ML18054A893

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 4.2.2, Min Frequencies for Equipment Tests
ML18054A893
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/02/1989
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18054A892 List:
References
NUDOCS 8908100220
Download: ML18054A893 (4)


Text

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGES 89b8100220 890802 PDR ADOCK 05000255 P

PDC TSP0789-0150-NL04

\\\\

l \\'

August 2, 1989 1 Page

Table 4.2.2 Minimum Frequencies for Equipment Tests

1.

Control Rods

2.

Control Rods

3.

Pressurizer Safety Valves

4.

Main Steam Safety Valves

5.

Refueling System Interlocks

6.

Service Water System Valve Actuation (SIS-CHP)

7.

Fir~ Prot~ction Pumps and Power Supply

8.

Primary System Leakage

9.

Diesel Fuel Supply

10.

(Deleted)

TSP0789-0150-NL04 Test Drop Times of All Full-Length Rods Partial Movement of All Rods (Minimum of 6 In)

Set Point Set Point Functioning Functioning Functioning Evaluate Fuel Inventory 4-15 Frequency Each Re-fueling Shutdown Every Two Weeks One Each Refueling Shutdown Five Each Refueling Shutdown Prior to Refueling Operations Each Re-fueling Operation Monthly Daily Daily FSAR Section Reference 7.4.1.3 7.4.L3 7.3.7 4.3.4 9.11.3 9.1. 2 9.6.2 4

Amend 15, Ques 4.3.7 8.4.1 Amendment No ll, Sl, I

TSP0789-0150-NL04 ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE August 2, 1989 1 Page

... *.*.,. ~ -......

Table 4.2.2 Minimum Frequencies for Equipment Tests 1 *. Control Rods

2.
3.
4.
5.
6.
7.

Control Rods Pressurizer Safety Valves Main Steam Safety Valves Refueling System

(SIS-CHP)

Fire Protection

  • Pumps and Power Supply
8.

Primary System Leakage TSP1086-0147A-NL04 Test Drop Times of All Full-Length. Rods Partial Movement of All Rods (Minimum of 6 In)

Set Point Set.Point Functioning Functioning Functioning Evaluate Frequency Each Re-fueling Shutdown Every Two Weeks One Each Refueling Shutdown Five Each Refueling Shutdown

  • *
  • Prior to Refueling Operation_!;J Each Re-fueling Operation Monthly Daily
  • Fs*AR Section Reference 7.4.1.3 7.4.l'.3.

7.3.7 4.3.4':'

9.11.l 9*. l. 2*

9.6.2 4

Amend 15,"

Ques 4.3.* 7 Daily*

8.4;1

  • E:!f::Y
  • .~*

I 4-15 Amendment No

.-~