ML18009A627

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1990 for Harris Nuclear Power Plant,Unit 1
ML18009A627
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/1990
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-903024-(O), NUDOCS 9008170019
Download: ML18009A627 (9)


Text

ACCELERATED DI TRIBUTION DEMONSTRATION SYSTEM I

4 ~

h REGULATORY INFORMATION DIS/RIBUTION SYSTEM (RIDS)

ACCESSION NBR:9008170019 DOC.DATE: 90/07/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power ~Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light Co.

RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECXPIENT AFFILIATION DOCKET. 4 05000400

SUBJECT:

Monthly operating rept for Jul 1990 for Harris Nuclear Power Plant, Unit 1.W/900813 ltr.

DISTRXBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech 'Specs)

NOTES:Application for permit renewal filed.

o5ooo4oo RECIPXENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL ACRS AEOD/DSP/TPAB 8~&%

PEB10 REG XLE 01 EXTERNAL: EG&G BRYCE,J.H'RC PDR COPIES LTTR ENCL 3

3 1

1 10 10

'1 1

1 1

1 1

3 3

1 1

RECIPIENT I>D CODE/NAME PD2-1 PD I

AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN2 LPDR NSXC COPIES LTTR ENCL 1

1 1

1

.2 2

1 1

1 1

1 1

1 1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM,DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 29 ENCL 29

Carolina Power 8 Light Company P. O. Box t65 ~ New Hill, N. C. 27662 R. B. AICHEY Manager Hants Nuclear ProJect AUG 1 3 1990 File Number:

SHF/10-15505 Letter Number:

HO-903024 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1990.

Yours very truly, R. B. Richey Manager Harris Nuclear Project MWH:mbr Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J ~ E. Tedrow (NRC-SHNPP) 9008170019 900731 PDR ADOCK 05000400 R

PDC MEM/DATAREPa/1/OS4

~ h

~

5

~

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

July 1990 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a

100 percent Availability Factor for the referenced month and a 98.42 percent Capacity Factor.

There were two events.

Details are provided on the Unit Sh'utdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 302 spent fuel assemblies in the Spent Fuel Pools.

198 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.

MEM/DATAREPa/1/OS4

)

("f'hL~ CG (SUAN DATL.

08/87/98

~

RLJN

'1'XHE 8Y:14:51 PLANT PERFORNAHCE DA'fA S

rEN OPERA'I'XNG DATA 'EI-'GIST I-IABf(Is LJNX1' PAGE RPD36-008 OPERAT 1 HG Sl'ATUB DOC((ET NO. 858-400 CGHPLEl'ED BY NARI< M. IIALE TELEPHONE (919>362-2944 3

  • 5
  • 6.

7 ~

8.

LJHX'I'AHE:

HAILRXS UNIT REPORTING PERXOD:

JULY 90 LXCENSED Tl-IERHAL POWER (HMT): 2775 NAHI=PLATE RATXNG (GROSS HWL): 950.9 DEBXGH ELECTRlCAL RATlNG

< NEl'ME): 980. 8 HAX DEPEHDABII= CAPACITY (GROSS HME): 920.8 I"IAX DEPEHDABI E CAF'ACITY <NE1'ME): 860.8 II= CHANGES 0(".CUR XN CAI ACITY RATXNGS (XTLNB GIVE flEABOHB: NjA H(31'ES There are 157 fuel assem-blies in the reactor, 302 spent fuel assemblies in Spent Fuel Pools; 198 of the spent fuel assemblies are BWR and were I"'shipped from Brunswick.

3 THRU 7>

sINCE LAsr REI QRr, 9*

18.

I OMER I LVL=.I TQ WHXCH RI=STRXCTLD ll= ANY (NET HME-):

REA 'ONB FOR RESTRXCTIGN IF ANY:

N/A rHIS HQH1'I-I YR TO DATF CUHUL A'I'IVE 2 4

'I 3.

14.

16.

17.

18.

28

~') +')

A A

A 23 I-(OURS XN REPQR'1'XNG PERXOD NUHBLR OF HOURS REACTOR CRITXCAL fLEACTGR RESERVE SI.IUTDOWN HRB HOURS GENE('<ATQIR ON LINE LJHXT flESEflVE S)l.(U'I'DOWN I-(OURS GROSS TIIERHAI ENERGY GEH ~

(HWH)

GflQSS ELEC*

EHEfLGY GEH.

(HMH)

NET ELEC.

EHI=RGY GENI=RATLD (HMH)

UNXT SERVICE FACTOR UNIT AVAILABILX'I'Y FACTOR LJNlT CAF'.

FACTOR

< US1NG HDC NE1')

UNIr CAP.

FAC1GR

<usING DER NI=T>

lJNX1'ORCED GUl'AGE RATE sHurDOMNs sCHED.

OVER NEXT 6 NONrHs 744.88 744.00

.08 744.80

. 8<)

2053864.88 671736.08 629733.00 100.00 188.80 Y8.42 94.05

.88 (TYPE,

DATE, 5887.08 4819.97
  • 88 4882 '8

. 8<)

'l2626753.94 4283549.88 3925814.88 94.48 94*48 BY.72 85.73 2.68 AND DURATXON 28488*00 22817*54

.88 22461.63

.88 59168432.34 19653811.88 18 6318

~ 88 78.85 78.85 74.54 71.23 4.47 OF LACH>:

25*

.)6 X F Sl-ILJTDGMN Al'ND GF REPOR IEF(IGD, EBTXNATED DATE QF S'I'ART lJP:

UNITS XN TEST STATUS (PRXOR TO COHHI=RCXAI QPERATXQN >:

FORECAST A('HlEVLD INITXAL CRXTXCALITY XHXTXAI E'I ECTRXCXTY COHNERCXAL QPERAl'lON MEM/DATAREPa/2/OS4 1.16

i4 ll r

I a 'I 4i II I

I a

~

I

"",gl ai Cu PLANT PERrORHANCE DATA 8 rrH RUQ l)ATE 88/07/98 APPEND1X B AVERAGE 1)AXLY POWER LEVEL RUN TXHI=

(>9: 3 4: 48 HARRXS UNIT I PAGE RPD39-000 JULY 1990 DOCI< ET NO.

850-4(>0 COHPLETED BY HARI< M.

I"IALE TEI EPHONI=

(9$ 9) 362-2944 DAY AVG. DAXI Y POMI=R I EVEI (HWE-NET)

DAY AVG. DAlLY POWER LEVEL (HWE-NE'I')

18

$ 2 861 864 858) 850 8>0 853 7 >7 84(>

850 848 20 22 J2 5 27 28 852 85(>

852 855 853 30 85>3 792 MEM/DATAREPa/3/OS4

l ~

'I

~

~ ~

~

~

~

~

~

~

~

~

I;

~

~

I ~

~

~

I ~

I ~

~ ~

I',

~

I=

~

~

~

I I '

~

~

~

~

~

4

~

I

~

~

~

~

~

~

I

~

~Ia.;

~

~

~

~ '

~

~

V C

I

I ~

~ ~

~

I

~

~

~

I

~

~

~ ~

~

~

I;

~

~

~ ~

~

~

4 ~

I ~

~ ~

~

~

~

t

~

~

~

~

~

~

~ I '.

~ ~

I ~.;

~

~

~

~

~

I

I

~

~

~

~

~

~

I

~ ~

I a

~

I ~.

~

4

~

~

~

~

I ~.

~

~