Forwards IE Insp Rept 50-266/79-17 on 791015-19.No Noncompliance Noted
ML19211D081
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/21/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19211D082 List:
References
NUDOCS 8001160322
Download: ML19211D081 (2)


See also: IR 05000266/1979017

Text

  1. g r asaq

g

'o

UNITED STATES

lN-

/o

NUCLEAR REGULATORY COMMISSION

$ . h~ ) 'D ' E

REGION 111

o, I

[

799 ROOSEVELT ROAD

% ' . . . .

e

GLEN ELLYN, ILLINols 60137

NOV 211979

Docket No. 50-266

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the inspection conducted by Mr. K. R. Baker of this office

on October 15-19, 1979, of activities at Point Beach Nuclear Power Plant,

Unit 1 authorized by NRC Operating License No. DPR-24 and to the discus-

sion of our findings with Mr. G. Reed at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

1755

193

86 1160 3h

0

.

NOV 2 J s/9

Wisconsin Electric Power

-2_

Company

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R FLU N Vw

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection

Rpt. No. 50-266/79-17

cc w/ encl:

Mr. G. A. Reed, Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Sandra A. Bast, Lakeshore

Citizens for Safe Energy

1755

194