ML17164A511

From kanterella
Jump to navigation Jump to search
Amends 137 & 107 to Licenses NPF-14 & NPF-22,respectively, Deleting Frequency Requirements for TS 6.5.2.8 Audits & Removing Audit Requirements for Emergency Plan & Security Plan
ML17164A511
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/22/1994
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Pennsylvania Power & Light Co, Allegheny Electric Cooperative
Shared Package
ML17164A512 List:
References
NPF-14-A-137, NPF-22-A-107 NUDOCS 9501110141
Download: ML17164A511 (10)


Text

~gR REOy, P0 0O IVl Cy

+~

~O

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSlON WASHINGTON, D.C. 2mi&4001 PENNSYLVANIA POWE

& LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

OOCKET NO. 50-387 SUS UEHANNA STEAM EL CTRIC STATION UNIT 1

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 137 License No. NPF-14 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power Light Company, dated April 5,

1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

95Oil10l4l 94>aim PDR ADOCK 05000387 p

PDR 2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:

(2)

Tech ical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 137 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PPLL shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and is to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

December 22, 1994 3

h F. Stolz, Di ctor roject Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT N0.137 FACILITY OPERATING ICENSE NO.

NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

~REMOV INSERT 6-12 6-12

D BQQEgf (Continued) d.

Proposed changes to Appendix A Technical Specifications or this Operating License.

e.

Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.

f.

Significant operating abnormalities or deviations from normal and expected performance of unit equipment that affect nuclear safety.

g. All REPORTABLE EVENTS.
h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures,
systems, or components that could affect nuclear safety.

i.

Reports and meetings minutes of the PORC.

6.5.2.8 Audits of unit activities shall be performed under the cognizance of the SRC.

These audits shall encompass:

a.

The conformance of unit operation to provisions contained within the Appendix A Technical Specifications and applicable license conditions.

b.

The performance, training and qualifications of the entire unit staff.

I c.

The results of actions taken to correct deficiencies occurring in unit equipment, structures, systems or method of operation that affect nuclear safety.

d.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B", 10 CFR 50.

e.

Any other area of unit operation considered appropriate by the SRC or the Senior Vice President-Nuclear.

f.

The Fire Protection Program and implementing procedures at least once per 24 months.

SUSQUEHANNA - UNIT 1 6-12 Amendment No g9 >

137

~15, (Continued)

g. An independent fire protection and loss prevention inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.

h.

An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 36 months.

i.

The radiological environmental monitoring program and the results thereof.

j.

The OFFSITE DOSE CALCULATiON MANUAL and implementing procedures.

k.

The PROCESS CONTROL PROGRAM and implementing procedures for solidification of radioactive wastes.

I.

The performance of activities required by the Quality Assurance Program to meet the criteria of Regulatory Guide 4.15, December, 1977.

6.5.2.9 The SRC shall report to and advise the Senior Vice President

- Nuclear on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

6.5.2.10 Records of SRC activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each SRC meeting shall be prepared, approved and forwarded to the Senior Vice President

- Nuclear within 14 days following each meeting.

b.

Reports. of reviews encompassed by Section 6.5.2.7

above, shall be
prepared, approved and forwarded to the Senior Vice President - Nuclear within 14 days, following completion of the review.
c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Senior Vice President

- Nuclear and to the management positions responsible for the areas audited within 30 days after completion of the audit by the auditing organization.

SUSQUEHANNA - UNIT 1 6-13 Amendment No. jl'jjl~

137

~

~R RE00

+4 0

Op C

O Ilh0 YI gO

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 PENNSYLVANIA POWER

& LIGHT COMPANY ALLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 1O7 License No. NPF-22 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power Light Company, dated April 5,

1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2) Technica S ecific t ons and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 107 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and is to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

December 22, 1994 Jo n F. Stolz, Dire tor oject Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

TTACHMENT TO LICENSE AMENDMENT NO. 107 FACILITY OPERATING LICENSE NO. NPF-22 DOCK T NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

REMOVE 6-12 INSERT 6-12

QE)QEgf (Continued) d.

Proposed changes to Appendix A Technical Specifications or this Operating License.

e.

Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.

f.

Significant operating abnormalities or deviations from normal and expected performance of unit equipment that affect nuclear safety.

g.

All REPORTABLE EVENTS.

h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures,
systems, or components that could affect nuclear safety.

i.

Reports and meetings minutes of the PORC.

6.5.2.8 Audits of unit activities shall be performed under the cognizance of the SRC.

These audits shall encompass:

a.

The conformance of unit operation to provisions contained within the Appendix A Technical Specifications and applicable license conditions.

c.

The results of actions taken to correct deficiencies occurring in unit equipment, structures, systems or method of operation that affect nuclear safety.

d.

The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B, 10 CFR 50.

e.

Any other area of unit operation considered appropriate by the SRC or the Senior Vice President-Nuclear.

f.

The Fire Protection Program and implementing procedures at least once per 24 months.

SUSQUEHANNA - UNIT 2 6-12 Amendment No. i07

gglDJ15 (Continued) g.

An independent fire protection and loss prevention, inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.

h.

An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 36 months.

i.

The radiological environmental monitoring program and the results thereof.

j.

The OFFSITE DOSE CALCULATION MANUAL and implementing procedures.

k. The PROCESS CONTROL PROGRAM end implementing procedures for solidification of radioactive wastes.

I.

The performance of activities required by the Quality Assurance Program

-'o meet the criteria of Regulatory Guide 4.15, December, 1977.

6.5.2.9 The SRC shall report to and advise the Senior Vice President

- Nuclear on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

6.5.2.10 Records of SRC activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each SRC meeting shall be prepared, approved and forwarded to the Senior Vice President

- Nuclear within 14 days following each meeting.

b.

Reports of reviews encompassed by Section 6.5.2.7

above, shall be
prepared, approved and forwarded to the Senior Vice President - Nuclear within 14 days following completion of the review.

c.

Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Senior Vice President

- Nuclear and to the management positions responsible for the areas audited within 30 days after completion of the audit by the auditing organization.

SUSQUEHANNA - UNIT 2 6-13 Amendment No. M7