ML19323C711

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amends 54 & 51 to Licenses DPR-39 & DPR-48,respectively
ML19323C711
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/28/1980
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19323C708 List:
References
NUDOCS 8005190047
Download: ML19323C711 (2)


Text

._

80051d0 %

O 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-295 AND 50-304 COMMONWEALTH EDISON COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 54 to Facility Operating License No. DPR-39, and Amendment No. 51 to Facility Operating License No. OPR-48 issued to the Commonwealth Edison Company (the licensee), which revised Technical Specifications for operation of Zion Station, Units 1 and 2 (the facilities), located in Zion, Illinois.

The amend-ments are effective as of the date of issuance.

The amendments add Technical Specifications for the Overpressure Mitigating System, approve the system as the long-term solution to the generic issue, add a licensing condition requiring a secondary water chemistry monitoring

. rogram, and revise Zion Unit No. 2 Technical Specifications for control rod insertion limits. Minor changes which have been made to your proposal have been discussed with your staff.

The application' for the amendments comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, l

l

-g.

which are set forth in the license amendments.

Prior public notice of these cmendments was not required since the amendments d$ not involve a significant hazards consideration.

The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments.

l For further details with respect to this action, see (1) the application for i

l amendments dated September 2, 1977, supplemented by letters dated February 26 and September 26, 1979, and applications dated September 28 and November 7, 1979; (2) Amendment Nos. 54 _ and 51 to License Nos. DPR-38 and DPR-49; and (3) the Commission's related Safety Evaluation.

All of these items are avail-able for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, DC and at the Zion-Benton Public Library District, 2600 Emmaus Avenue, Zion, Illinois 60099. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, DC, 20555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 28th day of April,1980.

F THE CLEAR REGULATORY COMMISSION A. ghwencer, Chiefa,eu a s Sc l

Operating Reactors Branch #1 Division of Operating Reactors