theusandth of c e =111 per kilevatthetr in accordance with the for=nla set forth belew, shall be applied to all kilowattheurs supplied duri=g the bdd g = cath:

F F'o Total Syste= Ifficiency c

A=S S.

Esti=sted Whclesale Syste= Efficiency X

3 g

ws-e ---

--w-e--

-e

=w.

e

-e--

r-y w.et-r----------r-*---


+e

~e--=r-'

a-m-

p-w

+ =-

=v

City of Potesksy Appandix 3-1 Pag: 2 of 4 Ital C st Ad'us:=ent Charge (C= inted)

'v'cere A = Ad'ust=e : fac:cr in cents per kihuattheur to be applied to each kd'.tattheur supplied under this rate schedule.

,,.n.e

,.,s.s c., e. sa.4,_a2

..,3.a

.e3. w..

.a 4.

s.e.ase (u, u

and c= rent (c) perieds shall be as defined in Acc:=:s 151 and 513 cf the Unifc= 37sta= cf A:::u :.

? e1 ces:s (?) shall inchde: (1) the veighted average delivered ces: cf a" ^ ?

bu=ed at the C:=;a y's electric generating ;12 :s, plus (2) the fuel costs. ass:ciated with energ yarchased c= any basis c her than an ece==ic dispatch as cc=:a'ned i= (3) belev, phs (3)thene: energy cest cf energy yarchases e :hsive cf capacitf cr da-=~d charges when such energy is ye hased c: c ec==ic d.ispatch basis, less (k) the c st cf feel recovered th ugh inter-sis e a,.s o

,..aa

_.u.

.a_

-.. c... _,.e

. e.

s a. c-

... es an ec==ic dispatch basis.

S = All 'S: sales i= the base (b) and the c=re:: (c) peri =ds.

Such sales shall be: (1) syste= generati:, phs (2) prehased

,c:,e,

,..s (a-)

4_

e_.w._.

,c.... 4, _.ss (g) e e..s

_4_

.. r y_

ass:ciated with the 7.'.= ped s:crage cperatic, less (3) interchange

cver cut, and less,(c) syste= hsses.

.v D

3ase feel ecst of 1.515~p per > vatth:=

=

S b

Te synchr=1:e the cast in =rence a d the bd'# g a4' us*=:ent t= der this parsgraph, b'."._dg t der, this ;ars raph v'".be based pr="-3 e

a _,.7 c:.u b4 n 4

-,.ue s s.,3 s 4_,.u 4 u....u.

aa.,4,t,.s

.. as s

dete-- d ed abcve fre= the sec=d preceding==:h.

"_'.".is b 3 " # r v' "

he subsequently cerrected by the d T'*r a==unt ever er t der: llected

,. :=.6. e a

.., a.,. c s a,.,4,t.s ~._.

..,r

.. s e n e. _ _c.i.,

.e..

w cc...c.,...r#n u.e _,de.c.u.

ec.--

,a n 4 _

aw

.u..n._._

u-4.

.yana-,.

..a

?*== Charre:

The capacity charge included in the rate applied to the capacitf rese~vatien in etfect. ?c: dete.~'

  • 3 the ap;11:1b* U ty cf this

~ ' ' - - ' charge reve=ne received f = the fiel cest addust=ent chuse sha.ll be ex:'" dad.

telayed. Fa*/=e=t Charge:

9 A dehfed pa'/=ent charge cf 21, cf the total net bd" shall be added to any b'" '# ich is cet paid c: cr bef re the due date shev: therec=.

,w

,e

nty cr l'etaskey Appsndix B-1 Pegn 3 of 4 Tax A M ust=ent I

3d " = sha.E be increased with h the -dts of eclitical sfedi-i visicas Aich ler/ special ta es, e=cise ta es, hc=a ta es, license fees er rentals against the C=;any's electric pre;erty, critselectricc;eraticas,ertheproducticsand/crsaleof electric ene ef, Oc offset such special charges asi thereby pre-vent other cus =ers frc= being ec. pelled te share such Iccal increases. 3d"s shan aisc be hereased to effset any ev er heressed specific ta= cr excise i=;csed by any gover= ental authorit/ upc the Ccepacy's generatics er sale cf electric energy.

reter 3 atics of 3d"d r re=and Subject to the previsic s of the It.:ltiple tellver/ peint Adjust-

=ent belev, the bd"d g de=acd for each =c:th shall be the -*-4-'c da-a-d at each deliver / point fer such==th, previded that the bd " d g da-a-d sha" d-c case be less than cC5 of the actual

- - * = '*-relta=;ers (k7A) da-*~d established d=1:g a:-/ thirc/-

d ute pericd felleving the elcek hcur er any thir:/

d uce peried before the elech hcur of such =c=th.

Ecuever, i: ne case sha n the bd"d g da-a-d be less than 6C5 ef the

---d

= cc-peak de=and created dur_:g the preced.ing E =c ths or less than 3Cf cf the d

-** = cff-peak de=and created tri.g the preceding E =cuths,-

v & % ver is greater.

For pur;cses cf this previsic: the hc=s bet:ree: 8:00.01 and 10:00

M Mc day thr=gh Friday s'-*" censtitute the en-;esk pericd. The hcurs betwee= 10
C0 31 a:d 8:00 Mi Mc day thrcugh Fridzy and an hcurs cf Sat = day, S= day, a d. Eclihys shan be c=sidered eff-peak. The te::: Eclihy refers.tc Itew Year's ray, Me=crial tay, Independence Day, Iaber Day, Tha-Wgiving Day and Christ =as ray.

The felleving nev paragraphs are added to Secti= 6 fellevd.cg the 4

paragraph entitled "Ad.'ust=ent fer ?cver Facter:

Metering Addust=ent:

'4here seriice is supplied at a :

d--' voltage of =cre than 25,CCO volts, the Cc=pa=y =sy elect te =easure the sertice at the s:;pl-/

voltage in which case 2% v'" be deheted, for bd"d r ;ur;cses, frc= the da-a-d and energy =nes=e=ents thus =ade.

Transfc:=er Cmership:

'Where serrice is supplied at a sc-d-C voltage of =cre tha: 25,CCO volts and the cust=er prevides au cf the necessar/ tra:sfer d r, cc=:rcUd g a:d prctective eeni;=ent fer an cf the se: rice, there shan be deducted frc= the capacit/ charge herein previded fer, the fencving r-thly credit per kit of bd"d g da-a-d (after the 2%

deductics referred to above). Fc: those cust= ers *inere par: cf y

-,.w,

,g.,_,

,,,w.,

y.

..,n.

Dseko: No. ER76-45

' ~ ~

City of Poteskcy App ndix 3-1 Page 4 of 4 their 1:ad is serted threugh custc=er-c ed etc.1;=ent, the credit shall be based c tha -a d -~

htegrated d-- ~i (after the 2%

ded : tics referred to abcve) created during the== th threngh se:h custe=er-e T.ed etc.1;=ent.

(1) supply Voltage M,CCO 7elts er ess

$.60 per Mi fer the firs 1,500 Mi

.25 per 21 fcr the zex 3,5CC 21

.10 per Zi for all cver 5,Cco zi It:lti:le reliverf Peint Ad.just=ent In any ::sth in Pich this parnrsph is effective, ee: the custc=er tahes serrice at = re than three deliver / ; ints, the b4d r d=---is cf such cus c=er (as defined in the rete:-" atien cf 3dd r Oa-'-1 abcve) shall be c =bined, thr:ngh arith =e:ieal s==s, v_: hen: regard to ceincide= e, in a -*- er dete. ' ed by the Cc=pany, s= that bd"-

W " he c*'~ 'sted a:'

---da--A

'-- three c =hined deliver / pcists.

    1. d's this par: graph is effective, a surcharge cf $CO.C6/El shall he applied to a -'-".== cf the first 2,200 Ei of===:hly bd"d g da-=-d.

This parsg sph shall be effective c=.17 fer the td=e perded fr =

septe=ber 30, 1975 to the third day a~.e: the date c= e ich the isc issues a crder accepti=g the. W esed Settle =e=t Ag.3e=est in.?C recie: :*o. I376 h5

- - ~.,

- ' ~ * -

D:ckot Ns. ER76-45 Scuth0ccccen Michinn Rural Electric Cooperatives, Inc.

Appendix B-1 Page 1 of 4 CFANGES Eccr.CTrE SEPTC:3ER 30,1975 TO COIITFACT FOR IIZCTRIC SERVICE DATED l'AY 21, 1967 BET:iEF.:( CO:SC 2ES PC ER CC:GA!Tl AlfD SCUTIEASTERII MICIIIGul EUPAL ELECTRIC CCCPETATTE, E C.

(DESIG:!ATtD CO SCZES PC' DER CCaMrf FA*E SCIEDUIZ FPC If0.12),.iS AI2: DED BY OEDER OF TIG IIDEFAL PCWER CCmISSICIT ET DCCIET I:0. E-7803 DATED AUCCST 30, 1974 FID FALE IFFECTIVE JUIE 7,1973, A::D DY FRicR A!2::D:.E:frS t

l In Se:tien 6 of the Centract, the pars 6:aphs headed " Capacity Charge,"

"Znergy Charge," " Fuel Ccs: Adjust =ent Charge," "::ini=un Charge,"

" Delayed Pay =en: Charge," "reter=inatica of Eilling te and," and "Ta::

Clause," are deleted and the folleving new paragraphs are subs:ituted in their place:

6.

FX"E:

The custe=er a6:ees to pay for such electric energy delivered to it hereunder in accerdance with the fell:ving rate, to wit:

Menthlt Rate:

Capacity Charge:

$6.00 per kit for the firs; 2,200 k:7 of 31e g Da-e.d k 60 per kW fer the next 7,8CO k:1 ef 31111ng De=and 3.95 per kW fer the next 10,CCO k:7 of 31111=g re=and 3.ho per kW fer the nex: 15,CCO kW of 31713 g Demand 3.10 per kW for all over 35,0C0 kW of 31111ng te=and Energy Charge:

1.60d per kWh for all kin Fuel Cest Adjust =ent Charze The fuel cost adjust =ent, dete:.dned =enthl',- to the nearest ene-theusandth of one =111 per kilevattheur in accordance with the for=ula set fer:h belev, shall be applied to all kilevattheurs supplied during the bi'1' g =enth:

1 F

F e

b Tetal Syste: Efficiener A=S S

Is inste Wholesale Syste= Efficiency X

3 b

9 e

,-7 y

e a m

~

Dsckat No. ER76-45 Scuchsescar Michigen Rural Elcetric Cooparativss, Inc.

Appendix 3-1 Page 2 of 4

? el Cost A 4 ust=ent Charge (Conti:ned)

'atere A = Ad'ust=ent fae:cr in cents per kihvatth:= to be a;;1ied to each kd' vatth = supplied under this rate schedule.

? = The c:sts of fossil and nuclear feel bu=ed in the base (b) and c= rent (c) peri ds shall be as defined 6 Acc:unts 151 a i 513 cf the U ife= Sys:e= cf Ace:un:s.

?:el costs (F) shall inchde: (1) the weighted average delivered c st of a" ^ '

burned at ne C =pany's electric generati=g plants, phs (2) the fuel costs associated with energy ;= chased c any basis other than c -e::::=ic dispatch as centai=ed in (3) belev, phs (3)thene: enc 4/ ces: cf energy 7:rchases exc hsive of casa:ity er W d charges when such energy is perchased c= an e---

da dispatch basis, less (4) the c st of feel recevered thr: ugh inter-s/s,e= sales inch'd r the feel costs related to energy sold c an ec=-de dispatch basis.

S = All hNh cales i= the base (b) and the c= rent (c) perieds.

S=h sales shan be: (1) syste= generati:n, p hs (2) purchasei pcVer, phs (3) interchange pcver-i=, less (4) ese gy fer ; =p r d

assceisted with the ;==:ed stcrage c;eratics, less (5) i=tercha=ge

cver-cut, and less (6) syste= 1
sses.

.s b

3ase fuel ecst cf 1.5157p per w' vatth =

=

S b

T: s/=ch:::ize the cost i===rence a d the b4"d-- acus =ent u= der this parag aph, bd'd r u der this paragraph vd' he based pre'd d -

arily c: the bd"d r =:.sth's sales -'tiplied by the a4ust=ent as dete. d ed above fr= the second precedi:g==th.

"'his bd " d r vd "

be subsecuently corrected by the de"ar a==u=t ever er t= der::Ee ted fr= the actual feel cost a4ust=ent fer the bd"d g =enth.

Such correctics vd" be =ade to the secc :1 bd"d g =en,,h folleving the p re,* d-nry ha v d 3 Mini::= Charge:

The capacity charge included in the rate a;;1ied to the capacit/

reservatica in effect. Fcr dete-d-d r the applicabd'dty of this "d d u= charge reverne received fr= the feel cost acus =ent clause shan be exclu:ied.

Delayed Pa;=ent Charge:

A delafed pa,:en charge of 2% cf the total net bd" shan be added to any bd" which is =ct paid c cr before the cue date shev therees.

4 4

..,-.4

.m, s

-,m--,-

y

,,. ~,,

,,,4-

.w-

Dsekst No. ER76-45 Ssuthscscorn Michigen Rural Electric Cooperativas, Inc.

Appendix B-1 Page 3 of 4 Tax Aijust=ent 3d ". shall be 1:=reased withis the -'ts of political subdi-visicas P ich le,/ special taxes, excise tanes, i=ce=e taxes, license fees er rentals against the Cc=pany's electric pre;erty, eritselectricc;eratics,ertheprductie:and/crsalecf electric energ/, to effset such special chuges and thereby pre-vent other cust=ars frc= being ce_pened to share such Iccal increases. Ed "

  • shan also be i= reased to effse: any new cr i= creased specific ta:: cr excise i=pesed by a:7 goverr.= ental authori:7 t;c the Cc::p any's generatic: cr sale of electric e=ergy.

+

reter-d-atics ch 3d"d r remani S=bject to the previsi=s of the Multiple tellvery ?cist Adjust-

ent belev, the bd "d r da-a-d 'or each==th shall be the -**'

da-*~d at each deliver / point fcr sud =c th, ; cvdded that the bd"d g da-a-d shall in no case be less t'-*- SC1, of the actual

-,vd

.:= kmvelta= pere (k7A) d-= _d established during s 7 thirty-

-d ute peried fc Hewd:g the cicek hem er a=y thir:7 ' u:e peried before the cicek hour cf such = cath. Eevever, in =c case shall the bd"d r da-*-d be less than cOf, cf the -"-d---

c -peak der?. d created during the precedd g H== ths er less than 3Cf4 cf the

~* ed.:= cff-peak de=a d created dur' g the preceding H==ths, whichever is,reater.

e

?cr pur;cses of this provisien the hers bet.reen 8:00 AM and 10:00 E{ Mc= day through Friday 5 =" ce=stitute the en-;esk peried. The 5

hours betwee: 10:00 24 and 8:CO AM Menday thrcugh Friday and an hcurs of Saturday, seday, and Eclidays shall be ccesidered cff-peak. The te:= Ecliday refers to New

  • fear's ray, Me=crial ray, Indepe=dence Day, Iaber Day, Tha-Vegiving ray a d C'.rist=as Day.

The fc11cv1=g rev paragraphs are adied to Sectic: 6 fcH e#_:s the paragraph entitled " Adjust =ent fer Pcwer Facter:"

Metering Adjust =e=0:

k'here serrice is s:; plied at a = md-*'_ voltage of =cre than 25,0C0 volts, the Cc=pa=y =ay elect to =easure the service at the st.; ply vcltage in which case 27, vd7' be deducted, for bdi'd g ;;;;czes, frc= the d-a-d and energy =easure=ests thus =ade.

Transic:=er Cunershim:

h*cere serrice is supplied at a :- d-al vcltage of =cre than 25,CCO velts and the cust=e provides an cf the necessar/ transfc.~' 5, c== trend g and protective equi;=ent fer *" cf the sertice, there shall be deducted fr= the capacity charge herein provided fer, the fellevir.g ~~thly credit per kW cf bd"d g d-a-d (after the 27, deductic: referred to abcve). Fcr these c '.stc=ers where par cf

_. ~ - _., -.,,,,,, ~, - - - -,...,

_.c..,w.-~

_,,....__,._,,w.,,_%-

Dock 3e N3. EK/b-45

^

Scuchssstern Michigen Rural Electric Cooporatives, Inc.

Appendix B-1 Page 4 of 4' their 1 cad is serted thecugh custc=er-cw=ed etc.i;=ent, the credit shall be based c the

-=-d

= htegrated da-a :d (after the 25 deducticn referred to abeve) created during the = cath thrcugh such custc=er-cwned ere.1;=ent.

(1) Supply Voltage M,CCO Volts er Iass

$.60 per k!I for the first 1,500 k:I

.25 per k:1 fer the ne::: 3,500 h:i

.10 per W fer all ever 5,C 00 h!f Wti:la reliver/ point Ad.',ust=ent In a=y =c=th h which this para.raph is effective, when the c=ste=er takes serrice at =cre than three deliver / pcists, the bdd g da-a-ds of such custc=er (as defined i: the Ee:e.-d atics cf Edd g De=and above) shall be ec=bbed, threngh arith =e ical s=s, withen: regard to ceincidence, in a -=- er deter =ined by the Cc=pany, sc that bde wd " be calculated a:d rendered fer three ce=bined deliver / ;cirts.

While this paragraph is effective, a surcharge cf $00.06/W shal2.

be applied to a -* ' = cf the first 2,200 W cf =cuthb-bdd g d*- * - d.

This paragraph shall be ef*ective c for the tire period fr=

Septe=her 30, 1975 to the third day after the date c which the !?C issues as crder accepths the Pre;csed Sett'a est Agree =ent in ??C tcA t nc. I276-45.

O e

,--,n.~.-.

~

Dock 0t No. E'176-45 Alp:nc Pov:: Cc=2cnv App:ndix B-1 Page 1 of 4 CFAI!GES EFFECTr/E SEPf::GER 30, 1975 To CCNIFACI FCR EECTRIC SERVICE EATED JU I 27, 1966 DErdEE:T CCITSUIEES ICER CC.9A!!Y AfD AGE:lA PC*TER CC:GA!IY (DESIG:nTED CC :SUISES PC CR CC;GA (Y TATE SCIEEU12 FPC !!O.13), AS R2'iDED BY ORDER CF TIE FIDEPAL FC*.iER CC:C:ISSIO t IT DCCl2T Io. E-7803 nrID AnotST 30, 1974 A!!D M1DE EFFI:TIVE JU:i2 7,1973 A*O BY IRICR A E:3:2: TIS In Sectica 6 of the Centract, If.'e paregraphs headed " Capacity Charge,"

"Eners7 Charge," "?.:el Ces: Adjust =ent Charre," ":finhu: Charge,"

"telayed Psy=en: Charge," " rete:::instien of 3i111=g Cenand," and "Ta::

Clause." are deleted and the folleuing new par graph: are subetituted in their place:

6.

?A"2:

The custc=er agrees to pay for such electric energy delivered to it hereunder 1= acccrdance with the fellevi.g rate, to vit:

licn:hl'/ Iste:

Capacity Charge:

$6.00 per Mt for the fir:t 2,2CO MT of 31* 3 re=and k.80 per Mt fer the next 7,6Co k!i cf 31111.g De=and 3 95 per k:t for the nex: 10,C00 k:t cf Billing re=and 3.ho per y,:1 for the ne::: 15,000 Mt cf Eilling re=and 3.10 per Mt for all over 35,CCo Mt of sim g re=and Energy Charge:

1.60# per kWh for all MTn Fuel Cost Adjust =ent Charge The fuel ccst adjust =ent, deter =ined =enthly to the nearest ene-theusandth of cne =ill per kilevattheur in accordance with the for=uls set forth belew, shall be applied to all kilevattheur: supplied durbg the billing = cath; i

F

?

c

'b Total S'tste: Efficicne r A=S X

b Estinate WP. lesale Sys :e=

ficiency

,n-

-,n

Dsckst No. ER76-45 Alpena Power Company Appsudix D-1 Page 2 ot 4 Feel Cost Adjust =ent Charge (Cc=tinued)

'4here A = Addust=ent fac:cr is cents per kilevattheur to be applied te ea" ' d'~rattheur supplied under this rate schedule.

F = "'he ecsts of fcssil and nuclear fael bu=ed in the base (b) and current '(c) perieds shall be as defined in Acccusts 151 and 513 ef the Unifc= Systa= cf Acccut s.

Fcel ecsts (?) sha n i=clude: (1) the weighted average delivered ces cf a n feel bur ed at the Cc=pany's electric generating ph::s, plus (2) the fuel ecsts asscciated with energ/ ;= chased en any basis other than an ecenc=ic distatch as ccatained in 3 belevs.a'"-

(3) the cet energy ces: ce energy pechases exclusive et capacity er d-a-d charges when such energy is prehased c an ecccc=ic dispatch basis, less (4) the ecst cf fuel recevered thrcugh inter-syste= sales including the fael ecsts related te energf scid c=

an ecc:<--d_

dispatch basis.

5 = An 'S sales in the' base (b) and the c= rest (c) pericds.

Such sales shan be: (1) systa= generatics, plus (2) parchased pcVer, plus (3) interchange ;cver-in, less (k) energy fer pu=;ing associated with the pu_ ped s:crage c;eratics, less (5) intereha:ge pcwer-cut, and less (6) syste= icsses.

n w

3ase fuel ecst cf 1.5157p per W -wat;heur

=

S b

To sy:-h --*-- the ces; incerence and the bd"d ; a4ustment under this ua.-s ath> bd"d-e under this pararraph vd" be based pre'd-d -

s -

arily c the bd"d r =enth's sales - 'tiplied by the addestsent as dete - d ed abcve frc= the secc=d precedd r =cuth.

This b d " d r vd "

be nbsequent27 cer seted by the do"'r a= cunt ever er =dercelheted frc the actual feel ecst adjustment fer the b4"d g = cath. Such ccrrectics vd" be =ade te the secced bd"d g =c=-A felleving the prei d-d-*:f bd "d r.

M* d u= Char:;e :

The capacitf charge included d= the rate applied to the capacitf reservatics in effect. Fcr deter-4-d r the applicabilitf cf this

- d - d - -- charge revenue received frc= the feel ccst ad. dust =ent clause shan be exc'"ded.

relsred pa;=ent Charge:

A delayed pay =ent charge cf 2% cf the tctal net bd" shan be added te a=y bd" which is cet paid c er befers the due data shew therecs.

r m#.

.+ -,

,,,--,,,,--mo r

_.rm,

uucMIC 00. C at / O-4*3 Alpina Powac Cc=pany Appendix 3-1 Page 2 of 4 Tax Ad.'ust=ent

. 2. d " - sha." *. e.'...~.a. ed

4-v'...--....= ' ' -"~ c. -." '..'..=. ' s.^ di.

e,.

visicus tich levy special tanes, excise taxes, ince=e taxes,

'*~

--...~.. e *",.. s ~.~.~..a ' a n'-.. s. "... = C..,~.~s

  • s = ' =,.... '..,., e.~~.~,,

s c

_4'..- e.'.a.

e,=..-'.'.'c

, c. *'.a,.- duc,.'~ a..*/...eale,a' e.'.a... '. e~.. -,.

c.'." e. s" -" ~,.~.' = ' char-a. s a.d " a..~. 5. -] :.~. -

es e

,n.,. c w..

w 4.s..

e -

,..,-._n.,4

.a u..

.c s

. su. a. 3.c.,.,

  • creases. = ' ' -

shall alze be 1: creased to cffset a=7 new c

.'.~.~..~..= s e s,- =..

,..an c.- =.~.'. e ' ~. e. s e.' *~, c.~s.-~., t=. ~-=.~..aL s

gg.b e*J a-.

'b.

I Q, g./ g e-.w..e..J e. c e.g.i g.

e.i.a e..=.J.a

.--s g,g.

J y

ea...=,,f.

... e Ta 4 es

.. e *. e.

-. 4..

Ce =4714-

.,e_

4 wSub ' e. '..., ~.'-a

-d

.~.v'a e a c.' - -.". u l'.'.,.' a. '. e i ' ~,.. /. # '. c'.A r'" s '..

y ge1.g,

.w. %.41-4.- g....a e,.......w

w..ek 17
s..,. *b.

-, 4 w...

o.-

g... A.

g.,, g g,.h go t 4 ve "s** 2. c...#c. s" *. - -*.'.,,~. ~*.*# '.= '.8 **S.'.

..'. a b4114=-

A dw

..=.s=4-_

.eb e 17

~

-a.,

C.e s. b e 7 s s '.b s _ cCd,a J ' b., ac*. *

  • 1 e.

-..,4-

'f41, 7,.1.a=y'"" e.' * (#* '.P' )' # = ~ " " #. estab' # '*k.a.,d

    • * '..# * - 2.
  • q* .'-.g-

.'. n

-a.

s 4

.,e.g e e,.,a e _11 4 - *b.

c h y.%

.. c gg7 e.t.4,

/.

4.o..g.,. 4 4 e

2

-,,.w

.e b e.#c.'. " a.,. hC b ~ - c ' sb'.~~..-....*.."..

2...-

.. - Ja '/=.', '.. c = s =,. s " *."

'.S.a.

%.4714 _ g...-.a. %e

.1 ss Abs fCdp C.e '..'.e -e.4 - C *

,'t " 'c. d=-' "n#

c.a.e,.a. c..,.4

, u..s...,...,..a 4 n

s -

.w c

3.a.. s..,. Ce c.,.s.

... a

-a 4

.,.,4-.,

c'..*,- a a2 ' =- * ~.^ cr". '. e ' d"-* - ;, "~=.,~.~ c =.'.',.'.,

.....'.a,

..w a,s...e.,.

4 s

s... e,. e Ier purpcses of this provisic the hces between 8:CO ri and. 10:C0

_A.v.a. s.] *s -..u.~.4.a.. s.we. _n c s.4&..e

w. c..

e t..e.,~. s.d.

,-u..

e

-s

- w w L' a-b e +.. e... ' O CO m..i and 8:CO n"..I v.c....s-.'... t -"..T-d ./ a..'. = "

2 w,

Ce e

.-a e.... e.., a4 a

.- n,,3 r aa.fs s o_n we C

.r.s...a C.e.,.

w

-s

.w

-j

o. -..

e,,

,.s..e e,u.=,...#e

.c.'.Te.x..a : s..st,

,3 v.

r

.1 r.

a.f, Independence ray, Iaber ray, ' - -Wgiving Eaf and Chris as ray.

':te fellevi=g nev parag aphs are added : seccic 6 felicving the

, ara _e,..,.. 4 e...a n. a,4,,. s -..

.e.,,. 2,,ve

g,.....n 3

n y

i.e.e a. a.,24...u cere service is s=pplied at a =~ *-C vcitare cf =cre chan 25 CCO n

velts, the C,a:7 =ay elecc to =eas = e the service at the stppl/

3 voltage in which case 2% v'" he ded.neted> fer b'"'m.tur.ecses, frc= the d=-*-d and energy =easre=e=cs thus =ade, m.,

e.,-. C. u c.

ncere service is supplied at a cr-d-C voltage cf =cre than 25,CCO ye., g a a. ~.u e

.-..Ja.g gn eg r,...n. n.. gag:s

.a.-

.~.,.a-,,

t c.

774. a J.,,e.ec44:e e,.J J.,.

a.7 7 c.J 4.e se 3..

Ab..

s

,.n y e Se n+ e

.c s.e ca}~,,c.~acha ~ '~ ~...'..~~.'-'=^.*,., ~'=

i.

u a.. s

'c." ~n" s-

~...' '.J' c.~ <8 '. ~,.. ~ W c.' b ' " '-

A =-e

.4 (a.*.e..' a

~ *s t

a deductics referred te abcve). Fcr chose custc=ers tere pare cf

~"

Dockat No. ER76-45 Alpsn.s Powsr Company Appendix 3-1 Page 4 of 4 their lead is serted thrc gh custc=er-cuted equi;=ent, the credit shall be based c the mani._.:= integ sted da-+-i (after the Ef, ded:: tics referred to above) created during che =c=th through such custc=er-cw=ed eeni;=ect.

(1) Suppl 7 Voltage 46,CCO Veits c Less

$.60 per Zi for the first 1,500 Zi

.25 per ET for the sexe 3,5C0 Ei

.10 per Zi fcr aLL cier 5,CCO Mi

!Mitiale Deliver / ?cist Ad',ust=ent In acy =c=th 1: which this paragraph is effective, when the custc=er takes sertice at =cre than three deliver / ; cists, the bd g da-=~ds of such custc=er (as defined in the Dete. ' stics cf 3"'d r D -+-e above) shall be cc=bined, thrcush arith =etical s=s, wichent regard to coincidence, in a =acrer dete. ' ed by the Cc=pany, se chat b"'e v be calc-ted and ---d-- d fcr three ec=bined deliver / points.

Vcile this paragraph is effective, a surcharge cf $CO.126/kW shall be applied to a "' rd-- cf the first 2,200 ZI cf =c=chly b"~r da-=-d.

"is paragraph shall be effective c=17 fer the tf=e peried frc:

Septe=ber 30, 1975 to the third day after the d::.te c which the ??C issues as crder accepting the pre;csed Settle =ent Agree =ent in ;C Decket Nc. I?l76-45.

+,-

~

Docks: No. ER76-45 City of Coldwats:

Appandix 3-1 Page 1 of 4 C.'#U"_"a _r.r.&_~".'.r<'r. szm_ _ r=..to, _' 975 to C c.~. =aC.' TC=. v.m

...u S,_., m u

v rAI D II3.?lutf ik, 1972 3.7.EZ'T CCHSCERS PC'dIR CCMP.UTf A:D CEE CI~T OF CCIT4Am (DESIGNAID CC:SUMIES PCWER CC:EA:Tf FACI SCEEOUII FIC NO. 29), AS A:C:CD 3Y OEDIR CF N3 FIDIFAL PC*a?.R CC ESSIC:i IH LCCFI-'

No. I-7803 IATE AUCCST 30, 197h A.D W. D, :.:::~.,._ <:.

,_. 7,.3.9 a s

am:.

1.

  • inere used in these changes, the te= "custe=er" shan be dee=ed to be interchangeable with the te= " City."

2.

In Sectie: 6 ef the C : tract, the parag aphs headed " Capacity Charge,"

" Energy Charge," "?tel Ces A 4 stze : Charge," "Minimus Charge,"

"Debyed Payment Charge," " rete-- '.atics of 31 g tera:d," a:i " Tax Clause," are deleted a:d the folleving nev parag sphs are substi;uted in their place:

c.

ca. n:.

The custe:er agrees to pay for such electric energy delivered to it herec= der in a--- 'a--- vith the fc E:ving rate, to vit:

Menthly Rate:

Capacity Charge:

S6.CO per k:i fer the first 2,200 k'4 of 31"' r De=and h.60 yer 'G fcr the nex 7,8CC k'I c! 3*'*

c Demand 3 95 per 'a for the next 10,CCO k'd of 3*'d g re.and 3.40 per k:i fer the next 15,CCO 'a of 31"d g re=a d 3.10 per k'i for an over 35,CCo 'a of 3'"'

r t ---d Isergy Charge:

1.60d per kWh for a n kWh Fuel Ccst Ad'ust ent Charge The fuel cest acus =ent, ( 2te.

  • -'ed ::sthly to the nearest c e-theusandth of cae =ill per kilevattheur is accer'atee with the fe. ::ula set forth belev, shall be applied to all kileve th:urs supplied during the be c ::sth:

I r

r

  • c S.
m. ae

_7

'. a =_ ***#4 a 4 m _- a..

. _-.----. ~.

S

  • t'=*=*

hc1***1* SI*=*= Z i=i'=#I b

.m.

,-g-y e

y

_c.,

,_,q,..w

~

~~

Dschat No. ER76-45 City of Coldwater Appandix 3-1 Page 2 of 4 Ftel C:st Ad.'us:=en: Charge (C ::i=ed) i

'4here A = A4ust=ent facter in ce=ts per kilevatther to be applied to each kilevatth = supplied := der this rate schedule.

F = Tue costs cf fossil and== lear Ocel bu::ed 6 the base (b) and cerent (c) peri:ds shall be as da"'-

d

'- Acc =:s 151 and 513 cf the Unif=== Syste= cf A ::=:s.

? el ces:s (F) shall inchde: (1) the veighted. average delivered cost cf a" **='

bur:ed at the C:= pan /'s electric generating plants, phs (2) the fuel costs associated with ene gy pecP.ased c any basis other than an ec ::=ic dispatch as cc tained in (3) belev, phs (3)thenetenergyces: cf energy Frehases er.:'"eive cf capacity or d e -i charges when such energy is p r '-ased c= an e---- *-

dispatch basis, less (h) the cost cf Ocel recovered threugh inter.

syste= sales including the fuel ces:s related to energy scid en an eccc *- dispatch basis.

S = All h7: sales i= the base (b) and the c= en: (c)perieds.

Such sales shall be: (1) syste= ge=eratien, plus (2) pechased

crer, plus (3) intercha=ge pcver-in, less (k) ener f for y,
=p =g 3

g ass ciated with the.- =.-

pcVer,-cut, a:d less (6).ced stcrage c.uerat.ic s less (5) i= tere"*- e systa= lesses.

.v 1 = 3ase fuel ecst of 1.515 p per W atth =

S w

To sj=chresize the ces; in =rence and the l'"'

g acus:=ent = der this parag aph, b' c under this para-ap. *.".'. he based pre-'

s a.,a,/ c:.w.

54 n 4

,..-.w s sa.s

._,,.4.,,4 a

,.... a,24u.s

.,, a,.

w dete

  • ed abcve fr = the see d preceding : sth.

':his b' "

  • g " "

be subsequently corrected by the de"ar a==unt over er u= der==llected u

a 4....

me a,~._.._.o..._,

s., a #

.u. u 4,.u.

.e..

m.

._m c, _.,.&. i_.a n w

- e c

o.w.

s e, _-.a. s, e n 4.

_. _.,, w

,, n a

...e w

pre' * ' ary b

5 i

I F#

  • u= Charge:

i The capacitJ charbe included i= the rate applied to the capacity

. e s e.. a'. ~..~. ~ ef.*=. ~ '. =. c-d=. t e * - '_. - *.*.^. a..' ' c ' b _' ' * "/ c' - ' s i

~' ' u= charge reve=e received fr== the fuel cest addust=ent clause shall be ex lnded.

Delayed Pay =ent Charge:

A delz/ed pa*/:ent <'-* ge of Ef, cf the t tal ne b3" shall be added to a=y b'" which is cet paid c er befcre the d=e date sheva therec=.

City of Coldwater Appsndix B-1 Pega 3 of 4 Tax Adjust =ent

.d " e s' = " ba d----ase"

..'d.

'w a.

'd-..- c.',..'.d..d_.a_', su%., di-visicus W.ich levy special taxes,. excise taxes, inec=e taxes, license fees er rentals against the Cc=pany's electric p. jerty, oritselectriccperatic=s,ertheproducticsand/crsaleof-electric eser,/, to offset such special charges and thereby pre-e vent other custc=ers frc= being ci jened to share such local' increases. 3d " e shall also be increased to offset any new or increased specific tax cr escise i=pesed by any gover== ental authority upc= the Cc:p any's generacien er sale cf electric energy, reter=inatic: of =d"d--

re-*-d Subject to the previsicus cf the Multiple Delivery point Adjust-

=ent belev, the bd "d g d-'-l for each =c=th sh* " be the -"~~

dea-d at each deEver/ pcist for such =enth, provided. that the b d " d g da-e.i sha" d c case be less t'== 80% of the act..a1

-su u: Wyc1ta= pere (kVA) de=a d estabEshed duri:ui; a=y thirty-

-d ute period follcwing the cicek hcur er a=y thirty

-d ute period before the elect hour of such =c=th.

Ecvever, i: =c case shan the bd"d g dea-i be less than cC$ of the -"d-c=-peak de=and.

created during the preceding H =c=ths er less t'an 3Cf of the m d ~~

off-peak de:_and created durd g the precedi:g.H =caths, W.ichever is greater.

i For purposes of this previsic: the Ecurs between 8:00 AM and 10:00 24 Mc= day thrcugh Friday shall censtitute the cc-peak period. The hcurs betwee 10:00 21 a=d 8:00 AM Menday thrcugh Riday a:d an hcurs cf Saturday, Sunday, and Eclidays shan be cc sidered eff-I peak. The ter= Ecliday refers to New Year's Day, Me=crial ray,

7. dependence Day, Labor Day,1" a-Wgiving Day and Christ. as ray.

The follevi=g new paragraphs are added to Sectie 6 fc11cving the pars. graph entitled " Adjust =ent for power Facter;"

d Meter cr Adjusc=ent:

Where se:vice is suppliec at a :

d-=' voltage cf =cre tha: 25,000 volts, the Cc=.a.=y =ay elect to =easure the service at the supply voltage in which case 2% vd" be deducted, fer bd"d g purposes, frc= the d-='d and energy = essure =ents thus =ade.

Tre=sfer=er Ownershia:

Where. service is supplied at a umd-al voltage of =cre than 25,cco volts and the custc=er prevides an of the necessary transfer d 5, ce=tren d,- and protective ecui;=ent fer au cf the service, there s**" be deducted frc= the capacity charge herei provided fer, the foneving =c=thly credit per kW of b4"dag d--d (after the 2%

dednetion referred to above). Fcr those custc=ers where parc cf I -

f i

l

[

i l

~~~

DocKct No. ER/6-43 City of Coldwater Appandix B-1 Page 4 of 4 their lead is serted threngh cust=er-e.cr.ed er. ip=ent, the credit shall be based c tha '"-

integrated da-=~_d (after the 24 deductic: - #a-d to abcve) created dring the = cath through such cust=er-c.::ed eq:.i;=ent.

(1) Supply Vcitage h6,CCO Vcits er Less

$.60 per Mi for the first 1,5CO Mi 25 per Mi fer the ne:c: 3,5CO ti 10 per 2'i fcr n cier 5,CCO Mi Italtiple Deliver / Poi =t Addust=ent In a=y =c=th in Pich this pars.,raph is effective, when the ceste=er takes sertice at =cre than three delivery points, the bdd g da--ds of such cust=er (as defined in the Deter-d-* tics of Ed"4-- De=and above) shan be c=bined, threagh arit'=etical s=s, withcut regard to ccincidence, in a =a=er date.-d ed by the Cc=any, se eat bills w7 be calculated a=d rendered fer three cc bined delivery peints.

P 41e this paragraph is effective, a s= charge cf $C0.126/MTshan be applied tc a -* d

= cf the first 2,2C0 Ef of =cuthly bd"' g 5 - -_ a.

n.is parag-aph shall be effective c=ly for the ti=e period frm Septe=ber 30, 1975 to the third day after the date c= W ich the FK issues as crder accepting the Preposed settia-**t Agree =ent i: ~K Dcchet No. I?.76-45 i

i e

i i

e

_y._

.7


r---

t-

~~

~

D:ckOc Ns. ER76-45

~

Edissn Sault Elcccric Co=pany Appendix B-1 Page 1 of 4 CFJTu~ES 7..'.: "".'-'F-.".?.. ".'r -272

.,0,

' 0,75

".'O Cw"".."'. AC'.' CR ?.2.z~.'...m.",

.c

.t u.

p,A,L.D M"C'/.".,..". 2',

a' C7'* :r.".*es T'I CC". SIT.'.'RS.:G. e.-7*.

Cw^.' :.1"%.e.,

s Y

AND EDISCH SAUL':' E12CTRIC CC:.:P.Wf 7.,

3 e4..,... 6,..' '.".. a C.'.. "s

, ' ". =.,a. =.s-. *.. %..e a d a d. "< a,.a c 4.f CS '.-- a, "

" =. *. g C".:. a -..', " ".* =. ' C,,.-.

.s* c'.', - * ~ e... '-"..a -, =., " ".'.'.'. '...'. C.".s.-~ =., "

v..

3 n e,1... e. s,.

... C.u.1. _.,

n e e..<.a.

c.,24, 4,.-..,n a

n.,.

a u

1 Cir.use,"- are deleted and the felleving nev paragrs;h: are subs:1:nted

.,,4.,..,. 3 a C..

= -.

c.

c.,

,an, o,.

g - u.. e,.. c. _* s~ *. =. ". e,' A =. ' _' v e.- '.

n u...

,.,._e g-...,

3

. o. s

... a..

a_. g...a., - ~.

.p_~.u a.

e.

<c - n < -..,. e,..-,p..

o Menthly ?.ste:

Capacity Charge:

g.co e

.a.r.y o.c..u, o.s.. g,c,,0 M.To'

='U." -,

.. A e

. k.5:0 :.e-k'.I 'c.

.".a.

.x.

<3."c,.,0 k'.i

. t.' _'-.

.N.

_=..4

..a.x O, C"O 'c,:7 c.' 2_* " '.,- %.

..a.

3.c,,5

.- k'.i.'

'".a 3.LO per k'I for the nex: 15,CCO k'.i cf 3< n '.g re=azd 3.10 per kii fer all c ter 35,CCO k!i of 3* r I'e:a:d I ergy Charge:

1.60d per kiih for all kiih Fuel Cest Adjust =ent Charre

m. e <u., c~.

a%us

a..'.,

a t e. '.a. d..~....'..y' " ' o '.".a..a. a e s',.

d' ene-theusandth of cne mill per kile attheur in accordance with the for=ula set forth belev, shall be applied to all ki'.. a ".".u. s ss.,,-' i ' a.d c~ '~ d.,- '. " a '.".*;-.

^....

1

  1. b Tetal Syste: Efficien,.,

A=c

- X i

i

.e,.

.4_,.

4..

,.i..,.i..

.e.. e..

o j

i l

I i

y-

Dockat No. ER76-45 Edison Sault Elsceric Cc=pany Appendix 3-1 Page 2 of 4 Fuel Cost Addus =ent Char:te (Centi:ned) 7cere A = Adjust =e : facter 1: cents per k-v=_tthc= to be applied to each hilevattheur supplied under this rate schedule.

F = The cests of fessil and nuclear fael bu=ed in the base (b) and c= rent (c) periods shall be as de^- d '- Accccts 151 and 518 cf the U-d' - cysta= cf Ac:==:s.

Feel cests (T) shall inc hde: (1) the weighted average delivered ces; ef all feel burned at the C:=pany's electrie 9:erati g plants, plus (2) the fuel costs associated with e:e.d ;crchased c= any basis c her than an ece :=ic dispatch as ce=tained in (3) belev, plus (3) the net e:ergy cost of energy yrehases exclusive of capacity s

er d->-d charges when such energy is y= hased c an e ::c=ic dispatch basis, less (k) the cost of feel recovered threngh inter-syste= sales includd g the feel costs relate'. ;c' energy s=ld c as e :=-de dispatch basis.

S = All k:i: sales i= the base (b) and the c= rent (c) per'.eds.

Such sales shall be: (1) syste: generatics, plus (2) parchased

cver, p'"* (3) intercha
ge rever-is', less (k) energy fer Fa--ping ass:ciated with the y= ped stcrage cperatics, less (5) inte.~la=ge pcuer-cut, a:d less (c) sr ;~e= lesses.

b Ease fuel cest cf 1.5157p per 'd'-vattheur

=

S b

To synchreni:e the ecst i::=rence and the bd"* r adjus:=ent under this.rars-su.h, b"-

u='er this par =~aph v 'be based pre '~' -

1 s

n arily c the b'"* g =cuth's sales ::altiplied by the adjust =ent as dete.-d ed abcVe fr= the see d preceding== th.

This b' " d r v' "

be subseque::17 ccrrected by the de"=r a===

cver er und-- "--ted fr= the actual fcel c=st adjust =ent for the bd"'

g==th.

Such correctic: vill be =ade to the sececi b'"d g===th foll:wi=g the 3 ;e 1 4 4 -,: / b 4 " d g.

M* d u= Charge:

The capacity charge included is the rate applied to the capacitf reservatic: 1: effect. Fer dete.-d-d g the applicabd'* ty of tbd e l

~d-d -

charge revenue received fr= the fael cost adjust =ent clause shall be excluded.

Delayed Pay =ent Charge:

A delzyed pa/=ent charge cf 2% of the total =et b4" shall be added to a=y b'" which is not paid c er bef re the d:e date shews therees.

~

Dockac No. ER76-45 Edison Sault Electric Company Appendix B-1 Page 2 of 4 Tax AM ust=ent 3d "

  • s% " be increased dithin the 'd-dts of political subdi-visicas ** * 'a',y special taxes, excise ta:es, inec=e taxes, license fees er rentals against the C= any's electric prcperty, oritselectriccperatics,erthepred:cticsand/crsalecf electric energy, to effset such special charges and thereby pre-vent other custcers fr= being ec=elled to share such heal increases. 34 "
  • shan also be increased to offset a=y new c i= creased specific ta cr excise d.=pesed by a=y gover= ental antherity upc the Cc:p any's generatic cr sale cf electric energy.

Deter-d atics of 3d" d-e te=and Subject to the previsic=s of the Multiple telivery ?cist Adjust-

=ent belev, the bd "d g d--

' #cr ea"- --th shan be the -~'~m de=and at each delivery peint for such =cuth, provided that the bd"d g d---d shall in no case be less t'- SOf, cf the act-*7

-**~= W' evelta= pere (hVA) d--*-d established during any d-ty-

-dmute perici folicwing the cloch hc= cr any thirty d ute peried before the elech hcur of such = cath. Ecwever, is no case s"*" the 3

b d " d g da-e d b e le s s t%" 60$ of the -= -d -- c -peak de-e-d j

created 6aring the preceding n =c ths er less than 3Cf cf the

-M

= cffe-peak d-*-d created d=ing the preceding H =c ths, f ichever is greater.

I For pu:7cses of this previsic: the hc=s between 8:C0 AM and 10:00 E4 Menday thrcush Friday shall cc stitute the c -peak period. The hcurs between 10:00 24 and 8:00 AM Mc day through Friday and an hces cf Saturday, S= day, and Eclidays shan be cc sidered eff-pa*. "he te= Ecliday refers to New Year's Day, Me=crial Day, Independence Day, Iaber ray, T'"-W giving Day asi Christ =as Day.

The follcwing new paragraphs are added to Sectic: 6 fellcwing the rph entitled "Agust=ent for ?cwer Iacter;"

para Meteri=~ AMust=ent :

'rTeere service is supplied at a =~~d-*' voltage of =cre than 25,CCO volts, the Cc=pa=y say elect to =easure the sertice at the supply voltage in which case 26 v " be detacted, for bd"*

3 purposes, d

fres the de=and and energy =easure=ents thus made.

Tressfer=er CwnershiT:

W.ere service is supplied at a d-*1 voltage of =cre than 25,0C0 volts and the custcer provides an cf the necessary transfc=ing, cc trolling and prctective equip =ent for *' cf the sertice, there sha" be debacted fres the capacity charge herein provided fer, the fellcwing =c thly credit per kW of bd"d g d---d (after the 2%

deductics referred to above). Fcr those custcers where part cf

~-

- - ~

Dsekst No. ER76-45 Edison Scult Electric Ccepany Appendix 3-1 their lead is serted thrcush custc=er-cwned equi; age 4 oJ 4 P

=ent, -se credit

~

sha2.1 be based c= the =ard m integrated d----d (after the 25 deductic: referred to above) created during the =c=th thrcush such castc=er-cwned equi;=est.

(1) Supp4 voltage he,0C0 volts er T.ess

$.60 per Z1 fer the first 1,500 k:f

.25 per kW fer the ner: 3,500 kW

.10 per Mi fer a cver.5,CCO h:i Multiple Delivery k12t Ad. inst ~ent In any =c=th in which this paragraph is ef*ective, when the custc=er takes sertice at =cre than three delivery peints, the bdd-- da-'~ ds of such custc=er (as defined. i.: the Dete. ' atic: cf 3dd g De=and above) shall be ce=bined, threngh arith =etical su=s, withcut regard to coincidence, in a =ar er dete.-d ed by the Cc=pany, so that b4"e vd " ce calculated and rendered fer three ce=bined deliver / points.

'A'd'e this par %raph is effective, a surcharge of $00.126/kW shall be applied to a -n d - cf the first 2,200 Ei of===thly bdd g

de=and.

This paragrsph shall be effective caly for the tt:e peried frec Septe=ber 30, 1975 to the third day after the date c which the FIC issues an order accepting the. W osed Settle =est Agree =ent in Ipc Docket 27o. IR76 45.

t 0

- -..,,-,,,, ~...,,

..,,-,n,--..,

~

Deckat No. IR76-45 City of Hillsdale Appsndix 3-1 Page 1 of 4 CHAliGIS u2 CTTE SI??EGER 30, 1975 TO CCITIFACT FOR IIICTRIC SIRVICI DATID suuGER IS,1967 3IT'EI:i CONSU!ERS 20ER CC!GANT AID TEI CITY OF FmE2 (DISIGITATID CCNSU:ERS IC'4IR CC:GAli? FA3 SCHEDUIZ IK Iro. 6), AS AME:DID BY ORDIR OF THE IIDIFAL PCWIR CC31ISSICN ET DCCIET NO. I-7803 h

EATED AUGUST 30,197 AND IGDI rn.CTT/I JEE 7,1973, A2TD 3Y PRIOR AtenecS 4

1.

'dhere used i= these changes, the tar: "custc=er" shall be dee=ed to be interchangeable with the ter: " City."

2.

I Sectic: 6 of the C ::raet, the parag aph: headed " Capacity Charge,"

"Icergy Charge," " Fuel Cost Adjust =ent Charge," " Mini =:=s Charge,"

" relayed Psy=en: Charge," "Cete:=inatic: of 31'd r te=acd," and " Tax Clause," are deleted and. the foll:ving nev paragraphs are substituted in their place:

6.

FATI:

The custe=er agrees to pay for such electric energy delivered to it hereunder is accordance with the follevi g rate, to wit:

Mc=thly Este:

Capacity Charge:

$6.C0 per kW for the first 2,2C0 kW cf Ed"d g Ee=and j

k.80 per 22 fcr he next 7,800 kW c! 31'd g De=s=d 3 95 per kw fer the next 10,CCo kW of Edu d g re=and i

3.% per kW for the nex: 15,CCO kW of Bind g Demand 3.10 per k'i for all over 35,CCO kW of Ed"*

re=aci Energy Charge:

1.60p per kNh for 11 kWh l

i i

Fuel Cost Adjust =ent Charze The fuel c=st adjust =ent, deter =ined =c thl:7 to the nearest c=e-theusandth of ene =ill per kilevattheur in ace =rdance with the for==la set forth belev, shall be applied to all kilevattheurs supplied during the bd"d g ceth:

y v

c

'b Tetal S'fsta= Ifficieref A=S S

Is 1=sted F Oler. ale Syste= Ifficiency

.X 3

3 e

m.

rm~m.~.-.-y-

,wm.-,-,

Docket No. CR76-45 City of Hillsdale Appendix 3-1 Page 2 of 4

. el Ccst AC ust=ent Charge (Ca 'd-"ad) 7cere A = A4ust=ent factor is cents per kil:vattheur te be applied to each kil: attheur supplied under this rate sched.nle.

F = The ces:s of fessil and :nclear feel bur:ed in the base (b) and current (c) peri:ds shall be as defined in Acccusts 151 and 513 cf the Unifer= Syste= cf Acc usts.

3:el cests (?) sha n include: (1) the weighted average delivered ces: cf a n f e1 bu:=ed at the C:=;any's electric generating plants, plus (2) the fuel cests ass ciated with ene.gy purchased c any basis cther than an e :::=ic dispatch as ce= tad-a' '- (3) belev, plus (3) the cet energ-/ cost ef ener a Farehases exclusive of caracit/

cr d - -d charges when such energy is parchased c an e :::=ic dispatch basis, less (k) the cost cf feel recovered thr ugh inter-syste= sales in:'-dd r the feel ces:s rehted c energy scid c an ecc==ic dispatch basis.

S = An '6h sales in the base (b) and the current (c) pericds.

Such sales shan be: (1) syste= ge=erati=, plus (2) purchased pcVer, plus (3) i=tercha=ge ;cver-f=, less (4) energ/- for p ;d r ass:ciated with the pu :ed stcrage c;erati=, less (5) interchange pcver-cut, and less (c) systa= 1:sses.

D 3ase fuel cest cf 1.5157p per 'ed'~eattheur

=

S b

I To sy: '- '-= the ccst incurre=ce a:d the bd"d g ayust::ent under this rara - su. h, b d " d-- under this pa.s-aph.-*" be based. praid-d -

-s a d'-4 c: " = k d " d -,,

c...- s s a.'.a s _" .d,."._ad_ './ a-ado'us'._ _'. as dete.-d ed abcve fr== the se==d preceding===th.

This bd " d r vd "

be subsecuently corrected

  • 7 the d="=r a==unt ever er t=dere:Hected fr== the actual feel c st a4ust=ent fer the b'"d r =enth.

Such c=rrecti n vd" be made to the sec =d bd"d g===th felle -1:g the z.,,a_a-, j ba n a.,

Mind a Charce:

The capacit/ charga d--'" dad d-the rate applied to the capacit/

reservatics in effect. Ier dete.-4 4 r the applicabdty of this d d ---- charge reve=ue received fr== the fuel cest a4ust=ent clause shan be e=='" dad.

i relayed pa*/=ent Charge:

A dehyed pa,-.e=t ** ge cf Ed,4 cf the *ctal.et bd" s:-*" be added to a=7 b d " which is =ct paid c: cr befere the due date shew: therecs.

neckat No. ER76-45 City of Hillsdale Appsndix 3-1 Page 3 of 4 Tax Ad. inst =ent 34" e shall be increased within the 1d-dts of political subdi-d visicus which levy spee *' ta::es, excise ta:es, ince=e taxes, lice =se fees er rentals against the C% any's electric prcperty, or its electric cperstic s, er the prcductics and_/cr sale of electric energy, to offset such special charges a.d thereby pre-vent other custc=ers f-w bed g cc=pelled to share such 1ccal

!= creases.

3* '

  • shall also be kcreased to cffse: a=y new cr i

increased specific tax cr excise i=pesed by any gover== ental authcrity upc the Cc::pa=7's generatics er sale of electric ene ef.

Dete-d atics cf 34"# g te=and Subject to the provisicus cf the Multiple Deliver / pei=t Addust-

=ent belev, the bd"# g dea-2 fer each =c th shan be the ~-'.=:

d--=-d at each deliver / poi =t fer such = cath, p=v'.ded that the bd"d g d=~~.d shan in =c case be less t'-e _ 2C$ ef the actual

-= d = kilovelta= pere (kVA) da--d established d=ing a 7 chirty-

-d ute peried fe"V_:g the eleck hcur er a:7 thirey d ute peried before the eleck hcur of such =cuth.

Ecve;er, i: =c case sha n the bd"d r da-a-d be less than 6Cd, of the ~~'~m en-peak de=and created during the precedi:g H =cuths er less tha: 3Cd,, cf the

. =axi=== cff-peak de=ati created d 4-= the :rece d--e 11 =cuths e

whichever is greater.

s For purycses of this previsic: the hcurs between 8:C0 AM asi 10:C0 FA Mc: day thrcush Friday sb*" ccustitute the c -peak pericd.

The hcurs betwee:.10:CO 31 and 6:CO.-91 Mc day threugh Friday and all hcurs of Saturday, Sunday, and Ec11 days shan be censidered eff-i peak. The ta= Ecliday refers to Hey Year's ray, Me=crial ray, Independence Day, Iaber Day, PeWgivd_=g Day and Chrdst:as Eay.

The folicwing new paragraphs are added to Sectic 6 fo"rwing the param sph entitled "Ad'us =ent for pcwer Faccer:"

Metering Adfiust=ent:

1 Where sertice is supplied at a sc-d-*1 vol: age cf =cre tha: 25,CCO volts, the C% a=y =ay elect to =easc e the sertice at the supplf voltage in which case 2% v4" be deducted, fer bd"# c p= poses, frc= the de'-d and energ = ease =ents thus made.

f Ore sfc=er Cwnershi::

Where serrice is supplied at a =c 4-=1 voltage of =cre than Ef,CCO volts and the custc=er provides au cf the necessar/ tre-efor d 3, ccetro"# r and, protective eq=ip=ent fer =" cf the serrice, there sha " be deducted, frc= the capacitf charge herein provided fer, the fclieving =c=thly credit per kW cf bd '#

da~ ~d (after the 2%

deductica referred to above). Fer those custc=ers :/=ere parc cf k

,,--m..,.,,,--,,-,..,

c._,.

~.-.,n

Dock 2c No. ER76-45 City of Hillsdale Appsadix B-1 Page 4 of 4 their lead is serted th cush etdite=er-cw=ed. egaip=ent, the credit sha_',be based c tha ~'-d-d 'egrated d--'id (after the 25 dei _etics refer ed to above) created during the =c=th thrcugh s=h custc=er-cused etcip:ect.

(1) Supp21/ Voltage 46,CCO Volts er Iass

$.60 per Mi for the first 1,5C0 MT

.25 per MI fer the nex 3,5CO Mi

.10 per Mi'fcr n cier.5,CCO 21 If.:ltiple Deliver / Icist Ad. dust =ect In any===th in which this paragraph is effective, when the custc=er takes service at =cre than three delivery ped =ts, the bd* g da-'nis of such custcer (as defined i= the Dete ' atic: cf Ed ! De=ati above) shall be ec=hd.=ed, thrcush arith =etical st=s, withcut regard i

to ceincidence, in a

~3-er deter-d ed by the Cc=pa=7, so that bd-

v be calculated *-4

-a-da--A fer three c=bited deliver / points.

'wcd'sthispa.~graphiseffeccive,asurchargecf$CO.126/k:Ishall be applied to a -+ u= cf the first 2,2C0 Ei cf===thly bdd g da-'-d.

This paragraph shall be effective c=ly for the ti=e pericd fr=

Septa =ber 30, 1975 to the third day after the date c: which the :-?':

issues as crder accepti q the Weposed Settle =e=

Agree =ent in FpC Decket 'To. I?lTo-45 I

~

-n,

,.. ~ -.

Dsckat No. ER76-45 City of Marshall Appendix 3-1

~

Page 1 of 4 CE!;GES :.:::.CTr.'I SEFIZ'GI2 30,1975 TO CCITIFACT FCR IIICTRIC SIEWCI DATED AUGUST 22,1967 3I:2I:T ConSU:c2S ;CWIa CC: EAST AS THE CI:'? 0F MAESSI.L (DISIG: TATE CCNSUMERS PCHIR CCIGAi? FATE SCHZ UIZ.E UO. 7), AS A'EIDE 3Y CEDIR CF THE yEDE?AL ICE 2 CC:CCSSIC:T TT ECC:GT UO, E-7603 IATED AUGUST 30,197h AID MADE :,s::.CTr/I JUIG 7,1973, A:D 3Y FEIOR AFEDECS 1.

Where used i= these changes, the te= "cus:c=er" shall be dee=ed to be i= ere. angeable with the te= " City."

2.

In Sectic:: 6 cf the Ccatract, the paragraphs headed " Capacity Charge,"

"I ergy Charge," "Flel Cest Ad. fast =e:: Charge," "Mi=i=u= Charge,"

" Delayed Fay =en: Charge," "reta=inatics cf 31d r Eer?nd," and " Tan Clause," are deleted and the fe nc. ring nev paragraphe are subs:ituted i= their place:

c".

=A. :.

The custc=er agrees te pay for such electric energy delivered o 1: ge...- a.

4 - ac-4 --- with the felleving rate, to vit:

lenthlyEste:

Capacity Charge:

$6.CO per 'd for the first 2,2C0 'd of 34d r re=and k.80 per k:7 fer the ser: 7,cCC k!i cf 31* r re=and 3 95 per 'd for the next 10,CCO k:7 et 3** g recand 3.40 per 'a fer the nex: 15,CCo k:7 et 34"*

re=and 3.10 per k:i fer all ever 35,Cc0 k:7 of 34"* r re=acd Energy Charge:

1.60d per k:in fer all kWh Fuel Ccst Adjust =ent Charge The fuel cost ad'ust=ent, detemised =cathly te the nearest cre-theusandth cf cne =ill per kilevattheur is accordance with the fc=ula set forth belew, shall be applied te all kilevattheurs supplied during the be

g =enth:

e A=e

'b Total Syste= Ifficien.~.f X

S S*c Z#ti *=*

  1. l***1* S73*** A i0l**7 b

9-w

,---,--,-w.,y-.-,

p~---,

~-m

,p--,

~~

~ ^

City of Marshall

~ ~

Appandix B-1 Pass 2 of 4 Fuel Ces Adjust =e.t Charge (Ccetinued) tihere A = Adjust =ent factor 1: cents per kilevattheur to be applied to each kilcuattheur supplied = der this rate schedule.

i

? = The ecsts of fossil and nuclear feel bu=ed in the base (bi.

and c= rent (c) perieds shan be as defined in Acccunts 151 an:

518 cf the Unifc= Syste= cf Acccus:s.

Fuel ccsts (F) shall incl de: (1) the veighted average delivered cost of all feel burned at the Cc=pa=7's electric generati:s plsets, plus (2) the fuel costs as:cciated with energ purchased c any basis

/

other than an ecccc=ic dispatch as ccetained in (3) belev, iseity

,1us (3) the set e:e./ cest cf energy y= chases e=clusive of ca er d

-d c'.arges whe: such e=e_e/ is pe "-* sed c: an e-dispatch basis, less (h) the ecst of fael recovered thrcush inter-syste= sales ine'-de ; the f:el costs related to energy sold c an ecc=- de di patch basis.

S = An 'dre sales in the base (b) and the c= rent (c)pericde.

Such sales shall be: (1) s/ste= generatic=, plus (2) purchased pcver, plus (3) 1::ercha=ge pcver-i=, less (4) ene./ fer Frping asscciated with the y= ped s:crage cperatics, less (5) i= tere"* se

cver-cut, and less (c) syste= icsses.

~

.v b

3ase fuel ecst cf 1.5157p per *< vatthe=

=

S b

To synchrc ice the ecs: incu=e ce and the b4"' g adjust ent u= der this parez 1ph, b"'* 5 c der this paragraph 7"' he based pre'* ' -

arily en the bd"' r = cath's sales -"'tiplied by the adjust =ent as dete-d ed abcve frc= the secc d preced'

=ceth. This b' " ' ~ r vd "

be subsequently ce=ected by the dellar a= cunt ever er undercellected frc= the actual feel ecst adjus"- ' '-- the bd"' g =enth.

Such ce=ectic vd' be =ade to the secced bd"d r scuth follcwing the 3:,,a a-,:7 bana 3, M4nd u= Charse:

The capacitf char e i=cluded i= the rate applied to the capacity e

reservatics in effect. Fcr dete.-d

  • r the applicabd'dty of this d d -.:= charge rev

- --ceived frc= the f el ecst adjust =ent clause shall be e=c'~ dad.

Eel '/ed Psy=ent Charge:

A delmyed pa/=ent charge cf 2% cf the total ce: b3" shall be added te a 7 bd" which is =ct paid c cr before the due date sheva therecs.

r

..r-.=.,-

e r

-w c., -, - - - -

v-r.,-

.-m, -. -

,__.m,

~

Dockst No. ER76-45 City of Marshall Appendix 3-1 Page 3 cf 4 Tax Ad. dust =ent

' ' '

  • s hall ' e _* ~,. -*
  • s e ' v. " "~*.

'm' e ' '-' '..~ c _^, c.' ' '.'..=.' s ~.~. _* * -

visic s stich. levy special taxes, e=1se taxes, :L:::=e taxes, license fees er rentals against the Cc=pa=y's electric preperty, oritselectriccperaticus,ertheproductie:and/crsaleof electric energ7, to effset such special charges a=d thereby pre-vest other custc=ers frc= bei=g ec=pelled to share such 1 cal increases. 3d " e sha n also be increased to effse: a=y ne.t er increased, specific tax cr excise impesed, by any gove_. e tal antherity upc the Cc:p any8 s generatics cr sale cf electric energ.

f r t e -a -, ' *.c.. c' = " " " ~- r.*. -* ~..^

e Subject to the previsicus of the Multiple relivery scist Addest-

.. +. u.e.,.,,., s.u. ys v s-- g.-,-a

...u t.,- n. e u., -, -a -..

~

.,.ri.2. 4 v.

d. a.a.. a
e. - d.34..e.,a.,c.4... - - st...a.

. i,

o,.

..u.-,..u.e s.

b4 " d g da-a-d sha n 1: =c case be less than SC$ of the actual

.,4 u J c,.<_...

,m..)

c.-,

d es, u.s..a e...a m

? _ua

.s

. ~. - --

~.s a -...e,e a,d.,,..n

. 4.., mu. c.3., ct u-... c a /

s.4_/

,.a. e e a,.d s --

'cefers the eleck heur cf such =enth.

Ecvever, i

=c case shall the bd"' r da-a-d be. less than 6C$ ef the -=-d-cc-peak de=acd c:.eated d: ring the preced.ing E===ths er less tha: 3Cf cf the

-*'~~

cff-peak de=and created d:r' s-the.=rece?'~- 2 =cuths a

whichever is reater.

e 7cr purpe'ses cf this previsic the hcurs between 6:00 AM and 10:CO M.. v.e A. y "~.. "..? d da,,* s' * " c ~.'.' '~- e - a.

e..,r e.a.'.'. - a.. d.e.d.

"."..e hcurs betweer.10:C0 PA and 8:CO AM Mend.ay threng's F--iday a:d a3' hcurs cf Saturday, Su=d.ay, and Eclidays s" be censidered eff-peak. The te:= Ec Hday refers to.Tev Year's ray, Me=crial ray, 7= dependence Day, Iaber Day, W~t egiving ray and C'.=is"as Day.

The fc11c-# g sev paragraphs are adied to Secti:n 6 fc11c#_:g the paragraph entit1ci " Adjust =en fer pever Facter;"

Metering Ad. jus =ent:

htere service is supplisd at a =r--d-=1 voltage of==re t'a-25,CCO velts, the C,s:7 =ay elect to =casure the service at the suppl,-

voltage in which case 2% #" be ded ted, fer b3"* r ;.:rposes, fr== the de=a:d and ene.e/ =easure=ents thus sde.

T-s:sfcr=er Cwnershie:

htere service is st.pplied at a sc--d-*1 vcltage of =cre t- 25,CCO velts a:d the cus:c=er provides a" cf the necessa::f tra:sfc.-d--->

centr ="* g and pretcetive eq=ip_.e t fer all cf the service, there s'-=" be ded::ted, f.,

the capacitf charge herei: previded fer, the fc"~#ng -r-thly credit per kW cf bd"d ; da-a-d (after the 2%

deductics referred to abeve). Icr these custc ers wtere par: cf

__ _ __ _ _...,.._._.. - _... _._ _-. _ __ _ _ _ ~

Dockat No. ER76-45 City of Marshall Appendix 3-1 Page 4 of 4 1

us

_4-t

-e

-..ad de s e. t=.4 '-'-.

-'. cus'~.. -c a.a d.. _.,.a...,

'. '. e. _a d ' '.

1 s%.a.in he %aeeA c 6.%e ee4-4

~.er.~n. eA de*.s - A. (a.e.e

~.% a.

-d,o e.

c de A..'. * -.-..#e.. A '.., a'.e.e) craa'.ed d~'.'.'=....-..'-'.--k 1

custc=er-c :ed ee.ni =ent.

l I

(')

  • s--um' "v c.'.'.< -*. E6,C'~O V- * *s ss 1

$.c'O

e..v'.*c. e '_ _' c

^

-,,=CC.'/a*

y 1

.a5.,.e yo.a

. s.....

,,.~.o *-ns..

. ~~

.10 per *Li "cr "' cver 5,CCO ' i 4

( 1

. 't, 6.4 i.a..S.o.14te,. CeJ e.i.J_J,... a _a.=.=.'.

s.

a,?

..s 4

...4

  • %.4 s.,,.,., 4. ee.,..

4 e

.i..cs.

e a

takes.ce..*.. a. - -a. ' ' * - ' ' - - -

  • A._' '. =.~~f :- '. a,

' - - ' ' " * - - da -'

d.a-c

  • s..'. cus,., - = - ( as d= "_* - = >.'

.'.=.r. =. '.a. ' - = ~*.-.'.5 --

.r,=~'=.

n: c'.*=. )e ' ' ' e ~- * * - = A,

. ~ ' ". ' ~. = ~ ' - ' ' c~,

" " " ' ~. -. - =. - ". ~ '.

' c d

'd.a. a.,. '. a =a===..= d.e

'-_A ' "., ' ' -. C.

,a

, s c '..' *.

'a, ' ' '

  • f

..av u,e c,u,,, e; a..a

. a..;... ~,.1....

c-.,4 -.a d,, a.re,.,. 4

~.

  • P- this pa.~ rsph is effective, a surcharge cf $CO.126/di shall u e g,, 4. s.,., g -,..a - -. c.' - =.**. s ' "c, "'.'.O '.'l

..' '.y '. ' ' ' -.,

a d-a-d.

"' parsgrz;h s'-'" he ef'ective c Ih fer the ti=e pericd frec Septa =her ~0, 1975 to the third f.a7 after the date en t.ich the m issues a crier accept'.r.g the ?rc;csed Settle =ent As es=est in.IC DCCte.

c. :-,.-

.e.

.s

,.aiC m I

~,,

4

, - -w-

.,---,,r,,

g-

-w y

,.a,

.,,,,, - - - -,,,.,. _ +,,,.

~

Dockat No. ER76-45 City of Porciand Appendix 3-1 Page 1 of 4 CHA!:GIS :.:::.CTIVI SIPNIR 30, 1975 To CC:r"?ACT FoR IIICTRIC SIRVICI EATID JAITJARY 19,1973 EI~n:.:.2r Co:rSm2RS PCWIR CC?e.crf AIo '"EI CE OF PORTIA:D (DESIGITATID CC iSi32RS PCh2R CCMPAIrf PATI SCHIDUIZ ??C I 0. 32) AS AMI:iDID BY OREIR OF THE FIDIFAL ?OWF.R CC:OiISSIO:i I:t DCCIET 270. I-7603 IATID AUGUST 30, 1974 A'O MACI IFFICTL2 JU::I 7,1973 1.

Where used is these changes, the te= "custc=er" shall be dee=ed to be interchangeable with the ters " City."

2.

I: Sectie: 6 ef the Centract, the paragraphs headed " Capacity Charge,"

"Inergy Charge," ".Mel Ces Adjust =ent Charge," ":tind=u= Charge,"

" Delayed Pay =e=0 Charge " " rete:- inatic of 31d g te=and," and " Tan Clause," are deleted and the folleving nev paragraphs are substituted is their place:

c.

.OAM.-

The custe=er agrees to pay for such electric energy delivered to it hereunder is accordance with the follcw-in.g ste, to wit:

Monthly Este:

L:pacity Charge:

$6.00 :er kW for the first 2,200 kW cf 31 g De=azd k.80 per kW for the ser: 7,8Co kW cf 3' c te=and 3.95 per kW for the next 10,c00 kW of se g re=acd 3.ko per kW for the =ex: 15,0C0 kW cf 31"* :s re=and 3.10 per kW fer all over 35,0C0 kW of 31"* r re=and Energy Charge:

1.60d per kM: for all kh=

- i Fuel Cost Adjustment Charre l

The fuel cost adjust =ent, deter =ined =c=thly to the nearest cue-thousandth of cae =111 per kilevattheur is accordance vith the for=ula set forth belev, shall be ayplied to all kilevattheure supplied during the bd g = cath:

v v

'e "b

Tetal Syste: Efficiency A=S S

Isti:sted Wcelesale Syste Ifficiency X

3 3

4

,,__m-

D ekst No. ER76-45 City of Foreland Appsndix 5-1 Page 2 of 4 Fuel Cost A4use=ent Charge (Cc:tinue:i)

  • ~ ere A = Ad'ust=ent facter is cents per kilevattheur to be a

s applied to each kilevattheur supplied under this rate sched=1s.

? = The ecsts of fessil and nuclear fuel burned in the base (b) and current (c) periods shall be as define:i in Acccusts 151 and 513 ef the Unifer: Systa= cf Acccuses.

puel costs (?) shall inclu:ie: (1) the weighte:i average delivered ces of all fuel I

bur:eti at the Cc=pa=y's electric generating plants, plus (2) the feel costs associated with energy pu chase:i c any basis other than an ecenc=ic dispatch as centained in (3) belev, plus (3) the set energ/ cost of energy pechases exc'"eive of capacity or hd r%= ges when such e= erg,/ is prehaseti c an ecc:=ic dispatch basis, less (h) the ecst of feel recovere:i thrcugh inter-syste: sales including the fcel costs related to energy sold c an ecc==ic dispatch basis.

S = All MT sales in the base (b) and the c= est (c) perieds.

Such sales shall be: (1) syste generatics, plus (2) prehaseti pcVer, plus (3) intercha=ge pcVer-in, less (4) energy for y=p ag d

asscciated with the y= ped stcrase cperatics, less (5) intere'-a se power-cut, and less (6) systes losses.

b.

3ase fuel ecst of 1.5157f per W ' m atthc=

=

S b

To sy=chronice the cost i=currence and the bd"d g acus::ent u=:ler this earsg at.h bd"d-e. =:ler this paragraph.r'" be based pre'd da-s arily c the bd"d r = cath's sales -'tiplied by the aQuscent as dete d e:1 abcve frc= the secc d preceding =c:th.

This b'"d g v4 "

be subsequently cer seteti by the dcHar a=cu=

ever c- ~~da-acilected free the actual feel cost a4ust=ent for the bd"d g =c:th.

Such correctics vd" be =ade to the secced bd"d g =enth fc11cring the zre'd-d ary b4 ' d-e.

Y*-* u= Charge:

The capacity ekarge included in the rate applied to the capacity reservatic: in effect. For deter-d d g the applicabd'dty cf this H a d --- charge revenue received frc= the fael cost ayust=ent clause shan be exc'-d=:1.

i Delsyed Pay =ent Charge:

A de12jed pay =ent charge cf Ef, of the total set bd" shall be adde:i to a=y bd " which is =ct paid c: cr befere the due date shown therecs.

3

~ ~ ~

~~~

Dockst No. ER76-45 City of Portland Appsndix 3-1 Page 3 of 4 Tax A4ust=e=t 4

ma i ls shall b e d ---a a s ed. v_d d -_ m" a ' d - d '..- c ' c-.'d.'..d.a.= _' _e "di-visic=s w"ich levy special tares, excise taxes, inc=e ta:ces, license fees er rentals against the C=pany's ele-tric pre;erty, eritselectricc;eratics,ertheproducticsandfersalecf electric energy, to cffset such special charges and thereby pre-vent other cus =ers f.-

bei=g c=pened te share such heal increases. Sills shall aisc be increased te effse: a=y new cr i= creased specific ta= cr excise i=;csed by any geve~= ental authoritf upc: the Cc::p any's generatica er sale cf electric energf.

Dete. d-sti= cf 341'd ? De-**d Subject tc the provisi=s cf the Multiple relivery point A4ust-

=ent behv, the bd "d g da-a-d for each =c th s"" Se the -wd

.:=

da-*-d at each delive:; pein fer such==th, provided that the.

.r b d " d r d- -* -d sW" d-c case be less t'-'- SC% cf the actual

-*w = W-volta = pere (%7A) d----i es.ablished d=.r.':g a:7 thircy-

-d ute peried fclk vi=g the eb ck her: er a:7 thirty d uce peried before the ciech hc= cf such===th.

Eevever, in no case shall the bd"d g da-=-d be less the 60% cf the -wd--

cc-peak de-*-d created d=d:g the precedi:g 11==ths er less than 3Cf cf the

-M = cff-pee.k d-*-d created dri=g the prece#' c H =c-ths, whichever is greater.

yer pur;cses of this previsica the hers between 8:00 AM a d 10:00 FA Menday threugh Friday shall ec=stituce the en-;eak peried. The hers betwee::.10:C0 M a=d 8:00 AM M= day threr.sh n-iisy and an hcurs cf Sat = day, Sunday, and Eclidays shall be censidered eff-peak. The te= Ecliday.efers to Hey Year's Day, Me=crial ray, Independence Day, laber Day, Thanksgiving ray and Chris' as Day.

The fellcwi=g nev parag sphs are added to Sectic: 6 fc11cvi=g the paragraph entitled "A4 st=ent fer pcwer Facter:"

Metering A 4 usc=ent:

lihere service is supplied at a sc- '-*1 voltage cf =cre than 25,0C0 velts, the Cc=cacy =sy elect to =cas=e the service at the s :pp4 voltage in which case 2% wd" be deducted, fer bd"d g ;= poses, frc= the d-*~d and energy =easre=ents thus =ade.

Transfe mer Cw=ershiJ:

tihere service is s=pplied at a

=c-d al vcitage of =cre t' - 26000 volts a d the cust =er prer. des n' cf the necessar~i t:1:sfc 4 5, l

cc=tre'74.g *** precective equi;=ent fer all cf the service, there shall be deducted fr= the capacity charge herein provided for, the

.'c.M~,.d.

..~ %

c A

  • t.er kW c' b d V d-= d=-'a' (after the 2%

i 2

deductics refarred to abcVe). Fcr these custe=ers where parc cf

_ +. - -

--~

Dsckst No. ER76-45 City of Porticnd Appendix B-1 Page 4 of 4 their 1 cad is serted thrcush custe=er-owned erd;=ent, the credit shall be based c the

-~d

= integrated da-a-4 (after the 25 deductics referred to above) created d=#. g the = cath through such castc=er-cwned erd;=ent.

(1) Supply Voltage h6,CCO Volts or Mss

$.60 per Mi for the first 1,5CO Mi

.25 per MT for the next 3,5C0 Mi

.10 per Mi fer =" cver. 5,CCO Mi Multi:le Deliver / Pcht Ad.just=ent h a=y =cuth in stich this para raph is effective, Sten the custc=er takes sertice at =cre than three delivery points, the bd"d g da-a-ds cf such custc=er (as d="d-ad da the Deter-d"atic: cf 3d"d g De=and above) shall be ec=bined, thrcugh aritb=etical su=s, withcut regard to coincidence, in a =arner dete d ed by the Cc=;a=y, so that bd"e vd " be calcul ted and rendered for three ec=bined deliver / peints.

~@d'e this parag aph is effective, a surcharge of $00.06/M7 shall be applied to a

---d

.:= cf the first 2,200 Mi cf sc=th2:y bdMd g da-a-d.

Sis'parag aph s%" be effective c=17 for the ti=e period frec Septe=ber 30, 1975 to the thi-d day a'ter the date c: which the ?C issues an order accepting the Preposed Sett'a-a-t Agree =ent in.3C Decket Nc. I376 45.

e f

l l

I

~ - -

,..,,, ~. - -.

m,....

I City of S t. Louis Appcndix B-1 Paga 1 of 4 1

CEANGIS : : CTIVE ::: cEER 30, 1975 TO CCITIFACT FOR ILECTRIC SERVICE DATD OCTOEIR 7,1966 RzrWIEN CONsv:cRS PcWIR CO:GAN? AND TEE 3

CITY OF ST. ICUIS (DISIG:!ATID COITS*JMERS PCWER CC:GANf FATE SCFEDUIZ ??C No.17), AS A' ENDED BY OEDIR OF THE IIDERAL POWER COMMISSION l

IN DCCKET NO. I-7803 DATID AUGUST 30, 1974 AND MADE :s CTI73 JUNE 7,1973, AND BY PRIOR AT. :.:CIE CS 1

l 1

l 1.

M:ere used in these changes, the te= "custccer" shall be dee=ed to be interchangeable with the te= " City."

2.

In Sectic: 6 of the Cc= tract, the paragraphs headed " Capacity Charge,"

" Energy Charge," "?ttel Cost Adjust =ent Charge," " Mini== Charge,"

" Delayed Pay =ent Charge," "Dete=inatic: cf 311'd g De:and," and " Tax Clause," are deleted and the folleving new paragraphs are substituted in their place:

6.

PATE:

The custe=er agrees to pay for such electric energy delivered to it here= der in acccedance with the folicwing rate, to wit:

Mc=thly Este:

Capacity Charge:

$6,00 per kW for the first 2,200 kW of Ei'id g De=and k.80 per kW for the next 7,8CO kW cf 31* r De=acd 3.95 per kW for the next 10,000 kW of 31* g De=acd 3.40 per kW fer the next 15,c00 kW of 311 :g De=and 3.10 per kW for all ever 35,0c0 kW of 31'id De=acd Energy Charge:

1.60d per kWh for all kWh Fuel Cost Adjust =ent Charge The fuel cost adjust =ent, dete.

  • ed =c=thly to the nearest one-theusandth of c e =111 per kilowattheur in accordance with the fe=ula set forth below, shall be applied to all kilevattheurs supplied duri=g the bd'1' g =cuth:

I r

v

'c

'b Tetal Syste Efficiency A=S

.C S

3 3

Esti=ated Wholesale Syste= Ifficiency

-s-

--g

,r-

,,-m,-,-

u,a

--,--,--,--,--,-ew---rv-----,--

-e-. -,, -.,.

~

1/3CKGS 30. O.4 t h-O City of S:. Louis Apps= dix 3-1 Page 2 of 4

.d e3. C,S*,,a.4,J S

.. Ch _... C. J.. e,-

2

. ;t

. n.,a,J,...

... #. a *.,.- #.. C *.=.'.., e - k#.' -v=. ~'.-"

  • .,a., **
n. e a.

4 a

-a -..

S"y * *#

SS*..*.'~"*.*S*.*'**"".".*~y#*# ""#.*.."

'.' #_3 "S*.t 3*"*#"'*

y

.w y -.

_. ~.

a.6.t C S*a. C.e e.33.i S.a

.i..

a.

7 s..

.; _J *s.

sSa. ('s. ')

v.

J C.*.*..****.*.

( C ') ". t.*# ^ # '.

S'1-

e SS #*#_#"t

_#" aC ""*.* *.S '.O 4 #

2 3, 'e 2

1

.s.e I Je.

w.fS.

C.r..

_...S.

.d

1. C..,

e

( :.* Ssa_i s

)

~..

nw.

(' 1 ')

w...t w..a.

E...*2 -.

J 1.. J.

J e.

.a. 14...

A..S *. C. & _i s.a. a e

.. a gA g*

.b.

[

,..*tg

._1..,..J. o.

..,.J le..g,

. b (* ** '4)

.......e y - - _.

s 2

  • b.
e.. 1..,..e.. g.g.. g.4 g *i.g A 4
  • .%.. g.

.w u

ggg.e.J g=.y"ggJ,

~.... w

.4.

..g

2. -

w C *.' t.* *.' a= E; c '.' ~ '_~# ".

.# # *""&* *b S S *. *".* *.1 " e #.

p ' *. *..' * *.*, '"1".3 D) y y

(*3) a.bg g*,. g -** c.o g*. C.* g. e.v =. "=^_b e g. e.._* al"3J */g a.*.,*gq #.*.*g*

es

...a 2

w.

C." A*'-**#

w

'"***-a* ~ ' '. * * * ****

t*.*.*.*"o"**g*

  1. .'. "y"'" Ea* * # ~-

E**. e ~ ~- _~# ^

e a.

..~

A J.S*:4*. h. s.gS S, 7

c. e. {g) k.,.

C S~.

4

.1

-.,*.*

  • g.=e. a
  • b =

-b J = '. g =.

^*

w

.- e SE.1.S _ 1o J J

,.s.. a... t J

S*g*S. e

..S..

,._1,.S..... _ e,_12 C 4

-a

... es..

g, g J.

AJ.c...%. sgg.a.

J

- ya.

S = a'.'.'

%~.~. Sz_' *.* # ~ ~. '. *. '.~ nS o ('% )' 1:#. "...* C" ~. = ".

('O. ) 2...~ ~is.

~* *

(D '

.=.gg e....=g*.J

, =.la,3

(. )

-a,=.'. gg g 4

.Cu-b g,{.g.,

  • 7. s. o..

g._

M g

) ag a.

2 y - --

c..t,,,1..,3 y.o) _4.t w.

.g..J

-g

( M}.-

o.f =e.

~ ~ J-.

1 a

y..

-.s

~~~-

J J--s E S S.*.*..#.".~. e #

Sa*

,O)

  1. "'.t'"~"*"**

1

- C S*..*'"*e~e C"2'..'"

2.,

y m.

-s SC*n't*-C;*.*, S;;*.. tSS {C) S*fGt' 3C53tS.

v s.

/,.S e.e..,.7 C.$.

e.i. s 5 4 p,e

,J 1,....s m

c S

k.

ew S*g*.*..k J.. *s. C,.J....

a a.

w. sJ71J e t.a,J.,3 t

.. a.

.s J 3 &, _ we., s. 4 71 J.,,

.t A.s J,.S

.L

s.._. w.

..J

  • 1

.a a

% e.,ta

.-._7J J.

s, y

2 w

l g., J 7 g.. g.

. g 1 J n J.,,,.~.~ s. t3 Sa1

  • 3 *-* ' *. * 'y ' ' *# 'o'g* *i.k *- EQ *.S '%**' *. aa-
  • w
  • C
  • E._J

. A k

E e.e

.e

.k.

S t._. J.,--.e..AJ 8% J.3 s. J *t 1 J.. ??

a ww e S* w S e,g..

  • 1.

~. ~. e.

s. y a.se C,it, g==

a.

77...e.a

.. s

. w...

e_

  • u.t E ~.,1

.a 1

-aJ

. S*- L.y..S_

.e

.b.. s. J 7 ? J.... s..

.e.

w.

C.

J.

..J 11 s.81,2...*b..

3e,..a J7*J

.e, _19~.4

..b w...

.b

.... - =

a.

e..

1J J g

.s.J7iJ f..

.g sgJ., J

.e..

8"".k.g ge,,,gg4.*.w

_e. J..inA.A J-

  • b..

e..g g M.2. J 4 6.w.

r.. e _.
  • b..... g e.g J '.g*

. g 2

2

.St

.g.J.

J g.ee". *.. ~ ' ' ".

  • C*. *.4.~- # "" # ** , "*

E*r"y"#_# '* * * # ' # '*g* C.# 'w' # e e

- ~~.

m

- J -J-

.%,.. e.

.,.gg.. g e. J..g.a.e..

  • ..k.

.a.. i C.".* *. &.#y#** S'.'

  • ".~. C ' ' "",

S'"* "_ h6 22C'"*d.

v

.1

.e..,ie4

>.., ~..-. Cs., _. v..

A. g.7., Ag y,=g..

.bg eg Ce *L.

...,1...

%.J7*

g..,71 s.. g_,t a A

-_o.

C it f

.w.

sJ77..b.J ob. J J.a C

% e.#.

. b..

2*.

4, *. 8 S

.=. *.b S..,.

b

.C

.w n..

.e

---,-,,s,


e-

-r

-,.r

- - - + + +

e.-.-

---w,*

w,e v,

,,,,e-~

,,-,,e-

,,, - ~, - - -

- - ^

Dockot No. ER76-45 City of St. Louis Appandix B-1 Page 3 of 4 Tax Ad.just=ent

-N " e s'an be d-

- =ased e ---.. -'.s c.',c'e'd e su5.di-visicus eich levy special tanes, excise tanes, inc=e tanes, license fees er rentals against the Cc=pany's electric p,erty, eritselectricc; era:icas,ertheprein:ticsand/crsalecf electric energy, to effset such pecial charges asi thereb; pre-ve=0 cther cust=ers "rc= being cc=pe"ad to share such 1: cal incree.ses. 34 " e shall also be d---a= sed to ef' set a=y new c i= reased specific tan er excise i=pesci by a:, gove..__ ental authorit/ upc the Cc::pa=y's gene-stics or sale of electric energy.

Deter d stics of I'"*

g Le=and t

St.s de + *c *we

. a 4w e *w s_.

c...l.u3 4_;_3. - c 4.t.

/.

4..

m 4.AJ,.s.-

A o

e i

.... w..,e.s.y, -w.b4"'-. d-- d._."c. e *.'.....". s'. _* _" c e '.k a -* -d de=a:d at each delive / peint fer such = cath, previded that the bd "

  • r de*-> shall 1: =c case be less t'*~ 80% of the actual

-M

.:= Wevcita= pere (h7A) de=and established dring a=y thir:/-

-d ute peried 'ciled. g the clock hcur er any thirty d uce peried before the c1cch hc= cf such =cuth. Ecwever, in ne case si'" the bdUd g d-ed be less t5 e 6C5 cf the -* d----

c -peak de-e d created dr ing the preceed g 11 =c hs or le::s t'*

30% cf the

- & - ~. c"_* _reak d-*_4 cr=..=.' e d c~ ~..'., ~..'.=. f.~=. c ed * -

~

W ichever is greater.

For r.::;cses cf this previsic the hers between 8:C0 K4 and 10:00 24 Menday threugh Friday s'*" c=stitute the c,cesh period.

f:' e hcurs betweer. 10:00 24 and 8:00 24 Menday through Friday and all hcurs of Saturday, Sunday, and Eclidays shall be c=sidered eff-peak. The ter= Ecliday refers to New Year's Day, Me=crial ray, Z depe=dence Day, Licer Day, " a-Wgiving ray and Ch-ist=ss Day.

The folleving nev parag-aphs are added to sectics 6 folleving the parag aph entitled "Adjus*ccent for ;cver Facter:"

Metering Ad. inst =ent:*

Where service is supplied at a :

4-*' voltage cf =cre t' " 25,CCO volts, the Cc=pany =ay elect to =easce the service at the su;;17 voltage in which case 2% #U be dedneted, for bd"d g purposes, frc= the de e_d_ s.nd energy =easc e - ts thus =ade.

T a:sfc =er C4:e shia:

Where ser.-ice is supplied at a sc 4- ' voltage of =cre than 25,000 volts and the cust=er provides all cf the necessary tra:sfer # 3, c= re"' r and protective equi;=e : fcr =" cf the service, there s5 = " be dedneted fr= the capacit/ charge herein pre.dded ~fer, the folleving ~~ thly credit per kW of bd"d d-*-d (after the 2%

deductics refered to above). Fer these cust=ers where pare cf

-y vwyye.-,--

--.-s

-v-wo-%y-,

- = =

v-n-

, e

,er-

.r r-,

m--e-----+-.w m

v-r

-,--w

Dockse No. ER76-45 Ciey of Se. Louis Appandi.x B-1 Page 4 of 4 their lead is serted thrcugh custe=er-ested equi;=ent, the credit shall be based en the md := integrated. da-*-d (after the 2%

dednetic: refer ed to above) created during the = cath thrcugh such custc=er-ev=ed eculp=ent.

(1) St=: ply Voltage M,0C0 volts or I.ess

$.60 per W for the first 1,500 W

.25 per W fcr the nex; 3,5CC W

.10 per W fcr =' over 5,CCO W bMitiple Deliver / Pei=t Ad.just=ent 7.

a=y = cath in P ich this parsgraph is effective, e e: the custc=er takes ser rice at =cre than three deliver / points, the bd'd g da-a-ds of sneh custc=er (as da'd-ad da the Deter-d atic: cf 3d "d.g Da-a-d abcve) shall be ec=bined, threugh arith =etical su=s, withect regard to coi= idence, d.2 a -=- er deter-d ed by the Cc=pany, so that bd"e V" be calculated a-d rendered for three ec=binef. deliver / points.

P d'e this paragraph is effective, a surcharge of $O0.06/W sha22.

be applied to a ~' d =. of the first 2,200 W cf =c th17 bd"d g dea-d.

This paragraph shall be effective c:'y fer thi ti=e peric<i fr:m Septe=ber 30, 1975 to the taire. day after the f. ate c e ich the ??C issues as crder acceptics the preposed settle =e=t Ag te=e=t in ??C Decket L*o. IPl76 45 l

3.... - -.

Dscket No. ER76-45 City of Bay City Appsndix B-2 Page 1 of 1 CliA!!GES EFFF4TIVE JA:it:ARY 1,1976 TO CC:CFACT FOR IIIC'"RIC SERVICE DATED IT3RUARY 13',1967 3E3lEZ:I CC:!SU:EFS PCIER CC GA?P? AITD THE CITY OF 2AY CITY-(DESIG:iATED CO TSU?EFS FC:ER CO GAIT? FATE SCEDUIZ FFC Ifo.1), AS MEIDED SETTE:EER 30, 1975, 3Y OEDER OF TE FIDEFAL FCHER CC:CESSIO t IT DOCIGT tro. E-7803 DATID AtJGUST 30, 1974 A'iD MADE us:.ETIVE JUE 7,1973, mfd BY FRIOR REE!E:CS 1.

  • cere used in chece changes, the ter= "custc=er" shall be dee=ed to a

be interchangeable with the ter= " City."

2.

In Section 6 of the Centract, the paragraph headed " Capacity Charge" is deleted and the follevi.g nev paragraph is substituted in its place:

6.

FATI:

The custe=er agrees to pay for such electric energy delivered to it heret:nder in acccrdance with the folleving race, to vit:

Monthly Eate:

Capacity Charge:

$5.80 per kw fer the first 2,200 k: er Eilling renand k.65 per kW fer the nex; 7,8Co kw of Si'4.g re=and 3.80 per kw for the next lo,CCo k:t of 3111dr.s Demand 3.30 per kw for the nex: 15,000 kW c' me n d g De=and 3.00 per kW for all cver 35,000 kW of sin < g De=and 6

e

,,-..r.,

.k,

+

Dickot No. ER76

  • V111cg3 of Ch21ssa App:ndix B-2 Page 1 of 1 CIIA2.UES ET/ ECTR /E JAimiRY 1,1976 To CCITfFACT FOR IIICTRIC SERVICE DATED SEPTC 3ER 17, 1965 BEMEif CCI!SGERS PC ER CC: GAIT' A:D T.'2 l

VILIAGE OF CICIJ7A (DESIO iATO CO?.':IIICRS FC ER CCtGAITI FATE SCIEOUII FFC ito. 9), AS M2 TIDED SEPTE:3ER 30,1975, BY ORDER OF T!C FEDEPAL PC IER CC:eCSSICII ET DCC}27 !!o. E-7803 CATED AUGUST 30,1974 A:0 14ADE EITICTr/E JimE 7,1973, A :D BY FRIOR m.E:cEIrrS 1.

W.ere used in these changes, the tem "custe=er" shall be deened to be interchangeable with the tem "Villsge."

2.

In Section 6 of,the Centract, the parapsph headed " Capacity Charge" is deleted and the folicwing nev paragraph is substituted in its place:

6.

FATE:

The custener a p ees to pay for such electric energy delivered to it ha-~

d-- in accordance with the felleving rate, to vit:

14cathly F.ata:

Capacity Charge:

$5.80 per k:1 fer the first 2,2C0 k:1 er 31"* :g re=and 14.65 per k!T for the next 7,600 h:1 cf 31 g Ce:and 3.80 per k:1 for the ne.v.10,C00 k:1 of Eilli.g re=and 3 30 per k:1 for the nex: 15,000 k:1 of 31111:g re=and 3.00 per k:1 for all over 35,0C0 k:1 ef sim :s re=and S

-e w--,-

,-y

-c

,-~ -

,-r

Dockae Nn. ER76-45 City of Ecrbor Springs Appcndix 3-2 Page 1 of 1 CHA!iGES Z:::CTr/E JA!!UARY 1,1976 TO CCICFACT FCR IIECTRIC,SER'CCE EATED SEFIEGER 22, 1965 EE iiEE:t Cc:tSucRS PC;;ER CC:sA:ry A:o THE CITY OF HAE30R S?RE:GS (DESIG:iA"ED CC:!S*CERS FCiiER CCIGA IY FATE SCF20U:2 ??C ITO. 5), AS A:G DED st.nr;EER 30, 1975, 3Y ORDER OF OFI IIDEFAL PCWER CC:CESSIC:T ET DCCKET ITO. E-7803 DATED AUGUST 30, 197h AID MADE I ::.CTTE JUIG 7,1973, A O 3Y ?RICR A 2:iE E:CS

  • tere used in these changes, the te= "cus c=er" shall be. dee=ed to 1.

n be interchangesble with the te= "Ci:*/."

2.

In Section 6 of the Centract, the paragraph headed " Capacity Charge" is deleted and the follevi.g nev paragraph is substituted in its pisce:

6.

FATE:

The custc=er agrees to pay fer such electric energy delitered to it hereunder is accordance vi h the fel.leving rate, to uj.t:

Monthly Eate:

Capacity Charge:

$5.80 per kW fer the firs: 2,200 kit er sii'e g ce=ced 4.65 per kW for the nex: 7,6CO kit of sit'd.g te=and 3.80 per hit ter the nex: 10,cCo kit or Billing re=and 3 30 per kw rer the nex: 15,CCO ka of 51111:s re=and

.3.co per kw rc all eter 35,CCo kW ce 31'14.g re=acd e

I 4

+n-,

- - - - - ~

D:ckat No. ER76-45 City cf Fotoskcy Appendix 3-2 Page 1 of 1 CHA!!GIS ::::CTr/I JA'lilARY 1,1976 TO CCIITFACT FCR IIZCTRIC SIRVICI EATID AFRIL 11, 1975 EIT.IEIN CO'GCERS FC'iER CCIGA:.~f AIiD THE CIN OF PETCS:Cf (DESIG::ATID COIGC GES e'C'.iER FATI SCHICULI ??C :lo. LO)

AS A.'E:CID SI?;TGIR 30, 1975 4

1.

ihere used in these changes, the te
; : "cu:tc=er" shall be dee=ed to be interchangeable with the te= " City."

2.

In Sectier. 6 of the Centract, the paragraph headed " Capacity Charge" is deleted and the folleving nev paragraph is substituted in its place:

6.

m.

e The custe=er agrees to pay for such electric energ/ delivered to it hereunder in accordance with the fellering rate, te vit:

Month 1/ Rate:

Capacity Cha: ge:

$5.80 per k:i fer the first 2,0C0 k*i of 31"'.g De=and 4.65 per W for the nex: 7,500 kit of 31*.s Ce:and 3.80 per kii for the next 10,CCO k:T ef Billing De=and 3.30 per k:I for the nex: 15,Cc0 k:1 er 31111.s re=and 3.00 per W for all ever 35,CCO k:t of 31"*.s re=and 1

e

,,r

-yv-----t

, w 7

Dsckct No. ER76-45 1

Scuchtactarn Michigen Rural Elsetric Cocporativ 2 Inc.

Appendix 3-2 i

Page 1 of 1 CHA!!GES E!TECTIVE JA:.TAE*/ 1, 1976 70 CCIT;!ACT FOR EI.ECTRIC SERVICE EATED !.'AY 21,1967 3EDE2:i CO:E'I25 PCUIR CC!?A:Tf A!!D SCU""z-. S s:.u.,.1..n..A.!.>r n+u.*.v.RaC CCC::.s a..,1:.,

u

.s. z.a a.a.

a (u. SIG44ieD CC -,

n-PO.-.2"1 CC*..., rA a w,- U.

,. 0.

.,2 ),

... ~ ~

.w.. o az

..:n.a.

e.:. 4.,

A.s c

AS AMII.TED d.:nr.:3ER 30,1975. 3Y CRDER 07 T:2.CEPAL PCh7.R CC:04ISS!CN ET LCC'.CT IIO. E-7803 CATD i

A. US. :.0,

_3 9 m. A.D.,u,,,.:.

.v w

.a.

JULT 7, 7 97."J, A.tD.t3V..:.D **r*.D. n* _** *.*.'?..*.*."'*o**

.4.

In Sectica 6 ef the Centract, the par:g aph headed " Capacity Charge" is deleted an'. the fellevi:s nev par: graph is substituted in its place:

6.

a..

'he custe er agrees : pay for such electric energy delivere'

.o <. u,,......a.a.

<. 1,....a.1. e. ya.. u.. u..,.,.,_n_...a...,.,,. o..a...

... ~.

Menthly Rate:

Capacity Charge:

$5.60 per Mi fer the first 2,2C0 MI of 31.s Ee:acd h.65 per ti for the next 7,6CO Mt of 3 m *.g re=ned 3.50 3.. <g.;.

s.

....n.. zo. e.eo <.st c *.=.'.' ' ' % e=a..'.

s a. :o,e v r.e,.

15, "^ k.'.f c ' : *." ' - ;. e..-..'

3.Co per ti fer all cver 35,CCO ti cf si"<

e=acd 4

e

D:ckac ER76-45 Alpcna Powar Company Appendix 3-2 Page 1 of 1 CHA MES ENTIVE JA: airy 1,1976 TO Co:r: PACT Fca EIICTa:C SIRVIcz EATED JtETE 27, 1966 EET;G CCI:3UI.EES FC:ER CC:GA:Tl AITD AI22!:A P0iER CC:GAITY (DESIGI*aT2D C0!!SinEES P0iER CC:GA:rt FATE SCIEDUIZ FPC I!O.13), As m2trDID SIP:reza 30, 1975, 3Y ORD a Cr TE FEDEFAL ?C%ER CC:04ISSIC t III ECCICT !!O. E-7803 rATID AUGUST 30, 1974 AIrD !aDE I??ICTr/E JUIE 7,1973 AIID BY PRICR A CC 2: TIS e

In Secticn 6 of the Centract, the paragraph headed " Capacity Charge" is deleted and the fcileving nev paragraph is substituted in its place:

6.

FATE:

The custe=er a.rees to pay fer such elec:ric energy delivered to it hereunder in accordance with the folleving rate, to Wi :

Menthly Este:.

Capacity Charge:

$5.80 per k!i for the first 2,200 k:T cf 31 :g Ce=and 4.65 per k'J for the nent 7,600 k'i of 31.; te=and 3.80 per k:1 fer the nen 10,CCO k:t of 24<

remand 3.30 per k;f for the nen 15,000 ki of 311'd De and 3.00 per k:1 for all over 35,CCo k:1 cf 31n 4.; re=and

-4 b

.,%,-r+

,.-ww-g w

-,. 4 v

Drckat No. ER76-45 City of Coldwat0r App 3ndix B-2 Page 1 of 1 CHAIiGES E:::.CTr/E JA::UARY 1,1976 TO CCNT?ACT FOR EIECTRIC SER'/ ICE DATED E3FrARY l!+,1972 3ETEEN CO:iSU:GES IC'JER CC:GAITI AND THE CIrf OF COLOWATER (DESIGNATED CC:SU:EES ?CWER CC!GA Tl FATE SCHEDUIZ FPC UO. 29), AS A: ENDED SE?II:GER 30,'1975, 3Y ORDER OF THE.'IIEFAL PC' DER CC:?iISSIO:T I:T DOCKET no. E-7803 EATED AUGUST 30,1974 AND FADE :mCTr/E m:E 7,1973 1.

Where used i= these. changes, the te = "custc=er" shall be dee=ed to be interchangeable with the te= " City."

2.

In Sectic: 6 cf the Cc= tract, the paragraph headed "Capacit'/ Charge" is deleted and the felleving nev paragraph is substituted in its place:

6.

FATE:

The custe=er agrees to pay for such electric ener;;,r delivered acccrdance with the felleving rate, to vit:

to it here" da-3-

Menthly Eate:

Capacity Charge:

$5.60 per MI for the first 2,200 EI of si1'd.g te=and h.65 per ET for the next 7,800 Mi of Eii'*.g te=and 3.60 per Er for the nex: 10,CCo '.<t of 31111 's re=and 3.30 per W for the nex 15,CCo w of Billing De=and 3.00 per W for all ever 35,CCo u of 31111.g re=and e

O l

e e

9 e

-y

+ --

-w-.-

m

Deckot No. ER76-45 City of Hillsdelo Aconndix B-2 Page 1 of I CHA GES EHECOTE JATARY 1,1976 TO CC?CFACT FOR EI.IC*RIC SERVICE DATED SEFrrGER 13, 1967 EET;iEEIT CCIISCEFS ?C1iER CClGMTf AID TE CITY OF HILI.SEALE (DESIGITATED CCIISUEFS PC',lER CC:GATI PATE SCEEUI.I ??C !!O. 6), AS AEIGED SE?rE:GER 30, 1975, 3Y CRDER OF TE EDZ?AL PC;iER CC:MSSION ET DOCKET I;0. E-7803 rA ED AUGUST 30, 1974 AITD MADE :: CTr/E JU:iE 7, ~ 373, A:iD BY ?RICR A CCE iTS

  • tere used in these changes, the te= "custc=er" shall be dee=ed to 1.

a be interchangeable with the ta= " City."

2.

In Secticn 6 of the Centract, the paragraph headed " Capacity Charge" is deleted and the fellevi.g new paragraph is substituted in its place:

6.

FATE:

The cus:c=er agrees to pay for such electric energy delivered to it hereunder in accordance with the foll:ving rate, to vit:

Menthly Kate:

Capacity Charge:

$5.60 per k!i #~ h a 'd-et 2 200 k:1 of Billing re=and 4.65 per k;i for the next 7,800 k!T of Sim.g renand 3.80 per MT for the next 10,CCO k:I of 31111.s recand 3.30 per MT for the nen: 15,C00 k:1 of sin d.g re=and 3.Co per MT fer all over 35,CCO MT of sim g re=and I

L e

o O

6 s

S 9

w

,e

-w-


,=e-

+

w v

~~

Dick 3t Nos CR76-/.5 City of M rshall Appendix 3-2 Page 1 of 1 CHAIGIS 12::.CTT/I JATARY 1,1976 TO CC:iIPACT FCR IIICTRIC SIRVICE EATID AUGUST 22,1967 BE-4II:( CCITSUEFS ICUER CC:GAITf A?O THE CITY OF PA?SHALL (DISIG ASD CCUSDEFS PCWER CO:GA:rt FATE SCHE UII 7:C

0. 7), AS AMI'CID SZ?TEGER 30, 1975, BY ORDER CF THE FIDEFAL PC'4IR CCM:ESSIO:s I'T LCcKET 270. I-7803 CATID AUGUST 30, 1974 A m VADI :.:::.C: r? JUuz 7,1973, A D BY FRICR AME2!G: TIS 1.

'4here used in these changes, the ter: "cuctc=er" shall be dee=ed to be interchangeable with the te= " City."

2.

In Sectica 6 of the Centract, the paragrath' headed "Caracity Charge"

~is deleted and the following nev paragraph is substituted in its place:

6.

.-A7

~

The custc=er agrees te pay fer such electric energy delivered to it hereunder in acccrdance with the felleving rate, to vit:

Menthly Fate:

Capacity Charge:

$5.80 per kit fer the first 2,2C0 kit cf E11" g :e=and h.65 per kit for the next 7,800 kW of Billing te=snd 3.80 per kN fer the nex: 10,Cc0 kW cf Rilling re=and 3.30 per kW for the next 15,CCO kW of silli.s re=and 3.00 per kW for all over 35,0C0 kW cf 311'Mg re=and h

a

D3ckot No. ER76-45 City cf Por:ltnd Appendix B-2 Page 1 of 1 CHANGES :.t:cCTIVE JEUARY 1,1976 TO COIiTFACT FOR IIECTRIC SERVICE DATED JA CARY 19,1973 3EnlEEN CO:: Stress FCWER CC:sA:rt AND TRE CITY OF FORTIAITD (DESIGIRTED CO?tSUMERS FGiER CC4?Afff PATE SCHEEUII FE0 Ir0. 32) AS NE:iDED SI PrrGER 30, 1973, 3Y ORDER OF TFE FEDIFAL PCWER C C:ESSIO?i ri

/

ICCKET Iro. E-7803 DATED AUGUST.io,1974 A TD FADE :.::.CTIVE JERG 7,1973 1.

  • inere used in these changes, the te: : "custe=er" shall be dee=ei to be interchangeable with the te:= " City."

2.

In Sectica 6 of the Centract, the paragraph headed " Capacity Charge" is deleted and the folleving nev paragraph is substituted in its place:

6.

FrzE:

The custener agrees to pay for such electric energy delivered to it hereunder in accordance with the folleving rate, to vit:

Losthly Rate:

Capacity Charge:

$5.80 per kW fer the fir:: 2,2C0 kW of Billing re=acd 4.65 per kW for the nex 7,800 kW of Sim s De=and 3.80 per kW fer the ne=t 10,CCO kw of silling re=and 3 30 per kW for the next 15,CCO kW of 31111.s re=and 3.00 per kW for all over 35,Cc0 t'<T of Sim.g re=and O

h O

h r

,e-m-

g nm

+-w--

g 4-g

-,3 w

y

Dackat Ns. IR76-45 City of S t. Louis Appandix B-2 Page 1 of 1 CEAZIS r., ::.CTr/I JA'IUAR? 1,1976 TO CCIITFACT FOR IECTRIC SERVICI DATID CCTCSIR 7,1966 EI~dII T CCITSU:EES PCWIR CCFC3A:Tl AIID THE CITY OF ST. ICUIS (DISIO:tATID CCNSIREES ?CWIR CC:GA'iY FATI SCHIDUIZ IIC Ito.17), AS M2:TLID SI?TEGIR 30, 1975, BY CEDIR OF THE IIDIFAI. PCWIR CC:GISSION ET DCCKET No, I-7803 EATID AUGUST 30, 1974 A D MADI :. ::.CTr/I JUIE 7,1973, AND BY FRIOR ME:C:E:CS

  • tere u:ed in these changes, the term "custc=er" shall be dee=ed to 1.

n be interchangesble with the te= " City."

2.

In Section 6 of the Centract, the paragraph headed " Capacity Charge" is deleted and the fellevi.g nev paragraph is substituted in its place:

.A 6.

The custc=er a rees to pa/ for such ' electric energy delivered e

to it hereunder in accordance with the folleving rate, te vi::

Monthly Rate:

Capacity Charge:

$5.80 per kW for the first 2,200 27 of 31"<.g re=and 4.65 per Mi for the nex 7,6C0 Mi of 31"4 g re=and 3.80 per kW rer the next lo,CCO kW o' =4" ens re=and 3.30 per kW for the nex: 15,CCo tu et 31neng re=and 3.00 per kW for all over 35,CCO Mi of 31"*.g Dec.and e

e S

O e

e e

.p,-

,,_w.

..-w,,,..

2 APPEGIX C 1

l CollSul!EHS TYllEli COf1 pally

~

llholesale for Hesale Cost of Service for Settlement 1975 i

i Amount Total large Small -

Item ilholcaale 138 kV 3:6 kV Prismry Prima ry Rate Dane

$33,l:55,058

$11,298,71:3

$9,885,618

$6,651,Is81

$5,609,216 6

naturn 6 9.23%

3,086,979 1, 01:2, 8 71:

912,113.

613,932 517,731 14 4

Income Taxes 1,776,113 603,289 525,2'/7 352,196 295,381 1

Taxes Other Than Income 921,095 310,567 270,888 183,1:12 156,228 operation and >ktintenance 1

12,896,868 Is,852,213-3,517,628 2,5flo,61sla 1,91 sis,383 i

j Depreciation 1,083,102 369,061:

1 31 1,1:33 211s,530 lll5,075 Other nevenues (Credit)

(253,835)

(92,627)

(78,070)

(Isfl,3fl8)

(3fl,750) 1 Total Cost of Service for Settlement

$19,500,352 4 7,085,380

$5,Is66,599 43,896,326

$3,060,ds8

]

nevenues From Settlement nateafl)

$19,187,016

$ 7,100,680

$5,381.715

$3,937,203

$3,067,l:18 1

Revenues From Rates Prior to Filing

$15,180,385

$ 5,788,931

$l,065,35fl

$3.dsl,729

$2,281,367 i

i 38 Te I

(1)For Service From September 30, 1975 to December 31, 1975 by i

a.

fj I

M L-u.

s CollSUIERS fulER COMPAl#

Wholesale for Renale Cost of fjervlee for Settlement lW5 Annint Total large Small Item Wholesale 138 kV l6 kV Primary Primary i

Rate Base

$33,ll:5,058 411,298,7s3

$9,885,618

$6,651,181

$5,609,216 i

1 i

neturn e 9.23%

3,086,979 1, 01: 2, 8 78 912,833 613,932 517,731 16 Income Taxes 1,507,1183 511,920 tl:5,723 298,855 250,61:5 i

Taxes other Than Income 921,095 310,567 270,888

.383,I:12 156,228 operation and Maintenance 12,tWs,868 1,852,213 3,517,628 2,580,Gi 1,91Is,383 5

l DcpreelaLion 1,06.1,102 369,00s 3 11:,1:33 2.11,530

.185,075 8

other nevenues (Credit)

(253,835)

(92,627)

(7: 070)

(Infl,388)

(38,750) 3 3

Total Cost of Service for Settlement

$19,239,352

$ 6,9)i,011

$5,387,035

$3,$i2,985

$3,015.312 Revenues From Gettlement Rates (l)

$19,221,362

$ 7,007,li99

$5,301,658

$3,885,95Is

$3,023,251 5

Hevenues From Rates Prior to Filing

$15,180,385

$ 5,788,931

$1,065,358

$3,olsla,729

$2.2fil.367 8

(1) For Service Hendered From January 1,1976 to the Third Day After the Date on llhich the PIC Insues en order Accept.ing The Proposed' Settlement Agreement in FPC Docket No Ell?6 3 5.

,f[

?s 5

p. st n.

g k

CONStJllEHS ITAJER CONPAllY

~, ;

tiholesale for Renale Coat of Service for Set.tlement.

1915 Amount.

Total la rge Small Item ilholesale 138 kV 3:6 kV l'rlma ry Primary llate Dace

$33,Isl 5,058

$11,298,7:3

$9,885,618

$6,651,181

$5,609,216 3

4 noturn e 9.231, 3,086,979 1

1 1,0:2,87:

912,l:183 613,932 517,731.

Income Taxca 1,507,113 511,920 8

f liS,723 298,855 250,68:5 i

Taxca Other Than Income 921,095 310,567 110,888 183,1:12

.156,228 operation and Maintenance 3

12,898,1168 I,852,213 3,517,628 2,580,6l lii 1,fAls,383 I

Depreciation 1,083,102 369,061:

1 31 s,l:33 I

21s,530 185,075 Other Hevenues (Credit)

(253,835)

(92,627)

(7s,070)

I (l ll,388)

(38]S0) i Total Cost of Service for Settlement.

$19,239,352 4 6,998,011

$5,387,0:15

$3,81:2,985

$3,015,312 1

Revenuen From Settlement Rateo(l)

$19,238,663

$ 7,000,81:6

$5,352,635

$3,872,618

$3,012,538 1

Itevenues From Halen l'rlor t.o Filing

$15,100,385

$ S,788,931

$1s,065,358

$3,0 :3s,729

$2,281,367 1

U Ii'

'a 9-i ii. a (1) For Service Iten3ered On and Af ter the Third Day Aft.er the Date on ilhich the Fit Issues an order Cy 4

Accept.ing the Proposed Set.tlement Agreement. in Fit Docket. No Elfl6 IsS.

n-gi,M es m

$~

m 3,

6

  • ~~

9 APPD~JIX D 6

I b

u..

CONSUIERS IUTER COffPANY

^

1 Summary of ilholesale Settlement He enue Increase (For Service From Septeraber 30, 1975 to 1'cember 31,1975) i i

i Prior Rate Proposed Revenue Customer Revenno(1)

Havenim Increase Percent 138 kV Service

$ 1,386,61:5

$ 5,271,766

$ 885,121 20.2 Alpena Pouer Company 1

Edison Sault Elec Co 1,1:02,286 1,828,9116 l:26,628 30.14 Total

& 5,788,931

$ 7,100,680

$1,311,73 9 22.7 i

l6 kV Service i

Bay City

$3,o61,220

$1,109,331 1

$1,088,121 33. 2 5

i Petoskey 1,001,138 1,272,371:

268,236 26.7 8

)

Total

$ is,C65,358 75,301,7I3

$1,316,3'//

32.36 Large Primary Charlevoix 61:1,181 837,1236

$ 195,9f3 30.6 i

Colduater 958,38'(

1,207,869 1

269,182 26.0 itillsdale 758,135 1,015,058 256,623 33.8 8

liarshall 686,726 877,152 190,1:26 27.7 Total

& 3,03:3,729

$ 3,937,203

$ 692,3 736 29 3 6

6 Small Primary Chelsea 1:02,616 535,603

$ 132,957 33.0 1

Eaton Rapids fl:2,989 588,266 115,27/

32.8 i

8 liarbor Springs 325,716 132,199 1c6,1153 32.7 Portland 368,651 li99,036 130,385 35.li St. Touts 285,003 381,MS 96,52 33 9 Union City 21 6,066 338,666 92,6co 37,6 Southeastern Mich REC 129,297 179,900 50,683 39,2 y>i aMg llolverine Elec Coop 80,969 11 2 3 1, 11:15 38.5 total -

$ 2,2 8 1. N 7

$ 3,CbM,113 o

iT6

$ 786,051 33. 5 "EI 8

t*

Total ilholesale Reveti.e h5,180,385

$1,3@'{,0)6

.41,306,6 %

28.li S

f 6

  1. s'* yt (1) Rates Approved in FFC Docket No. E-7803 and.in errect until September 30, 1976 y

5 1

- - ~,

.I. I2

.d I

Iri i tide...s!1 i.

I 5:11 f t; E 3 m.

.as..

a.1.i

.aa l.a a

a e

_E I.

M,2 3A 1.3

,4 Ill,.M44,3 f.e s

3. <

A

- T:

i~

c

-c z uu= =.1 g

'l

.t.

4.

1.

s ii U] i UI I

%Illi i I.iUA159 i t.

I.I2 q1 i..] f Ii 22:r s af!!azis 1

a.

1.a

..e

.a l.a 4

a I,lc.?

S

.-l

.1 4

UJ 2 til a, s.gg s 1.ttsyza ;

2 IjL2 2;j 5, Rg (

it_ys!. a(

It3Ei!E.!.

(

_l.

l.

i

,1

'J 11! I F2i i is s.

g

?J -

at 5

ai

.~~1 s.

a

.s

=

1.j [a. It,} !,

JE 1

_,iid 3 IIf!!!!!

i,-

t i.

a:.:

27 2

.1.

l.a a

i

'b i

!!j *'

!$ 1 2K3" I

(!!!!!!!!!

1 I

S 5

L s.' y.

.-l.-

l.-

l.s.

i.~d i

.sii i.

gitisiisi

  • 2'.

--N

,1 3

.=

3 I.I$k kI5k UdIkk k!.IEI.IEU$ I. (I y

l.h.

  • 1'i t

UAt 2A45 ii.MM utii!.IV.E 5 135.,

ms e::s.- : =3:2-p. g :

e:n-

. ~.

c c

rj i -f it! !

!!! i U5.4 i U.5AtiE: 1 4

p ;f]I4 r:!!

'=l i 1

. 1:us 3 raasstsa a a

gj. c I

iti i

li i

i

=j e n

u s na rl.I

, y:-

i 'ii fi n1 p.

I-r i.

.jj!

!Ij!

m l!

ah 3s bn p.g ea e.g nJ y

r=

f'!

  • I{

(gy qhy z 3, 2

Isa2

  • 4 f-l5 gg Iw

'2 I!!!

Ei!!

E!?!::!

["{

ss\\it' ibi$

isi ~ 'i si'i-(a

(!!! I 12 1l.i(

ii i.

I2 7.

x1g i

njd 113133E3i72 i 1

,1-11m':

iiiiiii-Mi n' i t"

z l.

r.3 UIE 3I5 1UI33

3. (
=;

3xs 2

a3

=2

(,3 l.

l.

33=f 2

i ii

.t. 'u

,t

=

s It i

14 I

1 i

!I

,)

i-i 1 3 5j.l

l e j'2-j(gl

! lj#.-j:1]228]l..

.8 2I I

3 2' i i

    • e rge a

ill jj [s**

l i*gg j n * !! !sia 81 S

S has, i ni 5

5 i

. i j

MM b M

-u Pese $ ef I k

k..E...k k

g1 3ma2 ( t i:.i stu ( 32nt2sa (

[l j

I I -

11 f IS I 3515 1EIE1132 !

1

.}d iE sz] s' is i

"id=

i sa~~Ja~'a-i i

=

=

I-

]y3 $$'.i li) i.

1E 1 IE i liif 1 131!!!!!!!

i Iiff i iiiisisi i E

'l

.1 I.

ia a-a a

a 1p S! ! is ! !!3f I E!!!!!!!

1 1.i.i. l.i ag i asaaaa s

a

.i g

s P' IE I-12 ! !!!E 2 is.ttyitr 1 1

a.s n

.s (~l

.f.,.] I,- sIe.:.:; ssalfil.s a a

s; a

'.s., s.

s.

l 2

15 '

IE !

15 i 323F i !!!Est!ij1 E

if i $5 ili i)i ith i fisifism i f(

3

" i i

I.

~l

,1 it E Eii i Eli! 1 !!ii!I!E 7 i

li ti H i $$l i$ lid { iiiiiiiA i i

11 i

i i I.

i ll

!!!! 5 15 1I E $XI. i Xi I(

- I t r. *.$.

E:

tj (1.51 ti1A !!.(115, !.fi!JIAJJi 1 I, 1

-: If25 (223 $!?!32 tiditi~(215 2 1 111Js!

ff sidi nisi iiiiii

-li. i i 1

E'T 3.E 3 I.E I IElij $ Il!I.35U I.

f.

.jif i 4

i i i !!i i j

.i.]..Siegassm; 3 3

i.

4 p,

d' U

MI 4 i.

p c3 sis; a3

~11 si i

r. I. sL taA a.1 N f ee z F2 aa w

m

]

L' tu s si ra ss r r 3

YI I b

bII 1

1 L

a

[a russ sin ss 1 r 14.,. 3 diss.i i'a 1".i i i r-mP!

j!!!

21 s',5 iisi ii o:

h I. l1 E. I.

,1 8 1

f 11s t 5A tit SAS S. E E

p.i11 p.:

a,s:

s su p

24 I. II. I 1

r.s :

-~

9 J

JIIII 113 3i 3 i P'*3 iiisI iii d

't 1.i i i i

i 113 881 s.a?

g llf

=

  • J jf a

ta I

Is.l

-j q

$2 yI P: Ja il li si 11!

1. l'.. i 1-l- ))-:

1I sill 331 d

3 4

=

U-I.

n.13 sti 2

u i

11a.

-1:f:t ' u si:rli3i

.t m

gs'i au 33: " tuis innish

..j ;

ps M;41 5 5

ii EE5

.,j s:.

4 Conf 2EERS POWER COMPANY Summary of Wholesale Proposed Settlement Revenue Increase (For Service Rendered From January 1, 1976 to the Third Day After the Dat.e on IRilch t.he FPC Isnues un order Accepting The Proposed Sett1ctaent Agreement in FPC Docket No Er/6 l:5)

Prior Rate Proposed N venue Customer Revenue (1)

Revenue Increase Percent 138 kV Service Alpena Pouer Company

$1,386,63:5

$ 5,206,982

$ 820,337 18.7 8

Edison Sault Elec Co 1,1:02,286 1,800,517 398,231 28.1:

Total

$ 5,788,931 4 7,007,499

$1,218,568 21.1 16 kV Service 5

Bay City

$ 3,o61,220

$ 1,0li9,113

$ 987,893 32.3 8

Petoskey 1

1 1,008,138

' 1.255,5:5 251,1107 25.0 Total

$ is,065,3%

$ 5,3oli,@

11,239,300 30.'i T,orge Primary Charlevoix 61:1,101 826,256

$ 185,075 28.8 Colduater 958,387 1,193,317 231,930 21s. 5 I1111sdale 8

758,135 1,000,157 21:1,722 31 9 l!arshall 686,726 Total 86(3 21s 179,198 26.1 2

1

$ 3,01:3,729

$ 3,885,951:

$ 641,225 27.C 8

Small Primary Chelsea 1:02,616 528,225

$ 125,579 31.2 1

Eaton Rapids 112,989

$80,369 137,180 31.0 1

liarbor Springs 325,7 i6 1:26,152 100,1406 30.8 1

Port 1end 368,651 191,593 122,9):2 33.3 i

St. Iouis 285,003 376,110 91,107 32.0 Union City 32i6,066 333,387 87,321 35.5

  • g
  • E8 Southeast.crn Mich REC 129,297 177,195 Iq,899 37.o mUo Uo15crine Elec Coop 80,9(g 110,131 9 29,1150 36.li Total-0E

$ 2,20t,367

$ 3,023,251

$ 71:1, 8 81i 32 5

$h$

Total Uholesale Revenue

.s a

g)J,180,38g 419,pgi g gil%9R 26.6 U

k :nN (1) Rates Approved in FFC Docket No. E-7803 and in errect until September 30, 1976 1-m 5

f IE f.

j ]'a.2t.!.i.i

(

ZI!!j 1 Ei!!!ifa2 2 E'"J *. '

IE A.1 f.i!.(aI,f fiiii!!=> f i '""'

.Ij i.

4.

I.

I.,

a e

1 r*

fil f 43 4

11:4I tiH1123 !.!

,1-yi s.d g diiasi.

ai 'i~'~' f i i

1

1. s

}I kN I.

khI I.IkEk IlkIIIII! I.

I.

2'..i i

.t.s i 2

...tssl.a iss!sts='.s u

1 1 ia i.

. l.e e

l e

III i If *

!!!E E!.!!..(!!a 1i y d 1 :

.i l I 4

a

]lt sj.i

.i s

t

.v -

i..

!" {

$1' 255D i 15!!!!!?1 ! t

.i 3

.$.[ !

}ali I2

!.!(($ I filiin81 ' i 2

..e 1.a l.1 e

J iff i

.nl y

=

p-

.4 a

j a!

23 1 E5 s i

I a

ia a

.l' b I.e 5diI.,$.%

.l(N, a!

IEES.3EJJ

3.,l E

f u.- zI i.

,. s I4

!i

',f I (3] R (2*1 253.si i f.5]It'Ji 1 1 5

!!!d 1 152!E!** E i 3

it 2 g'i fli il f 11 Ii 1

4 fjj$g jp

n 113 1 I A tt.37 21:2311:n ! !
  • 3s;i '< y Yiji idi tiltii ihlH(jaii iiii$

3 Q lind iii' iiisi' iiiiii=

gi e-

+-

T3 s) r_

W..

w-III.. -

. e*Jc h. a

-- e

4 s

.S.

5 3

II,3))]14 ti i ts; i sin i

!2ntsu t.

s.

p],g,,3. Ayr_

e at i

is

-12

.s

. t.

'. P,

.f a

1

',3 e,}jit I

51 I!

ie 5 51 i

dj! Q S 5)1 ts t7 lil ES

,l at I

11 i Il 4.y gg,(

s gz

( a,.

2 L I:

2 5841
  • i II l

.ui I

I h.L Ins stu fin:t tt!!II At 13 ii i iiii niinh

=i + ' Iiii 5~t

=

i si I.

f4 i

$2 EI!I!!N5k!k

~

e:

r. :

ija 11.31 1.3.1 111121 A S.

ma un 2:

1-I-

fs at

=

Sf'.

( 'II.

1.1 i

Fri.?

    • 1
  • i I

1 It

]

il

}i d.li~ !

t!

4 I'

-5 a 31 i! j *il -]. t= 1!; 1 lfil' i 33) fun.t j191l3 i 511 i i 1 - --i i ij jI i

  • j 513r1 5h m.

5 5 E 33 ~ 1 l 1 1 i

. _. ~. .. ~, ,J i$ !. R% 2 f agl !! 15.tsrir.ij z ( 2]i di f 11 - I su t n( i:itia 33s:stsa. i li. li i il i. f f f ,J is I ssti I sstitus i e I[j= su i id i i*bi aise i Janie '--{ i i = i q=q=. g ar ! != ; taxe s asserstr i .its if i t? i tifs i itisitia i n a4 s1.e ..: s 1.e a.. a a z .-'l 323E 3l. 4!!!e!!2' 1 { p. 5.! I i.ii

  • 2

.s 13.4 nr i sca 5;sta r;ct;;sma s j]5 14 2i:.I.YJ ( tii fiffiiid( a .1 a 1j3p3 si! ! rs 5:33 g sistratsj t i 2I:ssf : (d i. fifu ( tiffilia i i al 2 l. i 2. 1 sa i su ( Et3* 1 ::255E54 ]f,3 53)I eli fitil ( i!!!idd* i i iis ici. is I. i ll 1135 5 13 II % iist iis ii T i t i :d. ii 3 s J l !!!! II.li !!!!!! 11:21!!!13 I i !s$f !$f !IIhf !!!h!!k f f 1. (2 .],/ 3.3 3 it! 1 !!!.3.3 i ti'!3.t!.!! i 2 Efx al,.it I sisq a sissa a m a i j ,.E i-1. s ,d ' U E1.II. 4 J.

s Its!

I3 Y, i 1 si i t.Ql i_ I R1 11 a. s= 11s. as u ] L' can a si st! 5; E a 1 11 u..t i

p. ti<
p. i i I

E 1 .r-. l.Ji.s 22:55 311 is 1 I di".i <-' 4.i i. 7 EU 1121 31 'S iisi ii a 2 SL 1 g.1 3I Y i.1 i l J 1.ii. 31 1

s !!!

15 s. , f's sii 'c"i i i i p 4 m d i t. v =n=1 J JJJ11 JJI F'1f I i l', .,2 iiu. t' iii iii it as 22,t 5 ~ ?, I !!g 4 1 }* j, 14 3 = a, =. f! II - n 11 12 i.t 3 jjr Iy:tl} [i f Ij"!ill $.!!}}!I'jj ! j !l!pa;t i1I j ; jj:- r}} -I I tjii n i 42sil3 ..i p-E si 31 Ji II E

.s cot!StrrERS IYIfER C014PANY ~ Summary of Wholesale Proposed Settlement Revenue Increase (For Service Rendered On and After the Third Ihy After the Date On Which the ^2PC Issuen an Order Accepting the Proposed Settlernent Agrccuent in FIU Docket No ER76 Is5) Prior Rate Proposed Revenue Customer Revenue (1L Revenue Increase Percent 138 kV Servicc Alpena Power Company $Is,386,Gis $ 5,203,655 $ 817,010 18.6 Edison Sault Elee Co 1,3:02,286 1.7f/7,191 391s,905 28.2 Total $ 5,788,931 $ 7,000,BIi6 $1,211,915 20 9 186 kV Service lhy City ~ $ 3,061,220 $1,100,1:16 $1,039,196 33.9 6 Petoskey 3 1,00s,138 1,252,219 218,081 21. 7 1 8 Total $ 4,065,358 4 5,352,639 $1,287,277 31.7 Iarge Primary charlevoix 6:1,181 822,929 $ 181,718 28.3 3 colduater 958,387 1,389,991 231,60's 1 2 s.2 liillsdale 758 ls35 9 %,831 238,3 % 31.ls t.larshall 686,726 $ 37/ia,897 862 176,171 25.7 Total $ 3,03 sis,729 / iH $ U2/,919 27.2 Small Primary Chelsea 302,G16 526,011 $ 123,995 30.8 1 Eaton Rapids 1I:2,989 578,585 135,596 30.6 Ilarbor Springs 325,7 6 3 1:23,568 98,822 30.3 1 Portland 368,651 190,009 121,358 32.9 St. Youis 285,003 371,526 89,523 31.ls %aw[ 8 Union City 216,c66 331,9336 85,868 i 13 s.9 I Southeastem~ Mich REC 129,297 176,360 117,063 36.1s 3 e 9. E Molverine Elec Coop 80,969 109,931 28,9112 35.7 oa: Yotal $ 2,281,367 $3,012,53i $ 731,167 32.0 [ip. I w t:1 Total Wholesale Revenue $15,180.385 $19,238,663 $1,058,278 26.7 { 5 (1) Rates Approved in FFC Docket No. E-7803 end in effect until september 30, 1976 l

w s o.ea.st.o,.h,3 s}l : (I t 5 8.a Mu (. assisas! i 1; .-j.- u i.- .r. r i ____1 i i.1 ( i 1 utsi 4 .i.sA4443.4 _. J: f ^ 2, 2 us c = 2 i

I

~

----

= s .I 2.0 t MR Rua i RIARA U.s E I. [2 U. t .VI 1 uti t assis552 1 5,. .1.- 1L s. .e s sies I I .~q.21i .i I i . aa a .i --t 2 2: s. -4 --a .i.i a a a u -n 2 = =, e- - 3.3. =.- 3 , =,,, E.4.4 ".w.J.A.. s -, e 2 .{ YJ.

  • *J *.

a. i1 ; U. l i Ui 41 1 515fnEE5 i 4 .i.- n ,, l =Pp! illi 15 ?- I i-a

  • a-
c<

5 ,IJ s = i .s, 2, 1 1I 2.i k: 1.t -i s.44 int S. HMMS!. 3 5 n 41 e-a =

x 3ii k'

it S is 4 4444 i (!.M. UA"" 1 1 . a' 'n. 8{ s. r.h.- 31 2 <= - .=an 1 -e it -- c..=. c u e c 4l.4 = ~ 11 4i 4 4 J J 2 i:t i.p,'j ,,u. au.. R1h-1 1 4. e I.......A 4 .. e.w s ]< 413. g 1i ,r. s s.s - as s.::s - s i 3 UXI. 495 IJUAA.. U.3155195 i I. I: ea es:s :n- ~P x =. m e. 1 .1 3 13:} te 5 -a -:: =.

gg,s y.

ill!!!8-]=R s; :r-n: - --..- 45.n.g :: 1 ]:h,2g;.E '3 n _. n 1 s 1.3 4 (:l =. Allt 1 8 =. 2 = 2 n .i 3 A S 3h .= a 3:j g 81- .:II, ~ *l fa - g 11 L. s3. R:. 2 .a s e ce ez s - t= -= [I.i. s.4+-

3. '3.2.

.R ya un n2 rt = s< 1 II .1 AIX8

8. fit E.!AU.,R f.113.11 1.E R A m.e are au

=s-s-- ,3 =a =- ..s 4 1 f D-k..k .kS. .k kkk.. F;I. 11,2'A 113A 3112'*2 '4'2 2 2 24 :* * :.,,3

e.,

8 e J ee i. l. = 2 1 9 2 h fd E It 52 EI 5 : s ] = 1. 2] s t 1 1 4 -) 2 .s a 3 } s 2 *)- 3d $23

  • 9
    • I'
  1. dg E...H '9 1

D 't ' 7 2 J:!bj32. ,a a-- it 3 LI a ;4 a :l =i -) 3= g .! j 2

-.nala

. 4. u a as u w ss

~. 84 8fI slI2 et. n.i 1211: 1. 33stizia ( i} g a m. .a I.a s. sa 4 y* ,I..J. i, --

m. k

-3..! s .---.-:c, = .h k ...I... ] *. sci a z"l s =J : i lz l la / 15 1 is i tits 1 tii!!str 1 i ]b.2 Id I..!$.i Ufd i lidiliil i i 7. .7. 1 s 4 . l.,...II3E I. i i. .IE E i.~ l, 14322.!!?' 1 la .a 2 l. l. E' 10 I til ! Ei! 2 fiitiitt I a }} &.3.Id i..-l..D} I. Ud i Is.tiidil I i .l. i l 2 Ib E'339 ! I? s Ji!!' i !!!Est!E 1 I i l =( z( [ i ii- ! Ist** i litiiii;; i i

  • h i

l. i 1 12 K it i II!E 5 !!ii!I!E ! i ]! 2 !$ 1( i.! ( U iY ( U !!!i=d i i ~ I a 21- -12 i2 i [I !!.2.E

3. (E 4 I.

.I: !El 1 li !i s.s si s s.s gy a hl $ 3.3 I. k$.l.I. .!.kI.. k. tu"i : I 2 it.rs ins !!nst 1 stu....... } aisi nigi =iiiii sinisi"i. i i l[ l 23 3 to 1 Esty ! !!!.1113.4 1 1 g, ))t: .q =. s..samta==q.s i

I !!!ij a a j i.

= 7, s l'I U titt 33 g( (2 313% IE Q 3 e la [~3} x! ( E1 I1 b;3 g 1M 11 = ] nt i Es it! sr I 2 3 3 iig i f'i die =i a.i i. 6. {[' i E 1 J !?!!! 3"i! 32 I I l'- in-":* 6*' ' 's a 7 !J J!!! !1 =;5 iisi ai m ez 1 L (i-

3. 11
3. !

a x1 sa s..h h h hhh..f. gi s. sL lW i F.( I I in ii 4 J 11313 115 37 3 i $2

  • * '.*I

[I I $ !.!.3 881 1's E 'a It II1 tt I s

$I' 1--l 3i l

~ 7 l-] as N -li

tl a. 3

}}I ...s a ,1 .i,:, 2 J1, *e i 144 nai.p:!!1ii,t'llli,! II:j i

frei, 1+ 1"!1 4-!

-1 -1 3 1 -si -I 1,g, i tis fit !!!!I 1 5 si E 5 ii III

f APPENDIX E I

FPC Electric Rate Schtdule Ilo. 1 Deck 0t No. ER76-45 Consu:ners Power Cc=pany Appe,c g Page 1 cf 19 9 CCI15U:EES FCiER CCIGA!rt SCHEDtTLE CF FATES GOVERITiG WHOIISAIZ FOR RESALE II.ECTRIC SERVICE Filed With Federal Fever Cecaission O Issued By A. H. Aymond Chairman of the 2 card of Directors 0

FPC Electric T. ate Schedule No. 1 Docket No. ER76-45 Consu=ers kvar Cc=;any Appendix E Page 2 cf 19 TABLE OF CCUTEN'S Subject Sheet Ut=her Title Page 1 Table of Contents 2 General Infor=ation 3 Index of Purchasers 4 Syste= Pap 5 Service Agree =ent - Wholesale for Resale q Electric Se:vice 6 Standard Rules and Regulations Applicable to Wholesale for Resale Electric Service 9 Wholesale for Resale Electric Service Contract Eate "WR" ~ 20 O e I O

FPC Electric Rate Schedulo Zia. 1 Docket No. ER76-45 Consuscrs Pow:r Company Apperxiix E Page 3 of 19 O CONSWERS PC*4ZR CC:GANY General Infor=atien Consumers Power Cc=pany, a Michigan corporation, cperates a private investor-owned utility business in the State of Michigan, having its principal place of business therein in the City of Jackson, Michigan. As a part of its public utility business, the Company is presently engaged in generating, purchasing. transmitting, distrf.buting and selling, at retail, electric energy in numerous ec= unities (1,5h2) within the State of Michigan, and in such communities, except for the City of Pontiac, its retail electric rates, nales and regulations are subject to the jurisdiction and centrol of the Michigan Public Service Cem=ission. The Company also sells electric energy, at wholesale for resale, to A several municipalities, public utilities and PIA cooperatives. The Company also is presently engaged in purchasing, producing, stor-ing, transmitting, distributing and selling natural gas to numerous ccmunities (790) within the State of Nichigan. All of the rates, rules and regulations of the Ccmpany are on file with the regulatoz/ authority having jurisdiction.

Dock t No. ER76 k5 Appendix E FIC Electric Rate Schtdule No. 1 Page 4 of 19 INDEX OF FURC:GSEFS Na e Address City of Charlevoix 307 Stover Ed, Charlevoix, MI 49720 City of Eaten Rapids 200 Knight St, Esten Rapids, MI E8827 ilolverine Electric Cooperative, 7r.c. 302 S. Itarren Ave, Big Espids, MI kg3c7 Edisen Sault Electric Cc::;:any Sault Ste Marie, MI 49783 Village of Unica City 202 Coldwater St, Union City, MI 49094 9 4 r i. 4 ,--o. e-4 +w

vocat* t 26). 3.K i tt*43 Appe:td.Jc I Pa.p $ et 19 CONSUMERS POWER COMPANY ELECTRIC TRANSMISSION LINES SERVING WHOLESALE FOR RESALE CUSTOMERS Q LEGEN0 vacnisse : W0t.f! ALE FOR RE! ALE C'J5MM!ti O can or sar ein n ~ * * ' O can or cuativoin stet,3 0 c n or catnurts - 341 av O c n or urs= unio $ - '2 caits" O cin er essen sreines - 46.a0 OA 24 av C srtau staNT O con or unsett Z ptasimG Ptant O ciff cr Petosat? I =ve:.taa *tAsr 'p S o,ituce e, exttsu V ".'C ' 8 ' " \\ s 2....... [M O cin er *:arumo ,,a a. iu srir,c, e psra aut:cm seestarcM .,,t:,, g O LU'8 F U"'C" C3YY Q scufkusrtAm attwium avut L t (tscTaic c:caturavt G atrina Pe.st c:mpaar i @ talscu 1Aut? EttcTaic c;*' ram?

safunt

[ ) @ elTT cr $7. (culs .a.rsrts( t-Q Atyttist Ett Tt!C c208tAAriVt g p g.- C3 4 ...a,.. ;;,:,;:::. =, = ; w c .g;,7,ggi.........,4. ar k. ~'k 1U3190f05 g g ,r.. gay car? .g WI PttA1AAI I Inf cIII g ,= i gw

  • c%

t -O, sg M, 3 - L[ ~ g. - f at.. { v -;~

ucas, k

.:d,--+ vusat::= c ais eareas b M c"c5% 3 ~ T*Of N f~ i~ 'v' 7r J / / .I b t- ---*1 e H ' Q I, '[ 9 - Y-Q a ) -~ x + i, - ". Q_ - = _ f:,s:, Q= M - %= y :., - . ft,q,Y l JT,C N i'" a avada ic tt L4_,r ' y .ita I. TO_ '. i V ~ ]q d ' u ~- MM',,Q4G:t 'dfa".'.'.a'.'Ta 1 P. Y, I ~ .._.....__...._.........s...._..,* I x.

7PC Elsctric Rats Scheduls Ns. 1 Dschat No. ER76-45 Consu=ers Power Company Appendix E Page 6 of 19 0 CCNSIEERS PCWER CC.WAFI SERVICE AGREI.T.:C WHOIISALE FCR RESAIZ ELEC':"3.IC SERVICE rated: Parties: Consu=ers Power Co=pany 212 West Michigan Avenue Jackson, Michigan hc201 (The Co=pany) AND (The Custo=er) b 1. General Agree =ent The Co pany agrees to supply and sell to the Custo=er and the Custo=er agrees to purchase and accept fmm the Co=pany, the Customer's require =ents fcr electric energy, subject to rates, charges, and other conditions of service as provided for in the Cc=pany's FPC Electric Rate Schedule "WR", or any effective su-perseding rate schedule, including any Standard Rules and Regu-lations applicable thereto, on file with the Federal Power Co=- =ission. Such electric service shall also be subject to the ter=s and conditions of this Service Agree =ent, and to the Cc=- pany's Standard Rules and Regulations Applicable to Wholesale for Resale Electric Service. 2. Energy to Be Furnished The Custo=er's derand will not be in excess of kilowatts being the capacity reserved by the Cc=pany for the Custo=er's use. The Cc=pany will, at the written request of the Custo=er made at least thirty (30) days in advance, per=it an increase in such reserved capacity provided the Company, in its sole discre-tion, dete. ines that it has the electric energy available at the point of delivery described in Section l+ hereof. b

FPC Electric Rata Schedula No.1 Dockee No. ER76-45 Consu= rs Power Compan7 Appendix E Page 7 of 19 3. Character of serrice The electric energy to be furnished by the Company to the Cus-tomer shall be alte=ating current, phase, 60 hert=, at approxi= ate.ky volts. 4 Point of Deliver / The point of deliver / for an electric energy to be supplied here-under shall be 5 Tem The ter= of this Agreement shall be for a period of years frem and after , 19 and from =onth to =enth thereafter until canceded by =utualle,nsent or upon .=onths' written notice given at any time by either party to the other. 6. Liability p Except as to the capacity and minimum charges payable by the Cus-temer prescribed in the Co=pany's FPC Electric Fate Schedule "WR", neither party shan be liable to the other for da= ages for any act, omission, or circu= stance occasioned by or in cense-quence of any act of God; lator disturbance, act of the. public ene:::y, var, insurrection, riot, fire, storm or flood, explosion, breakage or accident to =achinerf or equipcent, or by any other cause or causes beyond such party's control, including any cur-tailment, order, regulation or restriction i= posed by govern =en-tal, military or lawfully established civilian authorities, or by the making of necessar/ repairs upon the property or equip- =ent of either party hereto. Notwithstanding the provisions of the foregoing paragraph or any other provision of this Agreement to the centrary, the Custo=er shall at all times assume all liacility for, and shall inde=nify and save the Co=pany harmless from any and all da= ages, losses, claims, de. ands, suits, recoveries, costs and expenses for in-jury to or death of any person or persons whomsoever occurring on the Customer's own system, or for any loss, destruction of or damage to any property of third persons, fir =s, corporations, or other entities, occurring on the Custocer's own system, arising j out of or resulting from, either directly or indirectly, the Cus-t tomer's facilities, or arising out of or resulting from, either directly or indirectly, the electric energy sold hereunder af ter O it has been delivered by the Cocpany to the Customer.

FPC Eltetric Rate Schedule No. 1 Docket No. ER76-45 Consumers Power m..npany Appendix E l Page 8 of 19 7 Successors and Assigns This Agreement shall inure to the benefit of and be binding upon the successors and assi5ns of the respective parties hereto. This Agree =ent shall not be transferred by the Custc=er or oth-erwise alienated without the Co=pany's written consent. 8. Cancellation of Pricr Agree =ent This Agree =ent supersedes and cancels, en the effective date hereof, the Agreement bet'reen the Cc=pany and the Custo=er with relation to the supply of electric service dated 19, and all a=end=ents and supple =ents thereto. If no previ-ous Agree =ent for supply of electric service is cancelled hereby, so indicate: 9 Changes. A=end=ents and Supplements This Agreement shall not be amended or supplemented except in writing executed by the duly authorized officers of the parties hereto; provided, however, that nothing contained herein shall be construed as affecting in any way the right of the party fur-nishing service under Rate Schedule "WR" to unilaterally cake application to the Federal Power Com=ission for a change in races, charges, classification, or service, or any rule, regulation, or relating thereto, under Section 205 of the Federal Power contract Act and pursuant to the Commission's Rules and Regulations pro-mulgated thereunder. IN WITNESS WEEREOF, this A6reement has been executed en behalf of each of said parties by their duly authorized officers as of the day and year first above written. CONSUMEES PCWER CO:GAIR Attest: By Secretary Vice President Cus tccer Attest: 37 ~ ~- .~.

FPC Electric Rato Schedult No. 1-D:cket No. ER76-45 Consu=1rs Povsr Company ApperAix E Page 9 of 19 STASDARD RULES AND FIGUIATIONS APPLICA3LE TO WHOLESA' I2 FOR FISALE ELEC"RIC SERVICE Copies of the Company's Rate Schedule for Wholesale for Resale Elec-tric Service, as filed with the Federal Power Cor ission, are open to public inspection at the Company's offices and are available upon request. 1. Nature of Service The Company will endeavor, but does not guarantee, to furnish a continuous supply of electric energy and to maintain voltage and frequency within reasonable li=its. 2. Point of Delivery The point of delivery for electric service shall be established at the time of agree =ent with each customer, as set forth in the written contract. O 3 Unusual Facility Recuire=ents The Co=pany reserves the right to =ake special contractual ar-rangements as to the provision of necessary service facilities, duration of contract, minimum bills, or other service conditions with respect to custo=ers with special or unusual capacity re-quirements, or with respect to customers whose establishments are re=ote from the Company's existing suitable facilities, or with respect to customers whose service requirements otheraise necessitate unusual investments by the Company in service facil-ities. 4. Electric Facilities Policy When a request for the installation of new electric facilities and/or modifications of existing electric facilities has been granted and the Company is reasonably assured of the permanent constructand/ormo/ormodifiedfacilities,theCompanywill use of such new and dify such electric facilities under the con-ditions set forth below. Facilities, for the purpose of this rule, are defined to include the equipment necessar/ to provide electric requirements excluding =etering equipcent. A. For new electric facilities and/or =odifications of existing p electric facilities where the total esti=ated construction cost is $15,000 or less:

FPC E10ctric Rats Sch:dt_e Nc. 1 Doc 3nt !b. ER76-45 C::nsu=ers Pevsr Cc=panY Apperdix E Page 10 of 19 STAICAED.WES A!O REGi.IIATICNS APFLICA3E TO WHOESAE FOR EESAE ELECTRIC SEEVICE !+. Electric Facilities Policy (contd) 1. Decosits No deposit 'shall be requires when the total esti=ated construction cost of new electric facilities, as spe-cifically necessitated by the Custc=er(s) require =ents, less any applicable contributien required under Rule 3, does not exceed the esti=ated annual revenue frca the Custc=er(s) to be i==ediately serted or the esti=ated increase in annual revenue free the existing Custc=er(s) for whc= these facilities are provideni. Enen such to-tal esti=ated construction cost, less any applicable centribution required under Rule 3 is in excess of such esti=ated annual revenue, a deposit shall be required in the a:x:unt of the difference which shall be paid at such ti=e prior to the cc==ence=ent of construction as A the Cc=pany deter =ines. 2. Eefunds a. Eligibility The depositor for the original 2;y financed facili-ties beccces eligible for pay =ent of a refund when-ever, during the three-year refund period, there is increased revenue frem a Custc=er originally served f:cm the facilities, or' a new per:anent Customer be-gins taking service using the originally financed facilities, b. A= cunt The arount of the refund, if any, shall be calculated on the following bases: (1) For Originally Served Custc=ers: 1 At the end of the first year of the refund pe- { riod, the arount of the refund shall be the amount, if any, by which the actual annual rev-enue or the incre= ental revenue frca existing O Custc=ers for whom modifications are =ade ex-ceeds the or1 1nal revenue esti= ate for said 6 Custc=ers upon which the deposit was based. At m -e e

FI E1 ctric Rata Sch:dule No.1 Docket No. ER76-45 C:nsumers Pcwer Co=pany A..pe,.-dix E Page 11 of 19 STA?CAPD RULES AID REGUIATIONS APPLICA3LE TO WHOLESALE FOR RESALE ELECTRIC SERVICE k. Electric Facilities Policy (centd) the end of the second and third years of the refund period, the refund shall be the a:: cunt, if any, by which the = cst recent actual annual revenue or the incremental revenue frc= the ex-isting Custe ers for whe:s =cdifications are =ade exceeds the Ereatest of the first or second year's actual or incre= ental annual revenues or the original revenue es ti= ate for said Custo=- ers. (2) For Nev, Per=anent Custe=ers: The amount of the first yee.r's refund, if any, shall be based upon the first year's actual rev-enue reduced by the total estimated construction p cost, less any applicable contributien required under Rule 3, of the facilities required to serve the Custo=er(s). At the end of the sec-ond and third year of the refund period, the refund shall be the a=ount, if any, by which the = cst recent actual annual revenue for said Custc=er(s) exceeds the greater cf the first or second year's actual annual revenues. c. Refund Period The refund pericd shall begin the menth after the new or =cdified facilities are ec=pleted and shall expire three years thereafter. A depositor shall be eligible to receive a refund in respect of a new per=anent Customer who begins taking service frc= the original 1ly financed facilities during the last 12 months of the three-year refund period. Such re-fund shall be based upon the new Custc=er's first year's actual revenue. d. Payment Eligibility for payment of refunds shall be reviewed and pay =ents =ade, if any, at the end of each year during the three-year refund pericd. ~ - _

.~ FPC Electric Pate Schedule Iso.1 Decket yo. ER76-45 Aggerdix E Consu=ers Power Cc=pany. Page 12 of 19 STAIC.ARD RULES A D REGUIATIC:iS APPLICABLE TO WHOI2 SALE FOR RESALE ELECTRIC SERVICE k. Electric Facilities Policy (centd) 3. For new electric facilities and/or =cdifications of existing electric facilities where the total esti=ated const::nction cost is =cre than $15,Cooi 1. Deposits There shall be a deposit, which =ust be paid at such ti=e prior to the cc==ence=ent of construction as the Cc=pany deter =ines, in the a= cunt of the total esti- =ated construction ecst of new electric facilities and/ or =odifications of existing electric facilities, as specifically necessitated by the Custo=er(s) require- =ents, less any applicable contribution required under Rule 3, and the lesser cf $15,cCo or the esti=ated an-nual revenue frca the Custc=er(s) to be i==ediately D. served or the esti=ated increase in annual revenue frc= existing Customer (s) for whc= these facilities are pro-vided. 2. Refunds a. Eligibility The depositor for the originally financed facili-ties becc=es eligible for pay =ent of a refund when-ever, during the three-year refund period, there is increased revenue frc= a Custc=er originally served frc= the facilities, or a new per=anent Custc=er be-gins taking service using the originally financed facilities. b. A= cunt The a=ount of the refund shall be calculated en the following bases: At the end of the first and sec-ond years of the refund period, the a= cunt of the refund, if any, shall be in an a= cunt equal to the lesser of (i) one-third of the depcsit or (ii) one-third of the year's actual revenue of Custc=er(s) or one-third of the incre= ental revenue of exist-ing Custo=er(s) for whc= the =cdification was =ade; . ~..

~ FPC Elcetric P. ate Sch dula No. 1 Dockst No. Ea76-45 t;onsu=ers Power Cc=pany Appe:xiix E Page 13 of 19 O STA'OARD RUI23 A D REGUIATICI.3 APPLICA31E TO WOLESAI2 FOR RESAG ELECTRIC SERVICE 4. Electric Facilities Policy (contd) plus one-third of the actual revenue, less the esti- =ated construction cost, less any applicable centri-bution required under Rule 3, of any new per=anent Custo=er added during the refund period; less the original revenue esti= ate or $15,0C0 (whichever was used in determining the deposit). At the end of the third year of the refund pericd, the refund, if any, shall be deter =ined by cc= paring the three-year to-tal of actual or in'cre= ental revenue for originally served Cus tc=ers, existing Custc=ers for who: =cdi-ficatiens were =ade, or for new per=anent Custo=ers, less. three ti=es the original revenue esti:. ate or $45,000 (depending upon whether the original revenue esti= ate or $15,0co was used in deter =ining the orig-inal deposit), to three times the deposit. If the O three-year revenue excess so deter =ined is equal to or greater than three times the deposit, the balance of the deposit shall be refunded. Otherwise, the amount of the refund shall be deter =ined by the =ethed applicable to the first two years. c. Refund Period The refund period shall begin the month after the new and/or =odified electrical facilities are cc=- pleted or~upon the effective date of the service contract, whichever is later. A depositor shall be eligible to receive a refund in respect of a new per=anent Custe=er who begins taking service frc= the originally financed facilities during the last 12 months of the three-year refund period. Such re-funds shall be based upon the new Custe=er's first year's actual revenue. d. Payment Eligibility for payment of refunds shall be reviewed and pay =ents =ade, if any, at the end of each year during the three-year refund pericd. O ,wes- ,,.-Q.,

-.. ;~ ~ - - - - - FPC Eltetric Rate Schtdulo No. 1 Decket No. ER76-45 Consumers Power Company ' Appendix E Page 14 of 19 STANDARD RULIS AND REGULtTIONS APPLICABLE TO

  • (dOlESALE FOR RESALE ELECTRIC SERVICE 4.

Electric Facilities Policy (contd) C. Refunds - General 1. There shan be no refunds paid until the original Cus-temers for whom new and/or =odified electric facilities were constructed, or their equivalent, are actually con-nected to said facilities. Operation of this paragraph does not extend the three-year eligibility period for refunds. 2. In no case shan the total of refund pay =ents exceed the amount on deposit with the Compa=y. 3. No inter"est shan be paid on the a: cunts on deposit with the Company under this Rule 4 4. Where eligibility for a refund results from increased b revenue, no portion of such increase resulting from a change in rates approved or permitted to become effec-tive by the regulatory authority having jurisdiction vin be considered in determining the a=ount of the re-fund. D. Definitions 1. Unless otherwise stated, as used in this Rule 4, " total esti=ated construction cost" includes the Company's labor, materials, engineering and overhead expenses, operation and maintenance expenses, right of way costs and the de-preciated value of any facilities removed, less salvage value, plus the cost of removal. This does not include the cost of services and meters but does include the cost of transformers except where the provisions of the Com-pany's Rules and Regulations or Pate Schedules require the Customer (s) to furnish the transformer. 2. As used in this Rule 4, " revenue" does not include fuel clause revenue and taxes. 3. As used in this Rule 4, "originany financed facilities" are new or modified electric facilities for which there is a deposit outstanding.

~~- FPC Ehetric Rata Schcdule No,1 - Docket No. ER76-45 C nsumers Povsr Company Appendix E Page 15 of 19 O STANDARD RUES AND REGUIATIO55 APPECASE TO WHOESAG FOR RESAE ZECTRIC SERVICE 4. Electric Facilities Policy (contd) E. General 1. The Company reserves the right to make special contrac-tual arrangements as to the provision of necessarf elec-tric facilities, duration of contract, a=ount of deposit, mini =um bills or other service conditions where, in the Company's opinion, there is no reasonable assure.nce of the pemence or level of the use of the facilities. 2. Die Company shall construct electric faci 5.ities only in the event it is able to obtain and use the necessary materials,. equipment and supplies. The Company reserves the right!, in its discretion, to alloccte the use of such materials, equipment and supplies it may have available among the various classes of Customers and prospective Custemers of the same class. O 3. Where the company incurs costs in the installation of new electric facilities and/or ecdifications of existing electric facilities due to the necessity for paying in-spection fees or. securing per=its er other forms of gov-ernmental authorication, or where the construction causes property damage, excepting property damage resulting from negligence of the Company, its employees or its contrac-tors, to premises other than those of the person for whom the facilities are being constructed, or where, in the l Company's judgment, practical difficulties exist such as { frost or water conditions, rock. near the surface, or where there are require =ents for deviation from the Company's filed construction standr-rds, the total estimated con-struction cost will be increased by an a=ount equal to the Company's estimate of such additional costs. h. A Customer seeking new electric facilities and/or cod-ifications of existing electric facilities may be re-quired to furnish, without cost to the Company, all the necessar/ right of way and tree trimming permits in form and substance satisfactory to the Company. If right of way and permits are not secured in form and substance satisfactor/ to the Company, the Company will extend its facilities along an alternate : cute, if available, se-A lected by the Company and include such additional costs incurred in the total esti=ated construction cost. ---y- -c....,.--f

FPC Elec.tric Rata Schedulo No. 1 Dock t No. ER76-45 Concu=ers ?cuar Cc=pany Apcendix E Page 16 of 19 STA:CA",D RUES A:D REGUIATIC:G APPLICA3 G TO i4HOESAC FOR RESAE E1ECTRIC SERVICE 4 Electric Facilities Policy (centd) 5 An electric facilities, except the Cc=pany's =etering facilities, required by a Custc=er beyond the point of delivery of electrical energy shall be furnished, in-stan ed and =aintained by the Custc=er. 6. All facilities constmeted pursuant to this Rule 4 shall be subject to the ter=s and conditions of the Cc=pany's i Standar:i Centract for=s and its Standard Rules and Regu-lations Applicable to *4holesale for Resale' Electric Ser-vice, of which'this Rule 4 is a part. 7. Whenever.this Rule 4 requires a deposit for the cen-struction and/or =cdification of electric facilities, the facilities subject to the deposit shall be a sepa-rate, distinct unit and additions or modifications thereto (which require a deposit pursuant to this Rule b) shall have no effect upon the Agree =ents in the first instance under which said facilities were constructed or modified. 8. No cunership rights in any facilities pmvided by the Cc=pany shall pass to any person as a result of any de-posit or centribution rade under these Standar:i Rules and Regulations. 9 5 Metering and Metering Equ1=ent ~ The Cc=pany shall furnish, install and =aintain suitable and adequate =eters and =etering equi;=ent for the =casurement of maxi =um de= ands and kilevatthours delivered. Meters shan o.-~di-carily be installed at the point of delivery as described in the Service Agree =ent, and shall be suitable for the voltages at which energy is delivered to the Custc=er. The Custo=er shall provide free of expense to the Co=pany a space suitable to the Co=pany for the installation of the necessary =etering equip =cnt and shan afford adequate protection to avoid da= age thereto or any ta=pering or interference with said =etering equip =ent. The Customer shall pemit only authorized agents of the Cc=pany' or other persons lawfun y authorized to do so, to inspect, test or re=cve the same. If the =eters or =etering equip =ent are da= aged O or destroyed through the neglect of the Custc=er, the cost of necessary repairs or replace =ents shall be paid by the Customer. The Cc=pany shall periodically inspect and test its =eters and _,-..,.-._,,...,.9 _e, _.,._wc._ m.

FPC Eltetric Rata Schsdul2 No. 1 Dock;t No. ER76-45 Consu=ers PowIr Company Appendix E Page 17 of 19 STA:CAED RUIES AID REGUIATICES APPLICA3G TO WHOLFEA G FOR RESA E EIECTRIC SERVICE 5 Metering and Metering Ecui::=ent (contd) keep the= within accepted standards of accuracy. The Custc=er shall have access to and the right to participate in the inspec-tion and testing of such =eters by its proper representatives. The Customer shall also have the right to read any of said =e- 'ters at all reasonable times. Said meters shall be tested an-nually by the Cc=pany, and if the Customer desires more frequent tests, it shall bear one-half of the expense thereef. 6. Equic=ent to Be Furnished A. By the Cc=cany: In addition to its said =eters and metering equipment, the Cc=pany shall furnish, cwn, instn, and =aintain all elec-tric lines and other equip =ent for the deliver / of energy to p the point of delivery described in the Service Agree =ent. 3. By the Custc=er: The Custo=er shan furnish end c:aintain, at its expense, a facilities beyond the point of delivery described in the Service Agree =ent. The Cc=pany shall have no obligation to inspect the Custc=er's said facilities nor have any responsi-bility with respect to the installation, repair, =aintenance, replace =ent, relocation, or operation of said facilities. 7 Ioad Balance and use of Serrice The Customer shall arrange its circuits and operations so as to avoid a fif teen percent (15if>) current unbalance between the high and low phases. The Custc=er and its custc=ers shall use the service so as not to disturb or interfere with the Cc=pany's ser-vice to its other custc=ers. Electrically operated devices which could cause objectionable operating conditions on the Cc=pany's syste=, as dete--sined by the Company, shall not be attached by the Custc=er without consent of the Cc=pany. The Company will not furnish service in par =11e1 with a Custo=- er's generating facilities when, in the opinion of the Cc=pany, such parallel operation =ay create a hacard, disturbance, impair or interfere with con =:unication circuits or with the Cc=pany's

FPC Electric Rata Cchtduls No. 1 Dockst No. ER76-45 Consumers Power Co=pany Appendix E Page 18 of 19 STANDA:D RULES AND REGUIATICNS APPLICABLE TO WHOLESALE FOR RESALE ELECTRIC SERVICE 7 Icad Balance and Use of Service (contd) sertice to other customers. The Ccepany may agree to parallel operatien when the Custc=er provides adequate protective equip-ment and has sufficiently traihed perscenel to perform the nec-essary operations and to protect its equipment and sertice and the equipment and service of the Company frca injury or interrup-tiens which might be caused by a flew of current frem the Co:- pany's lines to the Custccer's connections, or from a flow of current from the Custc=er's lines to the Cc=pany's connections, and when the Custccer assumes any loss, liability or da"ge ' caused by lack of such protection. In the event that the Cus-temer elects to rely en any equipment owned by the Cc=pany de-signed to avoid any loss or interruption which might be caused by a flow of current from the Company's lines to the Customer's connections, the Custc=er agrees to assume any loss, liability or damage which c:ay be caused by the operation, misoperation, A nonoperation, or inadequacy of the Company's said appliances or devices. It may further require the Custc=er to pay the cost of insta ning and maintaining private telephone connections with the offices of the Company's Loaci Dispatcher. 8. Access to Customer's Premises The Company's authorized agents shan have access to the Custem-er's premises at all reasonable hours, to install, inspect, read, repair or re=cve its meters; to install, operate and maintain other Cc=pany property; and to inspect and determine the con-nected electrical load. Neglect or refusal on the part of the Customer to provide reasonable access shan be sufficient cause for discontinuance of service by the Company and assurance of ac-cess c:ay be required before service is restored. 9 Bins and Remittances The Company sha n render to the Custccer, within a reasonable time after the first of each month, proper billing for electric energ-/ furnished during the preceding month. Such accounts shan be paid by the Customer within twenty (20) days after date ren-dered. The infor:ation shown on the bills win include the beginning and closing dates of the. period for which the bill is rendered, the O meter readings, actual or esti=ated, the number of units, the a=ount payable, the due date, a state =ent that the a=ount billed -,4 n --...e~.

FPC Elcctric Rata Schedul3 N2. 1 Dec..st No. ER76-45 Y Consu=ers Pov:;r Cc=pany A.p dix E Page 19 of 19 STANDARD RLTIS AID REGUIATIO:;S APPLICA3LE TO

  • E0IISALE FOR RE3 ALE EIZCTRIC SERVICE 9

ains and Remittances (centd) includes any tsx which the utility is authori::ed to collect frc= its Custc=ers, a state =ent that the bill is based on esti=ated meter readings, if such is the case, and the na=e and address of the Custo=er. 10. Invalidity of Oral Representations Where a written contract is required, no promises agree =ents or t representations of any agent or e=ployee of the Cc=pany shall be binding force upon the Cc=pany unless the sa=e shall be incorpo-rated in the written contract for electric service.

11. E=ergency Electrical Procedures When the Cc=pany determines that an electrical supply e=ergency A

exists, and E=ergency Electrical Procedures are i=ple=ented by the Company pursuant to the Order of the Michigan Public Service Co==ission in Case No. U-4128, the Custo=er shan be required, upon request by the Company, to rake reductions in the load it places on the Co=psny's syste= by i=plementing the procedures contained in Dthibit A, "E=ergency Electrical Precedures," cen-tained in the Order of the Michigan Public Service Cc==issien in Case No. U k126 issued May 23, 1975, or by i=plementing other curtailment procedures dee=ed by the Cc=pany to be subs *xitially equivalent thereto.

CERTIFICATE OF SERVICE I hereby certify that I have this day caused to be served the foregoing MOTION TO LODGE SETTLEMENT AGREEMENT, by deposit in the United States mail, upon the following persons: Alan S. Rosenthal, Esquire James B. Falahee, Esquire Chairman, Atomic Safety and General Counsel Licensing Appeals Board Consumers Power Company U.S. Nuclear Regulatory Comm'n. 212 West Michigan Avenue Washington, D. C. 20555 Jackson, Michigan 49201 Michael C. Farrar, Esquire William Warfield Ross, Esquire Atomic Safety and Licensing Wald, Harkrader & Ross Appeals Board 1320 - 19th Street, N.W. Nuclear Regulatory Comm'n. Washington, D.C. 20036 Washington, D.C. 20555 Keith Watson, Esquire Richard S. Salzman, Esquire Wald, Harkrader & Ross Atomic Safety and Licensing 1320 - 19th Street, N.W. Appeals Board Washington, D.C. 20036 Nuclear Regulatory Comm'n. Washington, D.C. 20555 Seth R. Burwell, Esquire Burwell & Shrank Hugh K. Clark, Esquire 1020 Washington Square Building Chairman, Atomic Safety Lansing, Michigan 48933 and Licensing Board Nuclear Regulatory Comm'n. Honorable Frank Kelly Washington, D.C. 20555 Attorney General State of Michigan Robert Verdisco, Esquire Lansing, Michigan 48913 Antitrust Counsel for Nuclear Regulatory Staff Dr. J.V. Leeds, Jr. Nuclear Regulatory Comm'n. P.O. Box 941 Washington, D.C. 20545 Houston, Texas 77001 Frank W. Karas, Chief Public Proceedings Branch Office of the Secretary Nuclear Regulatory Comm'n. Washington, D.C. 20545 Mark Levin, Esquire Forrest Bannon, Esquire Antitrust Division Department of Justice P.O. Box 7513 Washington, D.C. 20044 Dated at Washington, D.C., this 26th day of April, 1977. hEt f Robert A.'Jablon}}