ML19320A891

From kanterella
Jump to navigation Jump to search
Forwards LER 80-037/03L-0
Date released: 11/30/2019 Download: ML19320A891


LER 80-037/03L-0:on 800528,during Containment Integrity Check,Required Negative Pressure Not Reached.Caused by Leaks in Pipe & Cable Penetrations & Steam Line Boots.Penetrations Repacked & Boots Replaced.Test Procedures Revised
ML19320A895
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/27/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19320A895 (2)
Forwards LER 80-037/03L-0
ML19320A890
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/27/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19320A890 (1)