Forwards Insp Repts 50-250/93-24 & 50-251/93-24 on 930926-1030 & Notice of Violation.Violation of Concern Because It Involves Weakness in Area of Conduct Operation
ML17352A325
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/19/1993
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17352A326 List:
References
NUDOCS 9312140290
Download: ML17352A325 (6)


See also: IR 05000250/1993024

Text

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Nov 1 9 t993

Florida Power

and Light Company

ATTN:

Mr. J.

H. Goldberg

President

- Nuclear Division

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-250/93-24

and 50-251/93-24)

This refers to the inspection

conducted

by Mr . T.

P. Johnson of this office on

September

26 through October 30,

1993.

The inspection

included

a review of

activities authorized for your Turkey Point facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

Inspection Report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation is of concern

because it involves

a

weakness

in the area of conduct of operations

which resulted in an unplanned

reactivity addition due to an inadvertent reactor coolant system over

dilution.

This over dilution resulted

in an unplanned

increase

in reactor

power.

In .addition, the enclosed

Inspection

Report identifies activities that

violated

NRC requirements

that will not be subject to enforcement

action

because

your efforts in identifying and correcting the violation meet the

criteria specified in section VII.B of the Enforcement Policy.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and any additional

actions you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

9312140290

931119

PDR

ADOCK 05000250

8

PDR

Florida Power

5 Light Company

NOV 18 1993

0

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

GRJG~~TAL HGNEP

BY

MARVIN V. S-"'l"Ut:E

Harvin V. Sinkule, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

T.

F. Plunkett, Site Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL 33102

L.

W. Pearce,

Plant General

Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

T. V. Abbatiello, Site equality Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

H. N. Paduano,

Acting Director, Nuclear Licensing

P. 0.

Box 14000

Juno

Beach,

FL

33408

E. J.

Weinkam, Licensing Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Hiami,

FL

33102

cc w/encls:

(Cont'd

on page 3)

0

Florida Power 5 Light Company

NOV18 1993

cc w/encls cont'd:

Harold F. Reis,

Esq.

1615

L Street,

NW

Washington,

D.C.

20036

John T. Butler,

Esq.

Steel,

Hector,

and Davis

4000 Southeast

Financial

Center

Miami,

FL

33131-2398

Attorney General

The Capitol

Tallahassee,

FL

32304

Jacob Daniel

Nash

Office of Radiation Control

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

Administrator

Department of Environmental

Regulation

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin

Avino

County Manager of Metropolitan

Dade County

111

NW 1st Street,

29th Floor

Miami,

FL

33128

Intergovernmental

Coordination

and Review

The Capitol Building

'allahassee,

FL

32301

State of Florida

bcc w/encls:

K. D. Landis, RII

L. Raghavan,

NRR

T.

P. Johnson,

SRI

Document Control

Desk

RII:DRP

RII:

p~RSchin

KL n is

~'l/]w /93

11/ @ /93

e