ML18095A408

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Accident Monitoring Instrumentation
ML18095A408
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/08/1990
From:
Public Service Enterprise Group
To:
Shared Package
ML18095A407 List:
References
NUDOCS 9008130231
Download: ML18095A408 (6)


Text

  • ** *  :

TABlf 3.3-11 (Cont1nued)

ACCllINT MONITORING INSTRlJtENTATION I

REQUIRED MINIHllt NO. OF NO. OF I INSTRlltENT CHANNELS CHANNELS ACT ION

13. PORV Block Valve Postt1on Indicator 2/va 1ve** 1 1. 2
14. Pressurizer Safety Valve Position 2/valve** 1 1. 2

-Indicator

15. Containment Pressure - NarrClll Range 2 1 1, 2

~6. Containment Pressure - Wide Range 2 1 1. 2

17. Containment Water lsvel -
  • 2 I 1. 2 W1de Range w

I U1

18. Core Extt Thef'llOcouples 4/core quadrant 2/core quadrant 1, 2 VI
19. Reactor Vessel lsvel lnstrwaentation 2 1 Syste11 (AVUS)

(*) Total AYlllb@F ~AA@h ii GQA,ld@r@d tg b@ twg (2) witb OAR (') of the 'bHAUh; b@iA~ PldfHht) ealeul at tefl ltY J teeAHll &eAtrel FHUll p@FSRAA&l Y&1 A~ 4itl fro11 OpfPABI F wjde range R&illi l8F G~el aflt Preuatre aftli Tempenhre al BR! "'th §tealft Tahles a5 tieserihell iA AGT H~N ta.

(**)Total nUl!ber of channels to be two (2) w1th one (I) of the channels be1ng any one (1) of the follC111tng alternate means of detenatning PORV. PORV Block. or Safety Valve pos1t1on: Tailpipe 2..

Te~eratures for the valves. ,.ressurtzer Relief Tank Te1Jt>erature Pressurizer Reltef Tank leve~erabi::Y- .

-:Cu sc RT f} OPE'1.AaLf"

INSERT A

(***) Action 8 remains in effect until startup from the 10th refueling outage at which time, PSE&G will install the upgraded RVLIS. Upon expiration, Actions 1 and 2 will apply .

ATTACHMENT 2 TAB L£ 3.3-11 (Continued)

ACCllINT MONITORING INSTRlHENTATJON REQUIRED MINIMlH c: NO. OF NO. OF z INSTRlltENT CHANNELS H

8 CHANNELS ACT ION

13. PORV Block Valve Pos1tion Indicator 2/va Ive** l l, 2
14. Pressurizer Sifety Valve Position* 2/va Ive** l I, 2 Indicator
15. Containment Pressure - Narrmii1 Range 2 I 1. 2 w . 16. Containment Pressure - Wide Range 2 I 7. 2

~

17. Containment Water Level - 2 1 7, 2 w

I Wide Range Ul

~

Pl 18. Core Exit Thermocouples 4/core quadrant 2/core quadrant 1, 2

19. Reactor Vessel Level lnstruaentat1on System (RVLIS) 2 1 ~8***
) 2.

(*)Total 11uH1~eF of d1an11els is eeRs1~eFe~ te 8e t~*a (2) ~*H~ aRe (l) ef Hie cRaRRels 8e1A!J 1rtaf111t1l calcuJatjon by lh:ensed coatro] roQPI personnel using ditta trow oprnAB![ wide r1rngo lloa,tgr '99hAt

- PFeS&YFe aR4 Te~p@ralwre aleA9 w1l~ ~team Ta~le& a& 4e&er1be4 ie AtTION 5,

(**) Total number of channels is considered to he two (2) with one (l) of the channels bein9 any one (I) of the following alternate means of determining PORV, PORV Block, ,.or Safety Valve position:

Tailp~e Tem~t~es for the valves, Pressurizer Relief Tank Temperature Pressurizer Relief Tank Level perab e _

t - OP~(2.At3LE:.

.INS-12.1 ft

-~

INSERT A

(***) Action 8 remains in effect until startup from the 6th refueling outage at which time, PSE&G will install the upgraded RVLIS. Upon expiration, Actions 1 and 2 will apply .

~.{;~* *, ' *' r.

  • ACTION 1 UBL£ 3.3-11-(continued)

TAB LE NOTArrON Wfth the number of OPERABLE accident monftoring channels less tnan ~ne Requf~~d Number of Channels snown fn Table 3.J-11, restore the inoperable channtl(s) to OPERABLE status wfthfn 7 days, or be in HOr SHUTOOWN w1thf n the next 12 nours.

ACTION 2 Wf th the number of OPERABLE accf rlent rnonftorf ng channels less than ~ne Mfnfmum Numeer of Channels shown f n Table 3.3-11, restore the inoperable channel(s) to OPERABLE statys .,,ftnfn 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in 1or SHUTOOWN w1tti1n the next 12 nours.

ACTION 3 Wfth the number of OPERABLE channels one less than the Requf red Number of Channels shown f n Table 3.3-11, operation '"'Y proceed provf ded tnat the Borf c Acf d Tank assocfated wfth th* re1n1fnf ng OPERABLE channel sat1sffes all requfrements of Specfffcatfon J.1.2.a.1.

ACTION 4 With the number of OPERABLE channels one l=ss th&R tht Requfred Number of Ch1nn1ls ihown f n iablt 3.3-11, operatfon may proceed provided tnat an OPERABLE Steam Generator Wfdt Range 1.avel channel fs available as an alttrnate means of fndfcatfon for the St1am G1n1rator wfth ao Of>£RA6LE..~Auxi11ary Fee~ater Flow Rat1 Channel.

  • ACTION 5 With the number of OPERABLE channels less than the Required Number : f Channels shown f n Tablt 3.3-11, operatfon may proceed provided tnat Steam Tables are available in the Control Room and the following Required Channels shown f n Table 3.3-11 are OPERABLE to provide an alternate means of calculating Reactor Coolant System subcoolf ng margin:
a. Reactor Coolant Outlet T~erature
  • THOT (Wf de Range)
b. Rtactor Coolant Pressure (Wf de Range)
  • UNIT 2 3/4 3-Slb