ML19323D377

From kanterella
Jump to navigation Jump to search
Forwards LER 80-040/03L-0
Date released: 12/03/2019 Download: ML19323D377


LER 80-040/03L-0:on 800423,during Run Mode,Drywell/Torus Differential Prv Opened.Caused by Design Problem W/Sensing Line for Pressure Switches.Control Switch for Differential Pressure Pump Placed in Manual Position Until Design Change
ML19323D379
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/15/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323D379 (2)
Forwards LER 80-040/03L-0
ML19323D376
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/15/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323D376 (1)