DISTRIBtTTION gjg 0 2 7377
[ DOCKET FILES NRR READING ASB READING PS READING R. TEDESCO
. Docket No. 50-346 NOTE FOR:
D. 3. Vassallo, Assistant Director for Light Water Reactors, LPM FROM:
R. L. Tedesco, Assistant Director for Plant Systems, DSS SUBJ'CT:
DAVIS BES3C NUCLEAR PudER STATION, UNIT NO. 1 - FIRE d
PROTECTION In Suppionent ateber 1 to the SER, dated Ma'/ 10, 1976, we added the following conclusions to Section G.5.1, " Fire Protection System:"
"As a result of investigations 2nd evaluations presently being conducted by the NRC staff as fire protection system, further requirements will be imposed on tne Davis Ecsse thiit No. I design to further isprove tne capability of the fire protection systea to prevent unacceptable damage that =sy result from a fire."
Gn Septecher 30, 1976, we transmitted to the applicant Appendix A to 3 ranch Technical Position 9.5.1, " Guidelines for Fire Protection for Maclear Power Plants Detected Prior to July 1,1976."
At the ACRS meeting in January, to an inquiry of a nc ber, we stated that Davis desse 1 mots our minir.ua requirements for fire protectica, and that we would review the fire protection progran against Appendix A in an expeditious : anner. Our aim was not to delay fac1 loading and -
power testing dates.
On February 11, 1977, we received the submittal of Davis Besse 1 in answer to our lottor of Septccber 30th. Le submittal decs not contain an adequate fire hazards analysis to be able to determine tne fire pro-tection needs for the plant. The only modifications proposed are (a) installation of kacwool on cable trays, and (b) installation of fusible links on non-alarmad fire doors. ?!any areas, including the cabic spreading room have no fixed fire protection systecs, and none are proposed, or justification given for not providia; ene. iic centacted the utility by phone; however, the applicaat refused to cc==it to r.cetia;;
j
- the general guiaolines of Appendix A or acceptabic alternatives.
8002030037'
Contact:
V. Benaroya e
W, s -/
orrec s
- summamew onte m j
1 Fe,m A5c.)l3 (Rev. M)) A8cM 02eo 15 u. e. eovsamusar reinvene oprics: te n.sas.see
h24 A
.e D. B. Vassallo 2
'Ihe new submittal and the license's lack of commitnent to meeting the Appendix A guidelines do not give us the confidence that Toledo Edison has serious intentions in improving the fire protection progran at Davis Besse 1.
On this b%is, we recormend that the operating license for Davis Besse 1 h6 conditioned with the provisions tnat Toledo Edison increase the lovel of fire protection in Davis Bosse 1 to the levols recommended in Appendix A to STP 9.5.1, or with alternatives acceptable to NRC staff, and the irapicoantation of those changes be cocpleted in a reasonable ti=o frame to be delineated by NRC prior to the issuance of the operating license.
C7.?GDict SW33 3T
". L. :.; 3.:,;
Robert L. Todesco, Assistant Director hr Plant Systems Division of Systems Safety cc:
R. lieiner.an R. Boyd
. R. DeYoung J. Stol:
L. Engle P. Matthews V. Denaroya V. I.Cung FILE:
Davis Sosse 1