Informs That NRC Discovery Phase Validation Insp Scheduled for 990412-0514 Rescheduled Until 990517.Purpose of Insp to Evaluate Overall Effectiveness of Phase 1 Expanded Sys Readiness Review Effort
ML17325B543
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/12/1999
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers R
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 9904200153
Download: ML17325B543 (3)


Text

iiiQi, wgAs REOQ+

P

+

rC 4~*~4 UNITED STATES NUCLEAR REGULATORYCOMMISSlON REGION III 801 WARRENVILLEROAD LISLE. ILLINOIS60532-4351 April 12, 1999 Mr. R. P. Powers Senior Vice Pr'esident Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, Ml 49107-1395

SUBJECT:

RESCHEDULING OF THE DISCOVERY PHASE VALIDATIONINSPECTION

Dear Mr. Powers:

This letter is to inform you of the rescheduling of the NRC Discovery Phase Validation Inspection.

As previously documented in the Plant Performance Review letter dated March 26, 1999, the NRC planned to conduct the Discovery Phase Validation Inspection at the D. C. Cook plant from April 12 through May 14, 1999. The purpose of this inspection is to evaluate the overall effectiveness of the Phase 1 Expanded System Readiness Review (ESRR) effort.

Phase 1 was initiallyscheduled to be completed in early April 1999. On April5, 1999, we were notified by your staff that the completion of Phase 1 of the ongoing ESRR has been delayed to late May 1999.

We understand that this slippage in the ESRR program schedule was due in large part to your emphasis on quality. To accommodate this schedule change and ensure that our inspection is effective, we have delayed the start of the Discovery Phase Validation Inspection until May 17, 1999. This inspection schedular change is consistent with your current schedule for completion of the System Readiness Review'Board review of the Phase 1 ESRRs.

If any other schedule changes occur, we request that you inform us as soon as possible, so that we can accommodate those changes.

We willcontinue to monitor your discovery phase activities and take other actions, if necessary, to ensure adequate and timely oversight of activities at the D. C. Cook plant.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter willbe

'laced in the NRC Public Document Room.

9904200%53 99041.2 PDR ADQCK 05000315

R: Powers U'f you have any questions regarding the NRC actions discussed above, please contact Anton Vegel at 630/829-9620 or me at 630/829-9700.

Sincerely, Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

//s/ J. A. Grobe John A. Grobe', Director Division of Reactor Safety cc:

M. Rencheck, Vice President, Nuclear Engineering D. Cooper, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division Ml Department of State Police D. Lochbaum, Union of Concerned Scientists Distribution:

RRB1 (E-Mail)

RPC (E-Mail)

Project Mgr., NRR J. Caldwell, Rill B. Clayton, Rill SRI D. C. Cook DRP DRS Rill PRR PUBLIC IE-01 Docket File GREENS DOCUMENT NAME: G:<COONDCC04089.DRP To receive a co of this document, Indicate In the box: 'C = Co w/o attach/encl 'E' Co w/attach/encl 'N' No co OFFICE RIII:DRP NAME Ve eVkc DATE 04/

/99 RIII:D RIII:DRS Jacobs Grob 04/W99 04/ I /9 OFFICIALRECORD COPY

/