ML18127B273
From kanterella
Jump to navigation
Jump to search
ML18127B273 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 01/14/1989 |
From: | Combustion Engineering |
To: | Florida Power & Light Co, Office of Nuclear Reactor Regulation |
References | |
8770-1187, Rev 3 | |
Download: ML18127B273 (1) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Drawing
MONTHYEARL-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024
[Table view]Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results ML20268A1322020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20268A1262020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML20268A1292020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML20268A1222020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5A, Section 3, Intermediate Zone ML20268A1212020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2.5A, Boring Logs & Data Summaries ML20268A1282020-09-11011 September 2020 Amendment 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML18123A2442018-05-13013 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 5 ML18127A9062018-05-0707 May 2018 Drawing SK-8770-AS-154, Sheet 1, Neutron Shield, Water Bag Support Steel Framing ML18127B3742018-05-0707 May 2018 Drawing 8770-G-272, Main One Line Wiring Diagram ML18127B3422018-05-0707 May 2018 Drawing 8770-C-227, Sheet 1, Reactor Audiliary Building Instrument Arrangement ML18127B4832018-05-0707 May 2018 Drawing 8770-G-078, Sheet 110B, Flow Diagram, Reactor Coolant System ML18127A9082018-05-0707 May 2018 Drawing SK-8770-AS-154, Sheet 2, Neutron Shield - Water Bag Support Steel Framing ML18127A9172018-05-0707 May 2018 Figure 10.4.9B-5, Fault Tree of SB - Manual. ML18127B4592018-05-0707 May 2018 Drawing 8770-G-149, Sheet 2 of 2, Main Steam & Feedwater Piping - Sect & Details ML18127A9222018-05-0707 May 2018 Figure 2.1-4, Property Plan. ML18127B3442018-05-0707 May 2018 Drawing 8770-G-394, Typical Auxiliary Building Cable Tray and Conduit Runs. Sheet 1 ML18127B3432018-05-0707 May 2018 Drawing 8770-G-227, Reactor Auxiliary Building Instrument Arrangement. Sheet 3 ML18127A9052018-05-0707 May 2018 Figure 1.2-15, Drawing 8770-G-072, Sheet 1, General Arrangement, Reactor Auxiliary Building Sections ML18127B3462018-05-0707 May 2018 Drawing 8770-G-393, Typical Reactor Auxiliary Building Cable Tray and Conduit Runs. Sheet 3 ML18127B3452018-05-0707 May 2018 Drawing 8770-G-392, Typical Reactor Auxiliary Building Cable Tray and Conduit Runs. Sheet 2 ML18123A2482018-05-0303 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 40 ML18123A2332018-05-0303 May 2018 Figure 7.3-3, ESFAS Actuation Cabinet Schematic Diagram ML18123A2472018-05-0303 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 36 ML18123A2412018-05-0303 May 2018 Stress Model Drawing of Finite Element Analysis for Flued Head, Penetration Number 1 & 2 ML18123A2462018-05-0303 May 2018 Stress Model Drawing of Final Element Analysis for Flued Head, Penetration Number 26 ML16116A1572016-03-17017 March 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 58, Sheet 2B L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 58, Sheet 2B2016-03-17017 March 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 58, Sheet 2B ML16116A1502016-01-28028 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-082, Rev. 56, Sheet 1 ML16116A1552016-01-28028 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-087, Rev. 39, Sheet 1 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-087, Rev. 39, Sheet 12016-01-28028 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-087, Rev. 39, Sheet 1 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-082, Rev. 56, Sheet 12016-01-28028 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-082, Rev. 56, Sheet 1 ML16116A1452016-01-12012 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-19729, Rev. 3 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-19729, Rev. 32016-01-12012 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-19729, Rev. 3 ML16116A1592016-01-0606 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 32, Sheet 3 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 32, Sheet 32016-01-0606 January 2016 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-085, Rev. 32, Sheet 3 ML16116A1662015-12-30030 December 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-862, Rev. 33 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-862, Rev. 332015-12-30030 December 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-862, Rev. 33 ML16116A1422015-12-0404 December 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-21367, Rev. 3 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-21367, Rev. 32015-12-0404 December 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-21367, Rev. 3 ML16116A1272015-11-12012 November 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 1 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 12015-11-12012 November 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 1 ML16116A1282015-10-26026 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-149, Rev. 17, Sheet 2 of 2 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-149, Rev. 17, Sheet 2 of 22015-10-26026 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-149, Rev. 17, Sheet 2 of 2 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-078, Rev. 13, Sheet 111B2015-10-26026 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-078, Rev. 13, Sheet 111B ML16116A1392015-10-26026 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-078, Rev. 13, Sheet 111B ML16116A1292015-10-21021 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 3509-G-115, Rev. 26, Sheet 2 L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 3509-G-115, Rev. 26, Sheet 22015-10-21021 October 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 3509-G-115, Rev. 26, Sheet 2 L-2016-085, St. Lucie, Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-079, Rev. 4, Sheet 72015-10-19019 October 2015 St. Lucie, Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-079, Rev. 4, Sheet 7 ML16116A1212015-10-19019 October 2015 St. Lucie, Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-079, Rev. 4, Sheet 7 2024-10-15 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18127B273&oldid=1257460"