Provides Info as Performance Enhancement Program Quarterly Update,Per NRC 860812 Order.Details of Info Provided at 870730 Meeting.Major Topics Discussed at Meeting Listed
ML17342A933
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-391, NUDOCS 8710020171
Download: ML17342A933 (11)


Text

REGULATORY FORMATION DlBTRIBUTION S M (RIDB)

ACCESSION NBR:8710020171 DOC. DATE: 87/09/30 NOTARIZED: NO DOCKET 8 FACIL: 50-250 Turkey Point P lant'nit 3> Florida Poeer and Light C 05000250 50-251 Turkey Point Planti Unit 4i Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION WOODYu C. O. Florida Poeer 8c Light Co.

REC IP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides info as performance enhancement program quarterly updatei per 860812 NRC order. Details of info provided at 870730 meeting. Ma Jor topics discussed at meeting listed.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR i ENCL l SIZE:

TITLE: OR Submittal: Qeneral Distribution NOTES:

REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 McDONALDz D 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEBT/ADB 1 NRR/DEBT/CEB 1 1 NRR/DEST/MTB 1 NRR/DEST/RSB i, NRR/DQEA/TBB 1 1 NRR/ 59/ILRB 1 1 OQC/HDS2 1 -

0 Q FIL 01 1 RES/DE/EIB 1 EXTERNAL: EQ8(Q BRUSKEu $ 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 TOTAL NUMBER QF COP IEB REQUIRED: LTTR 21 ENCL 18

)

Lf t

'h

'. O. BOX 000, JUNO BEACH, FL 33408-0420 i+I//g

+row<>

SEPT@ABER S 0 I987 L7-39 I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gen t lemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Performance Enhancement Pro ram ln accordance with the NRC order dated August I 2, I 986, the following information is provided as the Performance Enhancement Program (PEP) quarterly update. The details of this information were provided to members of the NRC Staff at a meeting held onsite at Turkey Point Plant on July 30, l987. At this meeting the PEP Summary Schedules and PEP Outstanding Commitments Schedule were discussed.

The major topics of discussion at the meeting were as follows:

PEP Pro'ect 2 Task 4: Equipment Identification A presentation on the progress of this task was presented with the aid of slides showing examples of the identification system. h PEP Pro'ect 5 Task I: Technical Staff Training A presentation on the topics that plant engineers, planning and administrative personnel were receiving was provided by the Training Department.

PEP Pro'ect 6 Task 5: Managment Action Plan A presentation was made by representatives from a Quality Improvement Team (QIT). Their team was working on solving the problem of prioritizing work orders. This presentation demonstrated the technique utilized to resolve problem areas encountered by the user organization.

PEP Pro'ect 9 Task 6: Maintenance Management System A QIT on improving the Nuclear Instrumentation System reliability made a presentation on the team's finding. This team was composed of members of the Instrument and Control Staff.

87i002Qi7i 870930 PDR ADOCK 05000250 PDR P

an FPL Group company RG3/052/I

~ f e

H IL E

A l,

U. S. Nuclear Regulatory Commission L-87-39 I Page two PEP Pro'ect 4 Task I I: Configuration Control Managers of the Select Systems Review Program presented an update on the progress of that program.

Provided as attachment is the meeting agenda, PEP Schedule and PEP Outstanding Commitment Schedule.

Should there be any questions on this information, please contact us.

Very truly yours,,

C. O. Wo Group V c resident Nuclear nergy COW/RG/gp Attachmen ts cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant RG3/052/2

,a>

gV ~"

~  %

l lk II, N J, N , ll 'y

)

f < \ f )I tg g

'4'~II ),t it%

'(p<~"

'y~'<w $ u E

K u',->.

'h Oi , 'ill. 1 P '

~ S h

lf 'l e

~ l, I 1

PERFORMANCE ENHANCEMENT PROGRAM AGENDA 25 min OVERVIEW: Joe Kappes o PEP Summary o PEP Outstanding Items o PEP Close-out Audit P.RO JECT HIGHLIGHTS: Joe Kappes 30 min o Project 2, Operations Enhancement o Equipment Identification Stan Kalisz 30 min o Project 5, Training o Tech Staff Training Bil I Lightfoot 30 min o Project 6, Management Action Plan o Prioritizer QIP Team John Scott/

Angela Ray 30 min o Project 9, Maintenance Management System o NIS QIP Team Bruce Sharp 30 min o Project 4, Configuration Control o Select Systems Dave Chancy

PKRFSBHSNEK ENIIINCKHENIPHQSHIH FLORIDA POSER O'IGHT COInIPANY TURKEY POINT NUCLEAR PLANTS PROJECT SUHHBSV SCIEllQLE JULY IS I98'l 1984 1985 1986 l 987 l 988 PROJECTS IQ 2Q 3Q 40 1Q 20 5Q 40 1Q 2Q 5Q 40 1Q 20 5tl J10 1Q 2Q 5Q 4Q PROJECT 1 I FEB 84 I HAA 88 SITE FACII.ITIES UPGRADE PROJECT 2 I FE$ $ 4 3I ocr86 OPER ATIONS ENHANCEMENT PROJECT 5 21 SEPB5 22 FEB BB PHOCEOVHES 16 NOUB6 I FE$ 84 2 JAN85 PROJECT 4 26 DEC BB CONF IGVAATIONCNTI. PGM I9 fE884 22 OCF84 PROJECT 5 TRAINING I FE884 I HAA 88 PROJECT 6 MANAGEMENTACTION PGM I FE$ 84 31 JAII 86 PROJECT 7 I. I CENSING I HAA 84 'la AUG Bs PROJECT 8 aA/IIC I FE884 28 SEA 84 6 AUG 85 I PROJECT 9 BECALM MAINTENANCE MGMT SYS. fE$ 84 15 FE$ 85 PROJECT l0 AUG 84 16 HAV 85 31 HAA 87 15 JUL 86 TECHNICAl SPEC. REVISIONS I PROJECT 11 15 ocr 84 31 HAll 87 OPEAABlllTYOF SAFETY SYS. '. < ~~X'>>~;:-'~i4~"~ ~~;~~:I 13 Hav 86 I ocr 84

~~KKa~Y'W~K~D I.EGEND ORIGINAL PEP SCHEDULE PROJ IO pEP O' l ADDITIONS scHFnnlr nnnmnnc~

L

~,-~~

~,

~ l ~

FLORIOB POSER O'IGHT COMPANY PERFDRMBNCE ENHSNKEHENT P80688H Nfl TURKEY POINT NUCLEAR PLANTS JO OUTSTQNSINS DMMlTMENTS f JULY 15 1987 PROJECTS 6ITd 1984 I 985 I 986 1988 INTEGBATEO SCHEOULE MOOS IQ 20 59 4 I 9 20 59 4Q IQ 20 50 00 IQ 20 50 4q 102059 4 PROJECT 1 31 jon88 I jon85 INIEGABIED 5CHIOULE HQO ¹ 272 I Jul 84 I jonaa PROJf CT I TASK 4 PHRS'E IU UPGRADE PROJECT 1 I Jon85 I lnor 88 INIEGRBIEDSCHfOULE HQD ¹ 9972 I oug 84 I mar 88 PROJECT I TASK 5 PHASE U IMPtfHENTAIION PROJECT 3 17 oct 85 I spr88 wrfGABTEOscHEOuLE HOD ¹ 8977 17 oct PROJECT 3 TASK 7 IMPLEMENT PHASE IV PROCEDURE EUISIQNS 22 FE888 PAOJECT 4 INTEGABTED5CHfDULE HOD ¹ 8965 I I mor87 27 csp 87 I I mor ~ 7 27 cop 87 P44 111.17 U¹3 SAFE TY ENGI lfAINC GRP - f INAL BIPOAI PROJECT 4 I I mor87 2d nou87 INTEGRBTEDScHEOutf HOD ¹ 8967 I I mor 8'7 2d nou87 P44 1'l1.18 U¹3 ORBUIING FDILOLUOP 27act 88 I 26 jun aa PROJECT 'I P44 TITDI U>4SBFEIY ENGINEERING GRP - FINAL BfPQAT 26 jun ea INTEGARTEDSLHEOULE H4D ¹ 8966 27oct88 I 26dsr 88 26 jun aa PROJECT 4 PO4 T I '1.22 U¹4 OARLVINC F Ot L OUI UP 26 Jun ab INlEGRBIED SCHEDULE HQD ¹ 8968 26dst 88 I fsb84 PROJECT 5 I mor 88 INTTGRATED SCHf DUCE HOD ¹ 214 I mor 88 3 fsb84 - TRAINING PAQJEC15 TASK5 PtBNlAEFEA'fNCE SIMULATOR PROJECT 9 a5 I oug 87 INIEGABTED SCHfOULf HQD ¹ 8990 BOJEC19TBSK211 CORPORATE PBQGRAH TBEBPBPH 19 o 3I jul 87 PROJECT 9 I dsr87 17 dsc 85 INIIGRBIEDSCHfOULE HOO <8993 17 doc 85 I doc 87 PAOJLf:1 9 I ASK 24 fhHANCL THf Mhlt 5 MSMI SYS TARGET SCHEOULE BEPOBTEO PROGRESS OATA EARLY SCHEOULE