Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17348A5661990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. ML17348A5461990-09-0707 September 1990 Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17348A5501990-09-0707 September 1990 Forwards Jul 1990 Integrated Schedule Regulatory Rept for Facilities ML17348A5521990-09-0606 September 1990 Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs ML17348A5431990-08-31031 August 1990 Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA ML17348A5361990-08-27027 August 1990 Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners. ML17348A5171990-08-24024 August 1990 Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 Request ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 ML17348A5051990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3 ML20059B0111990-08-14014 August 1990 Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813 ML17348A4971990-08-10010 August 1990 Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)1990-07-25025 July 1990 Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17348A4691990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request ML17348A4191990-07-20020 July 1990 Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 ML17348A4201990-07-20020 July 1990 Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr ML17348A4141990-07-20020 July 1990 Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel ML17348A4171990-07-19019 July 1990 Forwards May 1990 Integrated Schedule Regulatory Rept for Plant ML17348A4121990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML17348A4251990-07-17017 July 1990 Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition IR 05000250/19900131990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML20055G8641990-07-16016 July 1990 Informs ASLB That Petitioners Ref to Several Telephone Contacts Between J Butler & M Gutman,Of ATI Career Training Inst Is Inadvertent Misstatement & Should Be Changed to Telephone Contact. W/Certificate of Svc ML17348A4161990-07-16016 July 1990 Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units ML17348A4151990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML17348A4041990-07-12012 July 1990 Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project ML17348A3921990-07-12012 July 1990 Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs L-90-261, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld1990-07-11011 July 1990 Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld L-90-259, Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3))1990-07-11011 July 1990 Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) ML17348A4321990-07-11011 July 1990 Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 ML17348A3941990-07-0909 July 1990 Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17348A4311990-07-0505 July 1990 Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons ML17348A3851990-07-0303 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/90-08 & 50-251/90-08.Corrective Actions:Training Dept Increased Emphasis on Radiological Postings in Radiation Worker Training ML17348A3711990-07-0303 July 1990 Responds to NRC 900524 Request for Addl Info on Emergency Power Sys Enhancement Project ML17348A3671990-07-0303 July 1990 Confirms Util Intentions Not to Operate Beyond Refueling Outage That Represents Last Outage Re NRC Bulletin 89-001 ML17348A3841990-06-29029 June 1990 Forwards LER 90-11 on 900609 Re hi-hi Steam Generator Water Level Turbine Trip & Subsequent Reactor Trip Due to Failure of Switch in Feedwater Valve Controller Hand/Auto Station. W/O Encl ML17348A3601990-06-29029 June 1990 Responds to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Test Procedures Developed & Under Mgt Review Reflecting Revised Inservice Testing Program ML17348A3621990-06-28028 June 1990 Notifies That Senior Operator License SOP-20177-2 Will Be Terminated,Effective 900731 ML17348A3651990-06-28028 June 1990 Advises That Completion of safety-related motor-operated Valve Testing & Surveillance Will Be Completed by June 1990, Per Generic Ltr 89-10 Requirements ML17348A3591990-06-27027 June 1990 Responds to Violations Noted in Insp Repts 50-250/90-09 & 50-251/90-09.Corrective Actions:Specialist Counselled on Importance of Stopping Procedure When Steps Conflict W/ Condition of Plant & Procedure Use Guidelines Reviewed ML17348A3641990-06-27027 June 1990 Responds to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions. ML17348A3861990-06-27027 June 1990 Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702 ML17348A3551990-06-21021 June 1990 Responds to NRC Bulletin 88-010, Nonconforming Molded Case Circuit Breakers. Five Untraceable Circuit Breakers Installed in Unit 3 safety-related Sys.All Five Breakers Replaced W/Traceable Breakers ML20055D9201990-06-20020 June 1990 Advises That Sp Frantz Will Represent Licensee in Argument Scheduled for 900710.Certificate of Svc Encl ML17348A3181990-06-19019 June 1990 Forwards Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant, Per NRC Bulletin 88-008 ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17348A2871990-06-0808 June 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves or Valves of Similar Design. Bolt Replacement Performed ML17348A2861990-06-0808 June 1990 Advises That Info Re Operating History of Select Fuel Assemblies Sent to ORNL Between 900419 & 26,per 900510 Request ML17348A2781990-06-0404 June 1990 Forwards Emergency Power Sys Enhancement Project Repts, Reflecting Current Design Info 1990-09-07
[Table view] |
Text
'REGULATORY I~<<ORMATION,DISTRIBUTION SYST~,-.(RIDS)
'AOCESSION'BR:8209200207 DOC ~ DATE 82/09/01 NOTARI'ZED: NO DOCKET'
-FAGILt50 250 <<Turkey:Point tPlanti 'Un),t 3~ ',Florida ~Power and .Light 'C 05000250
.'50 251 <<Turkey xpoint )Plant~ 'Uni't 4i .Florida x>Power and Light <<C 05000251 AUTH ~ NAME AUTHOR AFFILIATION
'UHRIG e R~ 6>> -'Florida ~Power 8 Li'ght 'Co ~
jRECIP ~ NAME..RECIPIENT AFFILIATION VARGAe'S>>A>>. Operating Reactors >Branch 1
SUBJECT:
- Forwards >responses,.to questions"<<re,-adequacy of station Tel ectr ic. distribution sys Ivol~tages<per,<<820809,"tel con
<<Explanat,ion of'compl.iance w/General .Desi'gn tGri;teria 17 encl.
OISTRIBUTION >COOS: AOIBS 'COPIES >RECEXVEOILTR 9>.ENCL X. 'SIZE<<
'TITLE: OR 'Submixt tel':,Onsi;te .Emergency, '.Power System
'NOTES:
RECIPIENT )COPIES IREO IP IENT <<COP I ES ID >CODE/NAME .L"">T;TiR 'ENCL ID 'CODE/NAME LTITR ENCL
.NRR ORB1 >BC 01 7 f7 INT>ERNAL': AEOD 1 1 ELD/HDSO 1-7 1
.NRR/DL/ORAB 1 1' NRR/DS I/ICSB 09 1 14 12'NRR'/DSI/PSB 04 1 IRGN2 1 'RM/DDAMI/MI'B 1'8
'EXTERNALS ACRS 16 10 10 INPOPJ ~ STARNES 1 L'P DR 03 1 1 NRC 'PDR 02 1
.NS I1C >>05 ,1 1 NTIS 1 (TOTAL .NUMBER OF 'COPIES REQUIRED; L'T1TR .30 ENCL 30
C, l11 S I
l trr ', <) l'i,
) ~
) I 11
~
I) J Al f fl '"
l <) re') II 11 0
~ r
'f 'i 'I l >>r
) 11 CWg 0 )l'I Jf ~1 ) .>> II 'i fI, 'q l rg ri ~ ti) t l)
~
1, ) II~ r I Il 11',P. I, r qo'f ~
~ ii g ~ ' '4 )
If
) 'I )')f,, )'
,Ir g g f~r'[ cI) Ali I Zi+1 ) t'Wr) ', a
) f ) "I o ~
', q rid Ilr( g f ~1lfl' ' )l 'Ir)I I tg C)t r. 1>> r Rr ) ) ErP glar rrr+1 ~ q ~ ii $i rr)PQ f ry) Ir 'l)I k 0 f.Iran I~/(i 11'IQf J rI 'J J<'r ) f NQR I 9
'0 II I> f 'I ') > f ) l 7'>> f P l(a I"3 I') j)A ')P'll[af I 1 f) '0 rf )f)(lICl f'gX ~
~:= ~~~~~ ~ > r, )<I.II4; 'I r It~ r '"l f)~ Jfr"ill'apl.
ayr I l) ~. I S y) 3 1) : I) ji r II )II< ~ ~il: ) j I l't I ~it' )]l>> II
'rl II r1 l : I<<"<<)t 1l I, "X ~I Jy ~-I I'
l\ 1
.I ~ ) 'I ) )t' j t 4 Er f
P. O. 14000, JUNO BEACH, FL 3340B
~~~IIIVZi l/sa i A FLORIDA POWER & LIGHT COMPANY September 1, 1982 L-82-389 Office of Nuclear Reactor Regulation Attention: llr. S.A. Varga, Chief Operating Reactors Branch gl Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Nr. Yarga:
Re: Turkey Point Units 3 8 4 Docket Nos. 50-250 and 50-251 Adequacy of Station Electric Distribution System Volta es Attached are responses to NRC questions received in a telephone conference on August 9, 1982 and later telecopi ed to Florida Power 8 .Light on August 10, 1982. The "Clarification Items" listed in the telecopy are repeated for convenience in reviewing. Also attached is an explanation of Turkey Point
. Units 3 8 4 compliance with GDC 17, as requested by the NRC.
During the telephone conference the subject of diesel generator testi ng was also raised. Specifically we were asked if our proposed Technical Specifications included the 18 month surveillance test to verify: "that on diesel generator trip, the loads are shed from the emergency busses ana the diesel re-starts on the auto-start signal, the emergency busses are energized with permanently connected loads, the auto-connected emergency loads are energized through the load sequencer and the diesel operates for > 5 minutes while its generator is loaded with the emergency loads. "
. This requirement was included in the original June 3, 1977 NRC letter on this subject. The standard Technical Specification has changed since that time to requi re: "verifying that on a simulated loss of the diesel generator, with offsite power not available, the loads are shed from the energency busses and that subsequent loading of the diesel generator is in accordance with design requirements."
ge do not see the need to add this requirement because of the specific design lIg/5 of the undervoltage logic at Turkey Point. Our present Technical Specifications (4.8.1.c.4) requires us to simulate a loss of offsite power .and to verify that the Diesel Generator starts and loads. We then simulate a safety injection signal and verify that safety loads are sequenced. By conducting this test we test all the components which would be tested by the NRC suggested specification. The only difference is the initiating event of the tests. For our present test, the startup transformer breaker is opened to simulate a loss of offsite power. To perform the NRC suggested test the Diesel Generator Breaker would be opened. From this poi'nt on the same 8209200207 82090i PDR ADOCK 05000250 P PDR PEOPLE... SERVING PEOPLE
Ci Re: Turkey Point Units 3, 8 4 Docket Nos. 50-250 and 50-251 Adequacy of Station Electric Distribution System Volta es components would be tested. Because this testing must be conducted with ootn units off line, this test would lengthen the time off line without accompli shing a significant safety purpose.
you or your staff have any. additional questions on this subject, please t'hould contact us.
Very. truly yours, Robert E. Uhrig Vice President Advanced Systens 8 Technology REU/PLP/mbd cc: Mr. J.P. O'Reilly, Region II Harold F. Reis, Esquire
~I ATTACHMENT Re: Turkey Point Units 3 5 4 Docket Nos. 50-250 and 50-251 Ade uacy of Station Electric Distribution System Voltages Item 1: Verification analysis which demonstrates that the selected voltage/time setpoints with tolerances of the undervoltage relays-will provide protection to all Class 1E equipment and minimize the effects of short duration transients.
Response: All inverse time relay voltage setpoints were selected to reflect equipment minimum terminal voltages at which the equipment would operate continuously. All tolerance is on the plus side for conservatism. The thirty minute, plus or minus ten minutes, delay was chosen, to I) assure the relays just begin to operate at this voltage, thus avoiding nuisance relay action:when the voltage was near the setpoint, but otherwise acceptable, 2) avoid unnecessary disconnection from of fsite power due to short duration transients, and 3) avoid undue hardship in calibration. The relays on, the 4kV busses protect running equipment on those busses. The relays on .
the 480 V load. centers protect running equipment on the load centers and motor control centers connected .to them. All voltage drops between the relay sensing point and equipment terminals were considered.
The voltage setpoints for the instantaneous relays located on the 480 V load centers were chosen to reflect the motor terminal mi nimum voltages at which the motors were guaranteed to start .and run the connected loads. All tolerance is on the plus side for conservatism. These relays are intended .to protect the motors that start on a safety injection actuation and are therefore interlocked appropri'ately. In order to prevent short duration transients from causing unnecessary separation from offsite power, a fixed time delay is also included.
.Item 2: Technical .specification changes "for the design modifications including setpoints (voltage and time) with tolerances, surveillance requirements and limiting conditions for operation (including act,ion statements).
Response: The proposed Technical Specification changes were submitted in FPL letter L-82-334 dated August 6, 1982.
Item 3. Verification that the time delay 'selected for the undervoltage relays does not exceed the maximum time delay assumed in the FSAR Accident Analysis for providing cooling to-the core.
Response: The FSAR accident analysis assumed safety injection occurs 50 seconds after initia'tion of the accident. The safety injection pumps are loaded onto the emergency diesel, generator 18'seconds after completion of the undervoltage or loss of voltage logic.
1
~
~
y I
'I H
The time delay selected for the undervoltage relays that protect starting of safety motors in 10 seconds. Thus core cooling is assured in less than 50 seconds after initiation of the accident.
Item 4: Verification that the design modifications meet all requirements of IEEE-STD-279-1971 (Independence, testabil i ty, single failure).
Response: Each 4kV bus has a pair of inverse time undervoltage relays. Each 480 V load center has a pair of instantaneousundervoltage relays and a pair of inverse time undervoltage relays. Actuation of two out of two of any pair of relays (with appropriate delays and interlocks) will initiate load shedding, emergency diesel generator starti ng, and load sequencing on the associated train. A single failure of any one device wil'1 affect only one train. Each train i s totally independent of the other. All design and installation is considered nuclear safety related and treated in accordance with our guali ty Procedures. A/
Capability for sensor checks, functional tests and calibration are provided. Bypass during test, (provided by a key-locked spring return to normal test switch)'s annunciated in the control room.
Ho means for channel bypass, other than above test, is provided.
The entire scheme is protection grade, with no control system interaction possible.
Item 5: Details on how the load shedding feature of the 480 volt load center protective relays will be bypassed when the diesel generators are supplying the Class 1E, busses and reinstatement of this feature on a diesel generator trip (include latest inverse time relays also).
Response: All undervoltage relays are disconnected from 'the load shedding scheme when the emergency diesel generators are powering.the 4kV busses. This is accomplished by an auxiliary, contact on the emergency diesel generator 4kV breaker. Upon a diesel trip, the breaker opens and reinstates the bypass.
Item 6: The proposed undervoltage relays on the 480 volt Class 1E load centers. are interlocked with an SI signal and,therefore provides no protection for the Class 1E equi pment under non-accident conditions. We require that the design be modified to provide protection under accident and non-accident conditions. The licensee shall submit design modification details which provide protection to all 480 volt Class lE equipment under all conditions";
( Include latest proposed relays).
Response: There are now proposed two sets of undervoltage relays on 'each 480 Y load center. One set, the instantaneous relays, are interlocked with the safety injection signal and are intended to protect safety motors starting during accident conditions. The other set, the inverse time relays, are not interlocked with the safety injection signal. These relays provide protection to equipment, running and starting, under accident or non-accident conditions;
V I Turkey Point Units 3 8 4 Com liance with General Desi n Criterion 17 Turkey Point Units 3 8 4 were designed, constructed, and'icensed prior to issue of the present 'General Design Criteria. The criterion for emergency power for Engineered Safety Features at Turkey Point is stated at FSAR Section 8.1.1 along with a discussion of compliance.
The above notwithstanding, Turkey Point Units 3 8 4 do in fact comply with the present GDC 17. Both an onsite and offsite power system, each of sufficient capacity and capability to meet the requirements specified in the. criterion, are provided. The onsite power supply and distir bution system consists of two redundant trains of emergency diesel generator and associated switchgear, transformers, etc., each having suitable testabi lity to assure performance of their safety functions assuming a single failure. Electric power from the transmission network is supplied by seven 240 kY circuits with a capacity of 540 NYA'ach. A common switchyard connects the transmission network to the plant electrical systems.
Normally, power for the on site distribution system is obtained via the unit auxiliary transformer which is connected to the unit's generator bus. Upon a loss of coolant accident, the units'tart-up transformer is immediately available to assure that core cooling, containment integrity, and other vital functions are maintained. A second source of power for one train can be supplied from the adjacent unit's start-up transformer,'y appropriate manual action, in sufficient time following a loss of all on-site power supplies and other offsite power supplies to assure specified d'esign limits are not
'exceeded.