ML17317A836
| ML17317A836 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/27/1978 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 781226, NUDOCS 7812290083 | |
| Download: ML17317A836 (4) | |
Text
REGULATO INFOBMATION D I STR IBUTION
~
STEM (R I DS )
ACCESS I ON NBB:7812290083 DOC. DATE: 78/.1 2/27 NOTARIZED -
NO FACIL:50-316 D()NALD C C()OK 0'2, INDIANA 8, MICHIGAN ELECTRIC CO.,
AUTH.NAWF AUTHOR AFFILI ATION SHALI FR,D.V.
IN 8,
MI PHB RECIP.NAME RECIPIENT AFFILIATION KEPPLEB, J.G.
- BEG.3, CHICAGO,OFF.OF THE DIRECTOR
SUBJECT:
Confirms 781224 verbal rept re brief inoperabilitY of control room pressurization fans,due to Fire Protec logic preventing fans from starting.Followup rept will be submitted 780106.
DISTIIIBOTION CODE:
A002S COPIES IIECEIVED:LTBl ENCL ZI SIZE:
TITLE-. INCID4NT RFPOBTS D()CKET 5'5000316
~
NOTES'EllD~ +CS lILA PI~7l.
RECIPIENT COPIES ID CODE/NAME LTTR 1=NCL ACTION:
05 BC d
gled /
4 INTERNAL:
0.1 REG F
1 09 2
14 HANAUER,1 16 FEB
.1 18 PLANT SYS BR
.1 1
20 AD PLANT SYS,1 0
22 BEAC SAFT BR 1
1 24 COLLINS 0
25 PHB SYS BB 1
26 VOLLMER 1
I 7a Wv E.
BEG I P I FNT ID CODE/NAME 02 NRC PDR 11 MPA'5 NOVAK/KNIEL, 17 AD FOR ENGR 19 I8,C SYS BR 2>>1 AD SYS/PROJ 23 ENGR BB 24 KBEGEB 26 HOUSTON E JORDAN/IE COPIES LTTR ENCL EXTERNAL- 03 LPDB 27 ACRS 1
16 1
04 NS IC I~
Llg tu~i O
TOTAL NUMBFR OF COPIES REQUIRED-'TTR 8
43 ENCL 0
8 g 't'~>Q
I 0
o A
4 4
D
41l~
gEITlOllodll
/+laosrlo
~y~)~~
INDIANA & NICHIGAN PO NE8 CONPANV DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 December 26, 1978 Mr. J.
G. Keppler, Regional Director Office of Inspection'nd Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
This is to confirm our verbal report to NRC Region III Inspector, Mr.
K.
R. Baker, at 1653 hours0.0191 days <br />0.459 hours <br />0.00273 weeks <br />6.289665e-4 months <br /> on December 24, 1978.
At that time we reported that Unit 2 Control Room Pressurization Fans were inoperable, for a short period of time, due to Fire Protection logic preventing the fans from starting.
(Tech.
Spec.
3.7.5.1) followup report will be submitted by January.6, 1978 as required by Technical Specification Section
- 6. 9. 1. 8.
Sincerely,
.D.
V. Shaller Plant Manager DVS/jas cc:
J.
R.
R.
R.
R.
K.
R.
P.
R.
G.
E.
Dolan G.
Olson W. Jurgensen J.
M. Hennigan F.
Kroeger PNSRC Kilburn
,J.
F. Stietzel J.
Vollen BPI Dir., IE (40 copies)
R. Baker RO:III. QDir., MIPC (4 copies-)
C. Callen MPSC W. Steketee, Esq.
- Walsh, Esq.
Charnoff, Esq.
REGULATORy OOCI~E> F<<,F <Opy 00+
0 7812290055
ib il