ML17318A511
| ML17318A511 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/07/1979 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17318A513 | List: |
| References | |
| NUDOCS 7912270021 | |
| Download: ML17318A511 (13) | |
Text
gP,fl 4600
+
0
~w*e~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 INDIANA AND MICHIGAN ELECTRIC COMPANY DOCKET, NO. 50-315 DONALD C.
COOK NUCLEAR PLANT UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 34 License tlo.
DPR-58 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The applications for amendment by Indiana and Michigan Electric Company (the licensee) dated February 3, 1978 and March 7, 1979, complies with the standards and requi reIIents of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the ap-lication, the provisions of the Act, and the rules and regula'ions of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endanoering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
~ ~
F
2.
Accordingly, the license is amended by,changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C. (2) of Facility Operating License No.
DPR-58 is hereby amended to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
34, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION A. Schwencer, Chief Operating Reactors Branch "1
Di vision of Operating Reactors
Attachment:
Changes to'the Technical Specifications Date of !ssuance:
December 7,
1979
ATTACHMENT TO LICENSE AMENDMENT NO. 34 FACILITY OPERATING LICENSE NO.
DPR-58 DOCKET NO. 50-315 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages.
The revised pages are identified by Amendment number and contain vertical lines indicatinq the area of chanqe.
The corresponding overleaf pages are also provided for document completeness.-
Paces 3/4 6-20 3/4 6-21 D.
C.
Cook - Unit 1
VALVE tlUHBER PJIASE "B" FUNCTION ISOLATION (Continued)
TABLE 3.6-1 (Continued)
TESTABLE DURING ISOLATION TIME PLANT OPFRATION IN SECONDS 9.
10.
11.
12.
13.
14
~
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
WCR-901 t'JCR-90~
WCR-905 WCR-907 WCR-909 WCR-911 WCR-913 WCR-915 WCR-921 lJCR-923 WCR-925 WCR-927 HrR-929 HCR-931 MCR-933 HCR-935 WCR-945 tJCR-946 lfCR-947 LJCR-948 HCR-951 llCR-952 HCR-953 WCR-954 WCR-955 lJCR-956 WCR-957 WCR-958 NESW to Low Containment Vent IIl NESlf from Low Containment Vent /Il NESW to Low Containment Vent II2 NESW from Low Containment Vent I!2 NESW to Low Containment Vent II3 NESW from Low Containment Vent It3 NESlf to Low Containment Vent II4 tlESH from Low Containment Vent IJ4 NESW to Up Containment Vent IIl NESW from Up Containment Vent Itl NESW to Up Containment Vent II2 NESll from Un Containment Vent l'I2 NESW to Uo Containment Vent II3 NESlf from Up Containment Vent II3 tlESW to Uo Containment Vent II4 NFSW from Un Containment Vent Jt4 NESW from PCP Motor Air Cooler NESW from RCP Motor Air Cooler-NESW from RCP Motor Air Cooler NESH from RCP t'lotor Air Cooler NESlf to RCP Motor Air Cooler Vent II1 NESH to RCP tlotor Air (..oler Vent II2 NESW to RCP Motor Air Cooler Vent II3 NESW to RCP Motor Air Cooler Vent 84 NESW from RCP Motor Air Cooler Vent IIl NESH from RCP Motor Air Cooler Vent IJ2 NESW from RCP Motor Air Cooler Vent II3 NESlf from RCP Motor Air Cooler Vent II4 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
VALVE NlNBER PIJRSF "B" ISOLATION TABLE 3.6-1 (Continued)
FUNCTION Continued TESTABLE DURING ISOLATION TINE PLANT OPERATION IH SECONDS 37.
38.
39.
40.
41.
42.
43 44.
45.
46.
47, 48.
49.
50.
C.
WCR-961 lJCR-963 l!CR-965 lKR-967 1JCR-902 wcR-9or lJCR-9ln iJCR-914 WCR-922 lJCR-926 WCR-930 WCR-934 VCR-962 lJCR-966 rONTAIN~ENT PURrE NESW to Instr.
Rm. East Vent NESH from Instr.
Rm. West Vent NESIJ to Instr.
Rm. East Vent NESW from Instr.
Rm. 'l!est Vent NESH from Lower Containment Vent ¹1 NFSl! from Lower Containment vent'¹2 NESW fl"om l.ower Containment Vent ¹3 NESW from I ower Containment Vent ¹4 NESW from Upper Containment Vent ¹1 tlESW from Upper Containment Vent ¹2 NESW from Upper Containment Vent ¹3 NESll from Upper Containment Vent ¹4 NESW from Instrument Room East Vent NESW from Instrument Room West Vent AND FXNAlJST Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 10 10 10 10 10 10 10 10 10 10 10 10 10 10 l.
5 6.
7.
8.
10.
11.
VCR-lnl vrn-ln~
V(:R-103 vr.ll-inn VCR-105 VCR-1O6 VCR-107*
VCR-201 VCR-202 VCR-203 VCR-204 Instr.
Room Instr.
Room Lower Colllp.
l.ower Comp.
Upper Comn.
Upper Comp.
Cont. Press.
Instr.
Room Instr.
Room Lower Comp.
Lower Comp.
Purge Air Inlet Purqe Air Outlr t Purqe Air Inlet Purqe Air Outlet Purqe Air Inlet Purqe Air Outlet
'elief Fan Isolation Purge Air Inlet Purge Air Outlet Purqe Air Inlet Purqe Air Outlet Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 5
5 5
5 5
5 5
5 5
5
VALVE NUMBER D.
MANUAL ISOLATION TABLE 3.6-1 Continued FUNCTION VALVES Continued TESTABLE DURING ISOLATION TIME PLANT OPERATION IN SECONDS 21.
CCR-440 22.
CCR-441 23.
HCH-221 24.
HCH-231 25.
CCH-430 26.
CCH-431 27.
CCH-432 28.
CCH-433 29.
SH-8*
30.
SH-10*
31.
SH-4*
32.
SH-6*
CCW from Main Steam Penetration CCW from Hain Steam Penetration Hain Steam to Auxiliary Feed Pump Hain Steam to Auxiliary Feed Pump CCW to East Pressure Equalization Fan CCW from East Pressure Equalization Fan CCW to West Pressure Equalization Fan CCW from West Pressure Equalization Fan Upper Containment Sample Upper Containment Sample Instrument Room Sample Instrument Room Sample Yes Yes No No Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA NA NA NA NA NA - Manual Valve-Isolation time not applicable.
(1) 1>>eludes motor operated valves which do not isolate automatically.
Hay be opened on an intermittent basis under administrative control.
TABLE 3.6-1 (Continued)
VALVE NUMBER FUNCTION C.
CONTAINMENT PURGE AND EXHAUST (Continued)
TESTABLE DURING ISOLATIOf'1 TIME PLANT OPERATION IH SECONDS 12.
13.
14.
D.
l.
2.
3.
4 ~
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
2n.
VCR-205 VCR-206 VCR-207*
MANUAL ISOLATION ICt1-111 ICM-129 ICM-25O ICt1-251 IfM-260 ICM-265 ICM-305 ICM-306 ICM-311 ICl'1-321 DW-209 Dll-210.
NPX 151 VI PA 145*
SF-151*
SF-153*
SF-159 SF-160 S I-171 SI-172 Upper Comp.
Purge Air Inlet Upper Comp.
Purge Air Outlet Cont.
Press Relief Fan Isolation VALVES(')
RHR to RC Cold Legs RHR Inlet to Pumps Boron Injection Inlet Boron Injection Inlet Safety Injection Inlet Safety Injection Inlet RHR Suction from Sump RHR Suction from Sump RHR to RC Hot Legs RHR to RC Hot Leqs Oemineralized Hater Supply for Refueling Cavity Demineralized Mater Supply for Refuelina Cavity Dead Weight Tester Containment Service Air Refueling Water Supply Refueling Mater Supply Refueling Cavity Drain to Pur/fication System Refueling Cavity nrain to Purification System Safety Injection Test Line Accumulator Test Line Yes Yes Yes Yes Ho Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes NA NA NA NA NA HA tJA HA NA HA NA NA NA NA NA NA HA NA NA HA
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA AND MICHIGAN ELECTRIC COMPANY DOCKET NO. 50-316 DONALD C.
COOK NUCLEAR PLANT UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 15 License No.
DPR-74 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The applications for amendment by Indiana and Michigan Electric Company (the licensee) dated February 3, 1978 and hatch 7, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regula.ions of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance IIith the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission' regulations and all applicable requi rements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachm'ent to this license amendment, and paragraph 2.C. (2) of Facility Operating License No.
DPR-74 is hereby amended to read as follows:
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
15, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
December 7,
1979 A. Schwencer, Chief Operating Reactors Branch gl Division of Operating Reactors
ATTACHMENT TO LICENSE AMENDMENT N0.15 FACILITY OPERATING LICENSE NO.
DPR-74 DOCKET NO. 50-316 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages.
Revised pages are identified by Amendment number and con ain vertical lines. indicating the area of change.
Corresponding overleaf pages are also provided to maintain document completeness.
Pares 3/4 6-25 3/4 0
6
TAOLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES VALVE NUMOER FUNCTION ISOLATION TIME IN SECONDS-C.
CONTAINMENT PURGE AND EXHAUST (Continued)
'D.
6.
VCR-106 7.
VCR-107*
0.
VCR-201 9.
VCR-202 10.
VCR-203 11.
VCR-204 12.
VCR-205 13.
VCR-206 14.
VCR-207*
MANUAL ISOLATION VALVES 1.
1CM-129 Upper Comp.
Upper Comp.
Purge Air Outlet Purge Air Outlet Cont.
Press Relief Fan Isolation RHR to RC Cold Legs RHR Inlet to Pumps Upper Comp.
Purge Air Outlet Cont.
Press.
Relief Fan Isolation Instr.
Room Purge Air Inlet Instr.
Room Purge Air Outlet Lower Comp.
Purge Air Inlet Lower Comp.
Purge Air Outlet 5
5 5
5 5
5 5
5 5
n CD VALVL'UMI3I.R IJ.
I'IIRSL "8" ISOLATION 45.
lJCII-922 46.
WCR-926 47.
WCR-930 48.
WCR-934 49.
WCR-962 50.
WCR-966 TABLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES I UNCTION (Continued)
NESW from Upper Containment Vent
//1 NESW from Upper Containment Vent tI2 HESW from Upper Containment Vent II3 NESW from Upper Containment Vent 84 HESW from Instrument Room East Vent HESW from Instrument Room West Vent ISOLATION TIME IH SECONDS 10 10
< 10
< 10 10 10 fD fDD O
C.
COHTAIHMEHT PURGE ANO EXHAUST 1.
VCR-101 2.
VCR-102 3.
VCR-103 VCR-104 5.
VCR-105 Instr.
Room Purge Air Inlet Instr.
Room Purge Air Outlet Lower Comp.
P-rge Air Inlet Lower Comp, Purge Air Outlet Upper Comp.
Purge Air Inlet 5
5 5
5