Monthly Operating Rept for Dec 1988 for Palisades Nuclear Plant
ML18054A487
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1988
From: Goralski G, Packard G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8901180267
Download: ML18054A487 (5)


Text

T' OPERATING DATA REPORT OPERATING STATUS

1.

Unit Name: Palisades


~"--------------

2.

Reporting Period:

881201-881231

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Cross MWe):

811.7

5.

Design Electrical Rating (Net HWe):

805

6.

Maximum Dependable Capacity (Cross HWe): **770

7.

Maximum Dependable Capacity (Net HWe):

    • 730 DOCKET NO ___

,......::;..50=--....:2:;.:;5...:;.5 DATE __

....;;;o...:;.1_-0;:;..;5;_-....;;;8...:;.9 COMPLETED BY

~-C.;;;-C.;;;..;P;;..;a.;;;..;c,_k""a;;.;r~d TELEPHONE (616)764-8913 NOTES

8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net HWe):

10.

Reasons for Restrictions, if any: -------------------------

This Month Yr-to-Date

11.

Hours In Reporting Period 744.0 81784.0

12. *Number of Hours Reactor Was Critical 279.4 41990.4
13. Reactor Reserve Shutdown Hours
14.

Hours Generator On-Line 266.7 41855.9

15.

Unit Reserve Shutdown Hours

16.

Cross Thermal* Energy Generated (MWH) 4541344.0 1113631088

17.

Gross Electrical Energy*Cenerated (HWH) 1431380.0 316301965

18.

Net Electrical Energy Generated (HWH) 1321906.0 314351215

19. Unit Service Factor 35.8 55.3
20. Unit Availability Factor 35.8 55.3
21.

Unit Capacity Factor (Using MDC Net) 24.5 53.6

22.

Unit Capacity Factor (Using DER Net) 22.2 48.6

23.

Unit Forced Outage Rate 64.2 20.2

24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of

25. If Shut Down at End of Report Period, Estimated Date of Start Up:
26.

Units in Test Status (Prior to Conmercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03 P8901180267 881231 RDR ADOCK 05000255 PNU Cumulative 1491343.0 791007.4 751122.1 15815511005 4915441485 4616521249 50.3 50.3

  • 48.1 38.8 35.1 Each):

Achieved

e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ___

.;;;..50;;;...--:2:..::5...::;.5 UNIT Palisades

- -DATE 01-05-89 COMPLETED BY --G-=C..:.P-ac::..:ka:...-=r:.::.d TELEPHONE (616)764-8913 MONTH __

D_E_C_EH_BE..;.;R;.;;.......;;l;..;;.9...;;;.8..;;..8 __ _

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)

(HWe-Net) 1 202 17 0

2 225 18 0

3 229 19 0

4 337 20 0

5 654 21 0

6 73 22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 218 11 0

27 642 12 0

28 729 13 0

29 733 lA -

-o-30 740 15 0

31 755 16 0

INSTRUCTIONS:

On this format, list the average daily unit power level in HWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP03

REPORT MONTH DECEMBER 1988 No.

Date Type1 22 881206 F

1.
2.

F:

Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 477.3 A

Reason:

A-Equipment Fail'ure (Explain)

B-Maintenance or' Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Err.or (Explain)

H-Other (Explain):

\\

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee System Component Shutting Event Code4 Code5 Down Reactor3 Report I 1

88-012 (Rev 2)

3.

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

DOCKET NO. _____

5_0_-2'--5""'"5 UNIT NAME ____

P"'"'"a l_i""""s"'""'ad;;...;;e~s DATE ____

0'""'1--0-'-'5--8=9 COMP LET ED BY -----'G""""'C_P a'"""c'-k-'-ar~d TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Tube leak in "B" Steam Generator

5.

Exhibit I - Same Source

\\~1 f;.. I 1'* *

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER, 1988 The plant escalated to 93% power and was holding at this power level to allow evaluation and monitoring of core peaking factors.

The plant shutdown on December 6, at 0648 hours0.0075 days <br />0.18 hours <br />0.00107 weeks <br />2.46564e-4 months <br /> as a result of a primary-to-secondary leak in the 8 Steam Generator.

The plant returned to critical on December 25, at 1523 hours0.0176 days <br />0.423 hours <br />0.00252 weeks <br />5.795015e-4 months <br /> and online December 26, at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br />.

The plant escalated to approximately 97% power and remained at this power level through the end of the reporting period for further evaluation and monitoring of core peaking' factors.

OC0185-0001E-OP03

consumers Power l'OWERIN&

MICHl&AN-S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Coven. Ml 49043 January 5, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Sunmary of Operating Experience for the Palisades Nuclear Plant for the month of December, 1988.

~~

George Goralski Reactor Engineer CC: DPHoffman, P26-1178 ICMlfaas, Palisades A8Davis, USNRC.

KW8erry, P24-6148*

CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Comnission Record_!i C_~n.t~l'.,_ INPO,.Atlanta,- GA

    • -- -- RwTay-lor, CE, Pali sades AAAlatalo, Palisades LLBumb, P21-324 G8Szczotka, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP89*001 OC0185-0001A-OP03