Nonroutine Nonradiological RO 50-313/74-03:on 741121,fish Impingement on Intake Screens Totaled 4,182 Lbs.Caused by Seasonal Unstable Water Temp.Monitoring Continued for 24-h
ML19320A061
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/22/1974
From: Phillips J, Reuter D
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19320A056 List:
References
NUDOCS 8004140677
Download: ML19320A061 (3)


Text

- _.

s m

0p '

l .

i 50-313/74-3

1. Non-Routine, Non-Radiological Report No.

Report Date: 11-22-74 3. Occurrence Date: 11-21-74

2. s
4. Facility: Arkansas Nuclear One - Unit 1

_ i.

5. Identification of Occurrence: .

Fish kill on Intake Screens exceeding 3000 lbs. based on 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> samp

' 6. Conditions Prior to Occurrence:

Reactor Power 1926 MWtfr Steady-State Power X f' Net.0utput 650 MWe Hot Standby Cold Shutdown Percent of Full Power 75 %

Refueling Shutdown Routine Startup h

\

Operation Routine Shutdown ,

Operation ,

Load Changes During Routine Power Operation '.

Other (Specify) All four circu ating water pumps were in operati I 7. Description of Occurrence:

11-21-74 using procedure During routine fish impingement monitoring

  • Monitoring Fish Impinged on. ANO Intake Screens, 4182 lbs, of fish w collected during a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. This 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period began 9:00.:

November 20, and ended 10:30 a.m. November 21, 1974. A mixtureOthe- of4 and ihreadfin Shad made up 99.9% of the total weight of fish.

Threadfin Shad made up 97% o made up only .1% of the total weight.

total weight of Shad. .

s

}

O V .

8004140[77 -

p NSP-10, Rev. O Page 1 of July S, 1974

i

.  : - s (O

%s) .

a Non-Routine, Non-Radiological Report No. 50-313/74-3 f j

, 8. Designation of Apparent Cause of Occurrence:

I Design Procedure

- Manufacture Unusual Service l

Condition Including l Environmental Installation /

Construction -

Component Failure Operator 4

}

Other (Specify) The apparent cause was due to th'e unstable wal J

temperature in Lake Dardanelle during the firs f weather of the winter seasog.

I

9. Analysis of Occurrence:

/  ! We only noticeable Environmental Impact was the removal of the

! mentioned fish from the lake, These fish were disposed of thrc land fill operation, none were dumped into the discharge embayr l

1 y

i .

I

10. Cy rective Action:

Corrective action was taken in accordance with procedure 1607 Ris included continuous monitoring for another 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> peri 6 The findings of this were that only 2251 lbs. of fish were int.

0 L)

July 5, 1974 NSP -ID, Rev. O Page

- " -- --,--v-_ -, , , _ . . - _ _

O .

V  :

t.

1 .

j Non-Routine, Non-Radiological Report No. 50-313/74-3 Sheet

.  ; 11. Failuro Data: '

?

\ .

'Ihe circumstances of this report are similar to those reported in Non-Routine, Non-Radiological Environmental Reports No. 50-313/74-1

{l and 50-313/74-2.

l 9

12. Reviews and Approvals:

Reviewed and Approved by: Plant Safety Committee Yes (x) No Plant Superintendent Yes (x) No (p) .

{

(/ Referenec: JWA-695 Date: 11/26/.~

Reviewed by: u Date: // y p/

Licensing Supervisor Approved by: [ f /f[L } & k9n, G f Date: lh & ~~l l ./ afety R'ev'ic' omm'ttee I '

. Approved by: d.' L W Date: /2- '

I agerofNcErServices[

Approved by: /k{s// / ;[,J.,.(r, f Dato: /2 P

  • E9' I

Director of Power Pyoduction Approved by:

d , '.,_ Date: /' -7 3 Senior Vice Prc$ident

~

m9 m' 3 {

%g 6 b#

o U

t -

July 5, 1974 NSP-10, Rev. O Page 3 of-