Public Service Electric and Gas Company Corbin A. McNeill, Jr.
Vice President -
Public Service Electric and Gas Company P.O. Box236, Hancocks Bridge, NJ 08038 609 339-4800 Nuclear September 30, 1986 NLR-N86122 Dr. Thomas E. Murley, Regional Administrator Reg ion I
- u. s. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Dear Dr. Murley:
CYCLE 4 RADIAL PEAKING FACTOR LIMIT REPORT FACILITY OPERATING LICENSE DPR-75 UNIT NO. 2 SALEM GENERATING STATION DOCKET NO. 50-311 Attached is the Salem Unit 2 Cycle 4 Peaking Factor Limit Report which has been prepared by Westinghouse in accordance with the Westinghouse Methodology "Power Distribution Control and Load Following Procedure, WCAP-8385, September 1974".
PSE&G has reviewed this report and concurs with the proposed limits.
Attachments 8610270266:-S60930 PDR* ADOCK. 05000311'.
p PDR Sincerely,
Dr. Thomas E. Murley C
Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector 2
Director of Nuclear Reactor Regulation Attention Chief -
Core Performance Branch 9-30-86
! L eu 86-289 9/2/86 Radial Peaking Factor Limit Report This Radial Peaking Factor Limit Report is provided in accordance with Paragraph 6.9.1.10 of the Salem Unit 2 Nuclear Plant Technical Specifications.
The Fxy limits for RATED THER~~l POWER within specific core planes for Cycle 4 shall be:
- 1.
For all core planes containing bank 110 11 control rods; "FRTP
< 1.99 for all core elevations xy.
- 2.
For all u_nrodded planes; FRTP
< 1. 62 for core e 1 eva t ions up to 2. 5 ft., and xy *-
FRTP
< 1.67 for core elevations from 2.S to 9.0 ft.
F~rP
<*l.63 for core elevations from 9.0 to 12.0 ft.
These Fxy({) limits were*used to confirm that the heat flux hot channel factor FQ(z) will be limited to the Technical Specification values of:
FQ(z) ! C2p32)
[K(z)J FQ(z) ! [4.64]
[K(z)]
for P > 0.5 and, for P < 0.5 assuming the most limiting axial po~~r distributions expected to result from the insertion and removal of control banks C and D during operation.
including the accompanying variations* in the axial xenon and power distri-butions as described in the "Power "Distribution Control and Load Following Procedures". WCAP-8385. September. 1974.
Therefore, these Fxy limits provide assurance that the initial conditions assumed in the LOCA analysis are met, along with the ECCS acceptance criteria of 10CFRS0.46.
See Figure l for a plot of [FQT.pRel] vs. Axial Core Height *
' ' ~
........... ~f).,.* *.......,.. -...,.,,
N Au 86-289