LER 79-134/03L-0:on 791229,IBM Sys 7 Contact Data Logger in Control Room Had Not Printed Out in More than 24-h.Caused by Sys Being Locked Onto Invalid Door Alarm.Error Cleared, Program Reloaded & Operable
ML19257C490
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/24/1980
From: Borysiak M
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19257C487 List:
References
LER-79-134-03L, LER-79-134-3L, NUDOCS 8001290223
Download: ML19257C490 (2)


Text

LICENSEE EVENT REPORT CONTROL B LCCK: [l i

l l l l 6

}h (PLEASE PRINT OR TYPE ALL REQUIRED INFOHMATION) lo l 18 l9 l 0 l LICEP.5EE 3

H l D CC'DE l B l S 14l 1 Q,l 0 l 0 l - l 0 l 0 l N l P l F l - l 0 l 3 l@l 4 l1 l 1 l 1 l 1 l@l l [g th LICEN5E NUV8Eri 23 20 LICENSE TVFE JJ 51 L A I bd CcN T loji] 3j",g",'

7 6 lL @l 0l 5 l 0 l - l 0 l 3 l 4 l 6 MQl 163 j .2 l 2 l 9 l 7 l 9 @l 0 l 1 l 2 l 4 l 8 l 0 l@

tLJ bi DOC A E T %YeER kvENT DATE 74 72 REPOR T DATE BJ EVENT DESCRIFTION AND PRO 3ABLE CONSEQUENCES h o 2 l On December 29,1979 at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, an operator noticed the IBM System 7 Contact Data l

[ o 13 l l Logger in the Control Room had not printed out in over a day. The system was tested j o 4 l and declared inoperable. The unit entered the action statement of Technical Speci- l o s I fication 3.3.3.8. There was no danger to the health and safety of the public or to l o s l station personnel. The required hourly fire patrol was established. (NP-33-79-157) j 0 7 l l

lolaI 7 8 9 l SYSTE" CAUSE CAUSE CODE C O'A P. VALVE CODE SU3 CODE COPJPONENT CODE g SUBCODE SU9 CODE

.7 8 lA lB l@ W@ [ G l@ l Il Nl Sl Tl Rl Ul@ l Rl@ l 2JZ l@

9 10 11 12 13 Id I ')

SEQUEN TI A L OCCUAPENCE LER PO EVENTVEAR R E P O547 REVISION REFORT NO. CODE TYPE NO.

O ag.La; 17191 8 111314j s

21 22 23 24 a6 l/l 27 I 013 I 28 23 ILI 30 l-l Ji W

32 TAKE A 0 0 PLA T THd W OL'R S 22 1 b F R* 5V3. 5 PP IE MAN eA T ER lXlgl4X 33 lg lZlg l30Zl@ 31l 0 l0 l0 lD40l lY lQ [N g l Alg l Il 0l 1l 0lg 46 42 43 44 47 CAUSE DESCRIPTION AND CORRECT!VE ACTIONS h i

o l A check of the system showed that it was locked onto an invalid door alarm .

This was l l t { s l l preventing the system from acknowledging and printing out any other alarm. On Decem- l 3 ,

ber 31, 1979 at 1735 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.601675e-4 months <br />, the error was cleared, the program reloaded, and the systeg l , l 3 l l declared operable. Work is continuing on phasing out the System 7 under Facility j g l Change Request 78-083.

7 8 9 l ST US *PCWER OTHER STATUS blSCG HY OfSCOVERY DESCRIPTION 5

@@ l 0 l 0 l 0 lh u 12 NA l l<sAl@l4s operator observation l

' ETiviTY A COM TENT 44 so R u EASED OP REu ASE 7

i e 8 9 I zi @ l toz l@ it Na -OUNT OP ACTIVITY 44 I NA 45

@l LOCATION OF RREASE @

l i

PERSONNEL EXPO 3URES So NU'38 E R TYPE DESCRIPTION ' j Q [ h. Qj li 7 e v sU v/ l 1 01 01 Ol@l zl@l NA l

PERSONNE L iNJURIE S NUMBER < DESCRIPTION

.i 7

101010181 n 8 9 11 12 I LOSS OF OR DAYAGE TO FAClllTY TYPE D E SCRi8 TION .

i e 8 9 I zl@lio NA I

i$$cE7 DUCRiPTiON O " * ""

2 o

_8 9( 3}hl NA 8001290 S I 10 08 6 ')

llllllllllll l1 80 ;

JVR 79-204 NAME OF PREPARER Michael L. Borysiak 419-259-5000, Ext. 233. o pgoyg; g

r 1

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-157 DATE OF EVENT: December 29, 1979 FACILITY: Davis-Besse Unit 1 Failure of the IBM System 7 Security / Fire / Radiation IDENTIFICATION OF OCCURRENCE:

Computer The unit was in Mode 5, with Power (MWT) = 0, and Conditions Prior to Occurrence:

Load (Gross MWE) = 0.

Description of Occurrence: On December 29, 1979 at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />,5an operator noticed that the Contact Data Logger in the control room had not print out an alarm in over a day. This system presently logs fire and radiation monitor alarms To check(the thedoor sys-alarms have already been transferred to the new computer system).

tem, the operator tested a radiation alarm to see if the Contact Logger System would acknowledge; it did not.

The IBM System 7 Contact Data Logger was declared inoperable. The unit entered the action statenent of Technical Specification 3.3.3.8 the accessible which requires a fire patrol be established within an hour to inspect zones at least once per hour.

A check of the printout of the local Designation of Apparent Cause of Occurrence:the system became locked into an invalid door typer in the computer room showed thatWithin the IBM System 7, the memory which alarm. This indica for the door is used, indicated but did not clear when the message was printed. to be caused the buf fer that holds the messages to overflow and the words " msg lost" printed. Due to this condition, the Systen 7 would not allow any other alarms to be acknowledged, and therefore, nothing further was typed.

Analysis of Occurrence:

There was no danger to the health and safety of the public or to station personnel. An hourly fire patrol was established.

Corrective Action: On December 31, 1979, at approximately 1735 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.601675e-4 months <br />, the error The system was placed back in was cleared, and the computer program was reloaded.from the action statement of Technical operation thus removing the unit 3.3.3.8. Work is continuing on phasing out the System 7 Contact Data Logger per Facility Change Request 78-083.

Failure Data: There have been numerous failures of the System 7 Contact Data Logger, see Licensee Event Reports NP-33-79-71, NP-33 58, NP-33-79-46, and NP-33-79-30.

I2R #79-134 i840 092