T' OPERATING DATA REPORT OPERATING STATUS
- 1.
Unit Name: Palisades
~"--------------
- 2.
Reporting Period:
881201-881231
- 3.
Licensed Thermal Power (MWt):
2530
- 4.
Nameplate Rating (Cross MWe):
811.7
- 5.
Design Electrical Rating (Net HWe):
805
- 6.
Maximum Dependable Capacity (Cross HWe): **770
- 7.
Maximum Dependable Capacity (Net HWe):
- 730 DOCKET NO ___
,......::;..50=--....:2:;.:;5...:;.5 DATE __
....;;;o...:;.1_-0;:;..;5;_-....;;;8...:;.9 COMPLETED BY
~-C.;;;-C.;;;..;P;;..;a.;;;..;c,_k""a;;.;r~d TELEPHONE (616)764-8913 NOTES
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
- 9.
Power Level to Which Restricted, if any (Net HWe):
- 10.
Reasons for Restrictions, if any: -------------------------
This Month Yr-to-Date
- 11.
Hours In Reporting Period 744.0 81784.0
- 12. *Number of Hours Reactor Was Critical 279.4 41990.4
- 13. Reactor Reserve Shutdown Hours
- 14.
Hours Generator On-Line 266.7 41855.9
- 15.
Unit Reserve Shutdown Hours
- 16.
Cross Thermal* Energy Generated (MWH) 4541344.0 1113631088
- 17.
Gross Electrical Energy*Cenerated (HWH) 1431380.0 316301965
- 18.
Net Electrical Energy Generated (HWH) 1321906.0 314351215
- 19. Unit Service Factor 35.8 55.3
- 20. Unit Availability Factor 35.8 55.3
- 21.
Unit Capacity Factor (Using MDC Net) 24.5 53.6
- 22.
Unit Capacity Factor (Using DER Net) 22.2 48.6
- 23.
Unit Forced Outage Rate 64.2 20.2
- 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of
- 25. If Shut Down at End of Report Period, Estimated Date of Start Up:
- 26.
Units in Test Status (Prior to Conmercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure Forecast
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
OC0185-0001B-OP03 P8901180267 881231 RDR ADOCK 05000255 PNU Cumulative 1491343.0 791007.4 751122.1 15815511005 4915441485 4616521249 50.3 50.3
- 48.1 38.8 35.1 Each):
Achieved
e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ___
.;;;..50;;;...--:2:..::5...::;.5 UNIT Palisades
- -DATE 01-05-89 COMPLETED BY --G-=C..:.P-ac::..:ka:...-=r:.::.d TELEPHONE (616)764-8913 MONTH __
D_E_C_EH_BE..;.;R;.;;.......;;l;..;;.9...;;;.8..;;..8 __ _
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(HWe-Net) 1 202 17 0
2 225 18 0
3 229 19 0
4 337 20 0
5 654 21 0
6 73 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 218 11 0
27 642 12 0
28 729 13 0
29 733 lA -
-o-30 740 15 0
31 755 16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in HWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
OC0185-0001C-OP03
REPORT MONTH DECEMBER 1988 No.
Date Type1 22 881206 F
- 1.
- 2.
F:
Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 477.3 A
Reason:
A-Equipment Fail'ure (Explain)
B-Maintenance or' Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Err.or (Explain)
H-Other (Explain):
\\
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee System Component Shutting Event Code4 Code5 Down Reactor3 Report I 1
88-012 (Rev 2)
- 3.
Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
DOCKET NO. _____
5_0_-2'--5""'"5 UNIT NAME ____
P"'"'"a l_i""""s"'""'ad;;...;;e~s DATE ____
0'""'1--0-'-'5--8=9 COMP LET ED BY -----'G""""'C_P a'"""c'-k-'-ar~d TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Tube leak in "B" Steam Generator
- 5.
Exhibit I - Same Source
\\~1 f;.. I 1'* *
SUMMARY
OF OPERATING EXPERIENCE FOR DECEMBER, 1988 The plant escalated to 93% power and was holding at this power level to allow evaluation and monitoring of core peaking factors.
The plant shutdown on December 6, at 0648 hours0.0075 days <br />0.18 hours <br />0.00107 weeks <br />2.46564e-4 months <br /> as a result of a primary-to-secondary leak in the 8 Steam Generator.
The plant returned to critical on December 25, at 1523 hours0.0176 days <br />0.423 hours <br />0.00252 weeks <br />5.795015e-4 months <br /> and online December 26, at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br />.
The plant escalated to approximately 97% power and remained at this power level through the end of the reporting period for further evaluation and monitoring of core peaking' factors.
OC0185-0001E-OP03
consumers Power l'OWERIN&
MICHl&AN-S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Coven. Ml 49043 January 5, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Sunmary of Operating Experience for the Palisades Nuclear Plant for the month of December, 1988.
~~
George Goralski Reactor Engineer CC: DPHoffman, P26-1178 ICMlfaas, Palisades A8Davis, USNRC.
KW8erry, P24-6148*
CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Comnission Record_!i C_~n.t~l'.,_ INPO,.Atlanta,- GA