ML19317D817

From kanterella
Jump to navigation Jump to search
Forwards RO-269/77-11
Date released: 11/27/2019 Download: ML19317D817


RO 269/77-11:on 770322,primary-to-secondary Leakage Revealed in 1B once-through Steam Generator.Caused by Weld Crack on Plug Used to Isolate Tube 25,row 77.Weld Failure Repaired & Inspected.Other Questionable Tubes Plugged
ML19317D822
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/05/1977
From:
DUKE POWER CO.
To:
References
Download: ML19317D822 (2)
Forwards RO-269/77-11
ML19317D816
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/05/1977
From: Parker W
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317D816 (2)