ML19250B972

From kanterella
Jump to navigation Jump to search
Forwards LER 79-087/01T-2
Date released: 09/21/2019 Download: ML19250B972


LER 79-087/01T-2:on 791022,verification of Computer Analysis Indicated 51 Addl Seismic Restraints Had Safety Factor of Less than Four.Caused by Inadequate Design.Mod 79-6-86G Initiated to Redesign & Repair Affected Seismic Restraints
ML19250B980
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/29/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19250B980 (2)
Forwards LER 79-087/01T-2
ML19250B971
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/30/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19250B971 (1)