Recommends That Facility OL Include Condition That Fire Protection Be Increased to Acceptable Levels
ML19326A174
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/01/1977
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Vassallo D
Office of Nuclear Reactor Regulation
References
NUDOCS 8002030037
Download: ML19326A174 (2)


Text

--

y y'

v-

s s

DISTRIBtTTION gjg 0 2 7377

[ DOCKET FILES NRR READING ASB READING PS READING R. TEDESCO

. Docket No. 50-346 NOTE FOR:

D. 3. Vassallo, Assistant Director for Light Water Reactors, LPM FROM:

R. L. Tedesco, Assistant Director for Plant Systems, DSS SUBJ'CT:

DAVIS BES3C NUCLEAR PudER STATION, UNIT NO. 1 - FIRE d

PROTECTION In Suppionent ateber 1 to the SER, dated Ma'/ 10, 1976, we added the following conclusions to Section G.5.1, " Fire Protection System:"

"As a result of investigations 2nd evaluations presently being conducted by the NRC staff as fire protection system, further requirements will be imposed on tne Davis Ecsse thiit No. I design to further isprove tne capability of the fire protection systea to prevent unacceptable damage that =sy result from a fire."

Gn Septecher 30, 1976, we transmitted to the applicant Appendix A to 3 ranch Technical Position 9.5.1, " Guidelines for Fire Protection for Maclear Power Plants Detected Prior to July 1,1976."

At the ACRS meeting in January, to an inquiry of a nc ber, we stated that Davis desse 1 mots our minir.ua requirements for fire protectica, and that we would review the fire protection progran against Appendix A in an expeditious : anner. Our aim was not to delay fac1 loading and -

power testing dates.

On February 11, 1977, we received the submittal of Davis Besse 1 in answer to our lottor of Septccber 30th. Le submittal decs not contain an adequate fire hazards analysis to be able to determine tne fire pro-tection needs for the plant. The only modifications proposed are (a) installation of kacwool on cable trays, and (b) installation of fusible links on non-alarmad fire doors. ?!any areas, including the cabic spreading room have no fixed fire protection systecs, and none are proposed, or justification given for not providia; ene. iic centacted the utility by phone; however, the applicaat refused to cc==it to r.cetia;;

j

- the general guiaolines of Appendix A or acceptabic alternatives.

8002030037'

Contact:

V. Benaroya e

W, s -/

orrec s

  • summamew onte m j

1 Fe,m A5c.)l3 (Rev. M)) A8cM 02eo 15 u. e. eovsamusar reinvene oprics: te n.sas.see

h24 A

.e D. B. Vassallo 2

'Ihe new submittal and the license's lack of commitnent to meeting the Appendix A guidelines do not give us the confidence that Toledo Edison has serious intentions in improving the fire protection progran at Davis Besse 1.

On this b%is, we recormend that the operating license for Davis Besse 1 h6 conditioned with the provisions tnat Toledo Edison increase the lovel of fire protection in Davis Bosse 1 to the levols recommended in Appendix A to STP 9.5.1, or with alternatives acceptable to NRC staff, and the irapicoantation of those changes be cocpleted in a reasonable ti=o frame to be delineated by NRC prior to the issuance of the operating license.

C7.?GDict SW33 3T

". L. :.; 3.:,;

Robert L. Todesco, Assistant Director hr Plant Systems Division of Systems Safety cc:

R. lieiner.an R. Boyd

. R. DeYoung J. Stol:

L. Engle P. Matthews V. Denaroya V. I.Cung FILE:

Davis Sosse 1

.e, ASB:PS P[ DSS eg t

eu - =e

  • SBenatoyalmg _BLTjnlesco kl.0$fl7 bbt177 nw yese ABC 315 Olav. >S)) AECM 0240 17 v. e. eovanse-emy passetme orreces so74.ese.see s

,- -