MONTHYEARIR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information IR 05000352/20230062024-02-28028 February 2024 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2023006 and 05000353/2023006) IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) IR 05000352/20234012023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) ML20293A1712020-10-19019 October 2020 Information Request to Support Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000352/2020005 and 05000353/2020005) ML20183A3192020-07-0101 July 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000352/2020014 and 05000353/2020014 IR 05000352/20190062020-03-0303 March 2020 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2019006 and 05000353/2019006) ML19254A6312019-09-0909 September 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000352/2020401 and 05000353/2020401 IR 05000352/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000352/2019005 and 05000353/2019005) IR 05000352/20180062019-03-0404 March 2019 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2018006 and 05000353/2018006) IR 05000352/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000352/2018005 and 05000353/2018005) IR 05000352/20170062018-02-28028 February 2018 Annual Assessment Letter for Limerick Generating Station-Units 1 and 2 (Report 05000352-2017006 and 05000353-2017006-Report 05000352-2017402 and 05000353-2017402-Report 05000352-2017501 and 05000353-2017501) IR 05000352/20170052017-08-28028 August 2017 Updated Inspection Plan for Limerick Generating Station Units 1 and 2 (Report 05000352/2017005 and 05000353/2017005) IR 05000352/20160062017-03-0101 March 2017 Annual Assessment Letter for Limerick Generating Station Units 1 and 2 - Report Nos. 05000352/2016006 and 05000353/2016006 IR 05000352/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Limerick Generating Station Units 1 and 2 (Report 05000352/2016005 and 05000353/2016005) IR 05000352/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Limerick Generating Station, Units 1 & 2 (Inspection Report 05000352/2015006 & 05000353/2015006) IR 05000352/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2015005 and 05000353/2015005) IR 05000352/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2014001 and 05000353/2014001) IR 05000352/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2014006 and 05000353/2014006 IR 05000352/20130012014-03-0404 March 2014 ROP-14 2013 Limerick Generating Station Annual Assessment Letter for Report 05000352/2013001 and 05000353/2013001, and Inspection Plan IR 05000352/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2013006 and 05000353/2013006 IR 05000352/20120012013-03-0404 March 2013 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2012001 and 05000353/2012001) ML13031A4462013-01-31031 January 2013 Notification of Conduct of Triennial Fire Protection Baseline Inspection ML12248A0252012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Limerick Generating Station IR 05000352/20110012012-03-0505 March 2012 Annual Assessment Letter for Limerick Generating Station (Report 05000352-11-001 and 05000353-11-001) ML1124113542011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Limerick Generating Station IR 05000352/20100012011-03-0404 March 2011 Annual Assessment Letter for Limerick Generating Station, EOC-11 (05000352/2010001 and 05000353/2010001) ML1024405552010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Limerick Generating Station Units 1 and 2 ML1006210902010-03-0303 March 2010 EOC Letter and Report 22 ML0924402372009-09-0101 September 2009 Mid-Cycle Assessment Letter - Limerick Generating Station (September 1, 2009) IR 05000352/20090012009-03-0404 March 2009 Annual Assessment Letter - Limerick Generating Station (05000352-09-001 and 05000353-09-001) ML0824704412008-09-0202 September 2008 2008 Mid-Cycle Assessment Letter and Inspection Plan - Limerick ML0806004312008-03-0303 March 2008 Annual Assessment Letter ML0724305792007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000352/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Limerick Station (05000352-07-001 and 05000353-07-001) IR 05000352/20060012006-03-0202 March 2006 Annual Assessment Letter - Limerick Generating Station (Report 05000352/2006001 and 05000353/2006001) ML0524207032005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Limerick ML0506106412005-03-0202 March 2005 Annual Assessment Letter 2005001 - Limerick ML0406301852004-03-0202 March 2004 2003-04 Annual Assessment Letter - Limerick IR 05000352/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Limerick Generating Station (Report 50-352/03-01, 50-353/03-01) IR 05000352/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Limerick Generating Station (Report 50-352/02-01, 50-353/02-01) 2024-08-29
[Table view] Category:Inspection Report
MONTHYEARIR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 IR 05000352/20240102024-03-18018 March 2024 Biennial Problem Identification and Resolution Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20230062024-02-28028 February 2024 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2023006 and 05000353/2023006) IR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20234012023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 IR 05000352/20230012023-04-28028 April 2023 Integrated Inspection Report 05000352/2023001 and 05000353/2023001 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220042023-02-13013 February 2023 Integrated Inspection Report 05000352/2022004 and 05000353/2022004 IR 05000352/20234022023-02-0707 February 2023 Security Baseline Inspection Report 05000352/2023402 and 05000353/2023402 IR 05000352/20233012023-01-26026 January 2023 Initial Operator Licensing Examination Report 05000352/2023301 and 05000353/2023301 IR 05000352/20220032022-11-0707 November 2022 Integrated Inspection Report 05000352/2022003 and 05000353/2022003 IR 05000352/20224022022-10-18018 October 2022 Security Baseline Inspection Report 05000352/2022402 and 05000353/2022402 IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20224012022-08-0303 August 2022 Material Control and Accounting Inspection Report 05000352/2022401 and 05000353/2022401 (Cover Letter Only) IR 05000352/20220022022-08-0101 August 2022 Integrated Inspection Report 05000352/2022002 and 05000353/2022002 IR 05000352/20220112022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000352/2022011 and 05000353/2022011 IR 07200065/20210012022-06-0909 June 2022 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200065/2021001 and Exercise of Enforcement Discretion IR 05000352/20220012022-05-0404 May 2022 Integrated Inspection Report 05000352/2022001 and 05000353/2022001 IR 05000352/20220102022-03-0909 March 2022 Biennial Problem Identification and Resolution Inspection Report 05000352/2022010 and 05000353/2022010 IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20214012022-02-15015 February 2022 Security Baseline Inspection Report 05000352/2021401 and 05000353/2021401 IR 05000352/20210042022-02-0909 February 2022 Integrated Inspection Report 05000352/2021004 and 05000353/2021004 IR 05000352/20215012021-11-29029 November 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2021501 and 05000353/2021501 IR 05000352/20210032021-11-0404 November 2021 Integrated Inspection Report 05000352/2021003 and 05000353/2021003 IR 05000352/20214202021-10-0404 October 2021 NRC Inspection Report 05000352/2021420 and 05000353/2021420 IR 05000352/20213012021-09-16016 September 2021 Initial Operator Licensing Examination Report 05000352/2021301 and 05000353/2021301 IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20214022021-08-24024 August 2021 Security Baseline Inspection Report 05000352/2021402 and 05000353/2021402 IR 05000352/20210022021-08-10010 August 2021 Integrated Inspection Report 05000352/2021002 and 05000353/2021002 IR 05000352/20210012021-04-30030 April 2021 Integrated Inspection Report 05000352/2021001 and 05000353/2021001 IR 05000352/20210102021-03-0909 March 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) IR 05000352/20200042021-02-0202 February 2021 Integrated Inspection Report 05000352/2020004 and 05000353/2020004 and Independent Spent Fuel Storage Installation Inspection Report 07200065/2020002 IR 05000352/20200152021-01-0404 January 2021 Temporary Instruction 2515/194 Inspection Report 05000352/2020015 and 05000353/2020015 IR 05000352/20200032020-11-0404 November 2020 Integrated Inspection Report 05000352/2020003 and 05000353/2020003 2024-09-16
[Table view] Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] |
Text
ust 28, 2019
SUBJECT:
LIMERICK GENERATING STATION, UNITS 1 AND 2 - UPDATED INSPECTION PLAN (INSPECTION REPORTS 05000352/2019005 AND 05000353/2019005)
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Limerick Generating Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
NRC Region I plans to conduct inspections per Temporary Instruction 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems, Inspection Procedure 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection, and Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, at your facility during the period.
You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the Reactor Oversight Process be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5337 with any questions you have regarding this letter.
Sincerely,
/RA/
Jonathan E. Greives, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Enclosure:
Inspection Plan cc: Distribution via ListServ
ML19239A144 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCasey JGreives DATE 8/21/19 8/21/19
IP 22 Inspection Activity Plan Report Limerick 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count LM-ACCESS CONTROL, EQUIP PERF, TRAINING 3 1, 2 07/08/2019 07/12/2019 IP 71130.02 000734 Access Control 1, 2 07/08/2019 07/12/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/08/2019 07/12/2019 IP 71130.07 000739 Security Training 1, 2 07/08/2019 07/12/2019 IP 71151 001338 Performance Indicator Verification Material Control and Accountability 1 1, 2 08/18/2019 08/24/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)
ISFSI OPERATIONAL INSPECTION 2 1, 2 08/26/2019 08/30/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants RADIATION SAFETY - REMP 1 1, 2 09/08/2019 09/14/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program DECEMBER 2019 LIMERICK INITIAL EXM FY20 4 1, 2 09/22/2019 09/28/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 12/01/2019 12/07/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
TI-194 Open Phase Condition Inspection - Limerick 2 1, 2 10/07/2019 10/11/2019 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
LIMERICK REQUAL INSP W/ P/F RESULTS 2 1, 2 10/20/2019 10/26/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 10/20/2019 10/26/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP EXERCISE INSPECTION 5 1, 2 11/18/2019 11/22/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 11/18/2019 11/22/2019 IP 71151 001397 Performance Indicator Verification Radiation Safety - RETS & PIV 1 1, 2 12/09/2019 12/13/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.
8/19/2019 12:25:03 PM Enclosure
IP 22 Inspection Activity Plan Report Limerick 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count Radwaste 1 1, 2 01/06/2020 01/10/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation LM-Access Authorization and Fitness for Duty 3 1, 2 01/06/2020 01/10/2020 IP 71130.01 000733 Access Authorization 1, 2 01/06/2020 01/10/2020 IP 71130.08 000740 Fitness For Duty Program CYBER FULL IMP 4 1, 2 01/13/2020 01/17/2020 IP 71130.10P 000741 Cyber Security 1, 2 01/27/2020 01/31/2020 IP 71130.10P 000741 Cyber Security Radiation Safety - ALARA 1 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 10 CFR 50.69 Implementation Inspection 4 1, 2 02/10/2020 02/14/2020 IP 37060 000521 IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems 1, 2 02/24/2020 02/28/2020 IP 37060 000521 IP 37060, "10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems Radiation Safety - Rad Haz 1 1, 2 03/30/2020 04/03/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/30/2020 04/03/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/30/2020 04/03/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation ISI - UNIT 1 1 1 04/06/2020 04/10/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
PI&R Biennial Team Inspection 4 1, 2 06/08/2020 06/12/2020 IP 71152B 000747 Problem Identification and Resolution 1, 2 06/22/2020 06/26/2020 IP 71152B 000747 Problem Identification and Resolution 50.59 INSPECTION 3 1, 2 07/20/2020 07/24/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.
8/19/2019 12:25:03 PM
IP 22 Inspection Activity Plan Report Limerick 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count LIMERICK EP PROGRAM INSPECTION 1 1, 2 09/07/2020 09/11/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 09/07/2020 09/11/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 09/07/2020 09/11/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/07/2020 09/11/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 09/07/2020 09/11/2020 IP 71151 001397 Performance Indicator Verification PROGRAM INSPECTION 3 1, 2 09/14/2020 09/18/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
1, 2 09/28/2020 10/02/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
Radiation Safety - Airborne 1 1, 2 09/14/2020 09/18/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Access Control, Protective Strategy, TSR 4 1, 2 10/05/2020 10/09/2020 IP 71130.02 000734 Access Control 1, 2 10/05/2020 10/09/2020 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 10/05/2020 10/09/2020 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 10/05/2020 10/09/2020 IP 71151 001338 Performance Indicator Verification FY21 LIMERICK INITIAL OL EXAM 4 1 11/08/2020 11/14/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 12/06/2020 12/12/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
TRIENNIAL HEAT SINK 1 1, 2 11/16/2020 11/20/2020 IP 71111.07T 000700 Heat Sink Performance Radiation Safety - Dose & PIV 1 1, 2 12/14/2020 12/18/2020 IP 71124.04 000728 Occupational Dose Assessment DESIGN BASIS ASSURANCE INSPECTION - TEAM 6 1, 2 01/24/2021 01/30/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 02/07/2021 02/13/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
Radiation Safety - Instruments 1 1, 2 02/15/2021 02/19/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.
8/19/2019 12:25:03 PM
IP 22 Inspection Activity Plan Report Limerick 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count INSERVICE INSPECTION - UNIT 2 1 2 05/02/2021 05/08/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Radiation Safety - Rad Hazards 1 1, 2 05/03/2021 05/07/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.
8/19/2019 12:25:03 PM