ML19253B043

From kanterella
Jump to navigation Jump to search
Forwards LER 79-015/03X-1
Date released: 09/24/2019 Download: ML19253B043


LER 79-015/03X-1:on 790315,during Load Reduction & Shutdown, Rod Sequence Control Sys Failed to Pass Operations Surveillance Test F-ST-23A.Cause Unstated.Mode Switch Moved from Shutdown Position.Sys Repaired
ML19253B047
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/11/1979
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B047 (2)
Forwards LER 79-015/03X-1
ML19253B042
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/11/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B042 (1)