ML17318A534

From kanterella
Jump to navigation Jump to search
Ro:On 791224,util Reported That Under Condition of Dbe,Duct Work on Both Trains of Containment Air Recirculation Sys Could Be Stessed Beyond Yield.Followup Rept Will Be Submitted by 800107
ML17318A534
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/26/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To:
References
NUDOCS 8001070397
Download: ML17318A534 (4)


Text

REGULATORY I RMATION DISTRIBUT'ION SYST (RIDS)

ACCESSION NBR: 8001070397 DOC ~ DATE~ 79/12/26 NOTARIZED:

NO DOCKET f'ACIC:50 815 Donald C ~

Cook Nuclear Power Pl antr On> t li Indiana 8

05000315 AOTH ~ NAME

'UTHOR AFFILIATION SHAt.LARiD ~ VS InGiana 8 Hich/gan Power Co ~

RESHIP

~ NAME RECIPIENT. AI.FILI ATLON

SUBJECT:

~@sr 791224iuti1 reported that under condition of DBEiduct wor k on both t r'ains of containment ai r r eci rcul ation sys Should be stessed beyond yield.Followup rept completed by 800107

'ISTRIBUTION CODE:

A002S COPIES RECEIVED;LTR ENCL TITLE: Incident Reports'"

NO ESs Z ~E -

W aLa man TE s ~W~~W~WWOOmW~WIPHWW~loletwmw~w~wmpsWWtwMWWeseg~~mWspW S IZ E e y.ygyy.~~~a.~~y~

I REC IP IENT ID CODE/NAME ACTION:

05 BC C)Q + /

INTERNAL'

~G F

09 14 TA/EDO i6 FEB 18 PLANT SYS BR 20 AD PLAN'f SYS 23 ENGA '8R 25 PAR SYS BR 27 OPERA LIC BR 29 AOX'SYS'R HANAUERgS ~

ST8 CROUP LEADR EXTERNALS 03 LPDR 29 ACRS COPIES LTTA ENCL 4

1 i

1 1iii 1

1 16 1

REC'IP I EN 7 ID CODE/NAME 02 NRC PDR 11 MPA i5 NOVAK/KNIEL i7 AD FOR ENGR 19 I8C SYS BR REAC SAFT BR 24 KREGER 26 AD/SITE ANAL 28 ACDENT"AAL78 E JORDAN/IE A IRELAND TMI~H STREET 04 NSIC COP Ih.S L'i>A ENCL 1

i 1

1 1

1 1

1 1

o TOTAL NUMBER OF COPIES REQUIRED'TTR ~

ENCL

~

H y

k I"Y I

~ 9 ~.

~'o erlcen lect@la INDIANA& MICHIGANEIECTRIC COMPANY DONALDC. COOK NUCLEAR PLANT P.O. Box 468, Bridgman, Michigan 49106 (616) 466-6901 December 26, 1979 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

This is to confirm our telephone report to your Mr. John Riceland, Staff Duty Officer Washington Office, on December 24, 1979, at 1650 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.27825e-4 months <br />.

At that time we reported that word was received from our New York Office relative to IE Bulletin 79-14 that indicated that under the condition of the design basis earthquake, the duct work on both trains of the Contain-'ent-Air Recirculation System would be stressed beyond yield.

Immediate action was taken by the writer to bring the Unit to Cold Shutdown.

A followup report will be submitted by January 7,

1980, as required by Technical Specification Section 6.9.1.8.

Sincerely, D.V. Shaller Plant Manager

/bab cc:

J.E.

Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger R.W. Kilburn R.E.

Masse, RO:III R.C. Callen, MPSC G. Charnoff, Esq.

G. Olson J.M. Hennigan PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies)

Dir., MIPC (4 copies) 0 g

~EC 28 18P9 80ozOVQ

P