ML19208D687

From kanterella
Jump to navigation Jump to search
Submits Results of Insp of Normally Accessible safety-related Sys as Required by IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys.
ML19208D687
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1979
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
3--3-A-3, 3-0-3-A-3, NUDOCS 7909290322
Download: ML19208D687 (2)


Text

-

'J " .

., T K1 O

  • gincu m o J y,O o *, U s.N R c : m

. T' m T/.

a "* $

1SFP 4 AIA : 5 'l Florida Power coneonariom August 31, 1979 File: 3-0-3-a-3 Mr. J. P. O'Reilly Director U.S. Nuclear Regulatory Commission Of fice of Inspection & Enforcement Suite 3100 101 Marietta Street Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Bulletin 79-14

Dear Mr. O'Reilly:

ltem 2 of IE Builletin 79-14 required that Floride Power Corporation submit by August 31, 1979, a description of the t'.4W r- .,c our inspection of the Crystal River Unit 3.normally accessible safety-related .,ystems at As stated in our letter of August 23, 1979, FPC was utilizing an unplanned outage at CRd3 to inspect the inaccessible safety-related systems located inside the Containment Building, which would delay completion of our inspection of the accessible safety-related systems.

As of September 1,1979, the inspection of the inaccessible safety-related systems at CR#3, as defined in our Inspection Program and our exemption pleted. requests dated August 23, 30, and 31,1979, should be com-inspected.Of the approximate 2,200 accessible supports, 1,616 have been The inspection of the remaining accessible supports is scheduled to be completed by the latter part of September. A report summarizing the results of our inspection of both the accessible and inaccessible systems at CR#3 will be submitted as soon as possible following October 30, completion 1979. of our inspection program and no later than 7309299 3 1056 051 General Office 320i inirty-fourtn street soutn . P O Box 14042. S* PetersL; g Fionca 3

. ~

Mr. J. P. O'Reilly Page Two August 31, 1979 If you require any further discussion concerning our response, please contact this office.

Very truly yours, FLORIDA POWER CORPORATION de.kW W. P. Stewart Manager Nuclear Operations ECSekcF07(D5) 1056 052