ML17209A877

From kanterella
Jump to navigation Jump to search
Grants Util 810306 Request for Extension to Allow Submittal of NPDES Permit Application by 810415.Util 810306 Ltr Encl
ML17209A877
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/18/1981
From: Zeller H
ENVIRONMENTAL PROTECTION AGENCY
To: Barrow W
FLORIDA POWER & LIGHT CO.
References
4E-CP, NUDOCS 8103260659
Download: ML17209A877 (8)


Text

I REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR 8 1 03260659 DOC ~ DATE ~ '1 /03/1 2, Florida 8 NOTARI ZED ~"

Light NO OOCKaz 05000389 y

FACIL:50 389 St; Lucie Plant~ Unit Power L Co+.

AUTH ~ NAME AUTHOR AFFILIATION ZELLER~H,D. Environmental Protection Agency RECIP,NAME RECIPIENT A/FILIATION BARRONtH ~ Je Flor ida>> Power 8 Light Co ~

encl'

SUBJECT:

Grants util 810306 request for extension.to allow submittal of NPDES permit application by 810415.Util 810306 ltr~ "

DISTRIBUTION CODE': C003S COPIES RECEZVEDtLTR "ENCL SIZE'" ""

TITLE: Environ. Event/Abnormal Occurrence NOTES:

RECIPIENT COPIES 'RECIPIENT COPIES ID LTTR ENCL ID CODE(NAME LTTR ENCL NERSESiV CODE/NAME'CTION::

YOUNGBLOODgB 05 1 1 ~ 1 1 INTERNAL: ASLBP/J HARD EMERG PREP IaE MPA

'2BR19 16 1

1 2

1 1

2 1

DIRg DIV ENV ENG BR LIC QUAL BR NRC PDR OF LIC 20 02 1*

1 1

1 1

1

~

OELD 0

EG BR 10 17 01 1

1 1

1 1

1 OP EX EVAL BR RAD ASSESS BR21 1, 1 1 1

EXTERNAL; ACRS 22 1 1 LPDR 03 NSIC 03 1 1

@q i'.

TOTAL NUMBER OF COPIES REQUIRED ~ LTTR 19 ENCL 19

0 1

( P

Rzr: 4z-cp MAR g 8 1981 Mr. M.J. Barrow, Jr.

kfanager Environmental Permitting 6 Programs Florida Power 6 Light Company P. 0. Box 529100 Miami,-FL 33152 RE: S'Z. Lucie Plant NPDES FL0002208 Dear Mr.

Barrow:'eference is made to your letter of March 6, 1981,Mn which you requested that Condition III.K. of the referenced permit hh extended to allow submission of the NPDZS permit application for St. Lucia Unit 2 by April'5, 1981.

Your request is hereby granted to April 15, 1981.

Sincerely yours, Original signed 8Y/

Howard D. Zeller, Acting Director Enforcement Division cc: FL Dept. of Environmental Regulation hhi~Q 8r y'~+

Darrell Cl'isenhut U.S. NRC l

4z-cp 4z-ep 4E-CP Kaplan/sp:2328:3/18/81 Kaplan Cloward TaiELL

gI 0

l I

k Ii M

s

~'P C.

P.O. BOX 529100 MIAMI,F L 33152 FLORIDA POWER & LIGHT COMPANY March 6, 1981 Mr. Howard Zeller Acting Director, Enforcement Division U. S. Environmental Protection Agency Region IV 345 Courtland Stret, N. E.

Atlanta, Georgia 30308 Re: St. Lucie Plant NPDES Permit F10002208 Page 15 of 16; Part III K

Dear Mr. Zeller:

Florida Power R Light respectfully requests an extension of the referenced NPDES Permit condition to April 15, 1981. A copy of the Part III, Item K is attached and highlighted.

The application for St. Lucie Unit 1 NPDES Permit was submitted in April of 1980 and the application for Unit 2 will be submitted on or before April 15, 1981.

As Mr. Kaplan of your staff is aware, the St. Lucie Unit No. 2 NPDES application has been available in almost final form since September 1980 as per conversations with Frank M. Gavila and myself. Submittal of the completed application has been delayed due to FPRL's desire to ensure consistency with the petition for amendment to the St. Lucie Unit No. 2 State of Florida Site Certification Conditions. Action by FPRL at the State level will commence shortly.

It is my understanding that the official filing date at the U. S. Nuclear Regulatory Commission for the Environmental Report Operating License Stage for St. Lucie Plant Unit No. 2 has been reported to the company to be February 17, 1981.

Mr. Kaplan has determined that the St. Lucie Unit No. 2 NPDES application

. submittal requirement is triggered under Part III, K page 15 of 16 of the St.

Lucie No. 1 NPDES permit. To avoid any administrative difficulties within EPA and to insure FPRL has the needed flexibility to obtain consistency with the NPDES permit issued by EPA and the Conditions of State Site Certification of the State of Florida, FPRL needs the above requested extension of time. Mr.

Kaplan has agreed verbaQy that this request for extension of time should pose no PEOPLE... SERVING PEOPLE

Mr. Howard Zeller Page Two March 6, 1981 administrative problems regarding the processing of FPL's NPDES Permit for St. Lucie Unit No. 2.

It is FPRL s desire to work closely with your staff in handling the St. Lucie Unit No. 2 permit administrative process. Please advise via telephone if this request meets with your approval.

Sincerely, Manager Environmental Permitting dc Programs W JBjr:FMG:ku cc: Charles Kaplan

Page 7 of 16 p

~ a e

4 Permit tlo. FL0002208

~ m ~

a E Steam generator blowdown may be discharged without limitation ox monitoring requirements provided that secondary system feedwater chemistry specifications Limit total solids to 2 mg/1 and total iron and copper to 0.05 mg/1 each.

F. This permit shall be modified, or alternatively, revoked and reissued, to comply with'ny applicable effluent standard of limitation issued or approved under sections 301(b)(2) (C), and (D), 304(b) (2), and 307(a)(2) of the Clean hater Act, if the efflu nt standard or limitation so issued or approved-(1) Contains different conditions or is otherwise more stringent than any effluent limitation in the permit; or (2) Controls any pollutant not limited in the permit.

The permit as modified or reissued under this paragraph shall also contain any other requirements of the Act then applicable.

G. Plant stormwater which is uncontaminated by plant wastes may be discharged without limitation or monitozing requirements.

Intake screen backwash may be discharged without Limitation or monitoring requirements.

All environmental monitoring reports submitted to the U. S.'Nuclear Regulatory Commission shall be submitted to EPA (2 copies).

conformance mi"h sections 3.1.8, BIorzc 4.1, Entrainment of A cetic

~Or anism.".; and 4.3>> Ninimum Ef fluent Chlorine Usage of Appendi:. 3 to Operating License No. DPR-67 shall constitute conformance with similar monitoring requirements deemed necessary by the Director, Enforce ent Division. Changes in such programs which are underway on the effective date of this permit shall not be made without approval by the Director, Enforcement Division.

I P mittee shall submit an NPDES 'Application for Permit to Discharge Wastewater, I covering Units 1 and 2, to the Director,. Enforcement Division not later than I the date-of submittal of the Environmental Report, Operating License Stage

~ for St. Lucie Plant Unit 2 to the U. S. NucLear Regulatory Commssion L. Permittee shall implement an approved preoperational r.on-radiological aquatic monitorin program on water quality and biotic conditions in the Atlantic Ocean not less than two years prior to the scheduled date for Unit 2 fuel loading. Hot less than six months prior to the scheduled date for implementation, the. permittee shall submit to the Director, Enforcement Division for xeview and approval, a detailed monitoring plan Reports shall be submitted annually, not more than three months following completion of the reoorting pexiod with the first report due 15 months after implementation of the pxogram.

Permittee shall implement an approved operational non-radiological aquatic monitoring program by the date of commercial operation of Unit 2. reot less than six months prior to scheduled implementation date, the permittee shall

.submit to the Director, Enforcement Division for revie~ and approval, a

. detail'ed monitoring plan. Reports shall be submitted annually, not more than tnree months following completion of the reporting period with the first report due 15 months after implementation of the pxogram. The program shall continue for a period of not less than two years after com-mercial operation of Unit 2.

(()