- consumers Power POW ERi Nii MICHlliAN-S PIUllilfBS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 20, 1995 Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT KurtM. Haas Plant Safety and Licensing Director WITHDRAWAL OF COMMITMENT TO CONDUCT STARTUP TRAINING FOR OUTAGES GREATER THAN lOQ DAYS - SALP 5 - RESPONSE COMMITMENT In response to the SALP 5 report dated May 16, 1985, Consumers Power committed to sending the Palisades licensed operators to simulator training on plant startups if an outage was greater than 100 days.
The purpose of this letter is to withdraw that commitment.
The original concern addressed by the commitment was that the extended outage in 1984 may have negatively affected operator familiarity with the power operations mode.
The Palisades' simulator was located at the Midland Training Center at Midland, Michigan in 1985.
At that time, operators normally spent one week per year (or two weeks if there was an extended outage) at the simulator.
The Palisades simulator has since been relocated to the Palisades site.
Simulator training has become a routine part of operator requalification training with the relocation of the simulator. Operators attend training every six weeks, including outages. This training routinely includes time on the simulator running power operating mode scenarios.
.. The-commitment is being withdrawn becaus*e sfmulator training on plant operations has become a routine part of operator requalifications training and proficiency in power operation is maintained as part of the training.
No response is required.
~--------~-~-r-l~~~
9507250016 950720: ,;_.'.;',.
PDR ADOCK 05000255 V
PDR l
A CMS' ENERGY COMPANY
SUMMARY
OF COMMITMENTS This letter contains no new commitm~nts and withdraws one commitment to conduct startup training on the simulator when outages exceed 100 days.
~.A,~~~
Kurt M Haas.
Plant Safety and Licensing Director CC Administrator, Region Ill, USNRC P~oject Manage~, NRR, USNRC NRC Resident Inspector - Palisades 2