Requests Arrangement for IE Contractor to Review Plant Emergency Operating Procedures During Wk of 800609-13. Contractor Is Developing Checklists for Use in NRC Reviewing Procedures
ML19323F493
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/14/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8005290082
Download: ML19323F493 (2)


Text

- _ ____._ - _______

I

'N c,c>0 "is,%g UNITED STATES

["-

~

NUCLEAR REGULATORY COMMISSION g-e a REGION ill g

e'['

g 72B ROOSEVELT ROAD GLEN ELLYN, ILLINOIS CM7 May 14, 1960 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:

We have been requested by our headquarters to arrange for an Office of Inspection and Enforcedent contractor to review the Point Beach emer-gency operating procedures during the week of June 9 - 13, 1980. The OIE contractor, Human Pedformance Technologies, is under contract to develop checklists etc. for our use in reviewing emergency operating procedures.

The visit to Point Beach is one of four sites picked at random for a data gathering function and will not result in items of noncompliance being generated or recommendations for revision of procedures.

In addition to the procedure review, HPT personnel will need to talk to your training staff, review the administrative system for development and updating of procedures and be given a walk-through of 5-7 selected emergency procedures. The walk-throughs are the most important part of this effort and will require a member (s) of your operating staff to assist. HPT personnel will be available to witness the walk-through on back shifts as well as day shift, whichever is most conveaient for you.

The individual licensee will not be identified in the final report, but the data collected will be used to provide a composite picture of the emergency procedures that were reviewed.

Copies of the final report, estimated to be issued in April, 1981 will be provided to all licensees that participate.

It is our understanding that the HPT reviewer for this effort is Mr. Meyer (Mike) Weinstein, Social Security No. 097-18-2741.

8005290 0 %

Wisconsin Electric Power May 14, 1980 Company We would appreciate your cooperation in this matter. If you have any questions please contact me.

Sincerely, O

R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch cc:

Mr. G. A. Reed, Plant Manager Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John J. Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations i