ML19326A175

From kanterella
Jump to navigation Jump to search
Notifies That Facility Is Top Priority & Identifies Items Deserving Immediate Attention.Ser Suppl,B&W ECCS Calculational Errors,Rod Bow Package & Tech Specs Need Review
ML19326A175
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/28/1977
From: Mazetis G
Office of Nuclear Reactor Regulation
To: Ross D
Office of Nuclear Reactor Regulation
References
NUDOCS 8002030038
Download: ML19326A175 (1)


Text

'

(<fdi spb 'jWh e,

~

Central File f R8 x 6 W/

RSB Reading Mazetis Chron WMORANDUM FOR:

D. F. Ross, Jr., Assistent Director for Reactor Safety, 055 THRU: Thomas it. Novak, Chief, Reactor Systems Branch, DSS FROM:

G. R. Mazetis, Section Leader, Reactor Systems Branch, DSS

SUBJECT:

DAVIS-BESSE 1 In a meeting with Projects on February 23, 1977, Davis-Besse I was identified as one of several plants of di priority. Accordingly, the following work is deservinc of 1 mediate attention on Davis-Besse 1:

1.

Review of B&W ECCS calculational errors and SER sucolerent.

2.

Review of overoressure protection submittal.

3.

Final review and recomendations on a) locking out power to nHR isolation valves b) DHR ranual byoass 4

Rod bow Deckace review.

5.

Tech Scec review.

To expedite staff raview of these areas, I have enlisted the belo of Al Ignatonis (Item 1) and Ron Frahm (Iten 2).

It is anticipated that this effort will be intensive for the next 2-3 weeks richt uo to the coint of scheduled fuel load. A5 a result, the followinn areas ray have a minor setback:

- PBF program reassessment

- FFTF review

- Shoreham review Original sigied by:

G. Fazetis, Section Leader Reactor Systems Branch Division of Systems Safety -

cc:

T. Novak D. Vass o

R. Frahm R. Den s inu.; -

n.

agnason is ES$;BSV, or.cs e

@ :db_

._.[TNovak

,w - -s.g is, NRR

..,s.xq7341 2

77 _. _2r 'OZ7 Fe as AEC.lls (Rev. 9 53) AICM 0240

  1. v. e. oovenseuswt raisevine orrics sev4.saSese 8002030638