APPENDIX A NOTICE OF VIOLATION Pennsylvania Power and Light Co.
Susquehanna Steam Electric Station Berwick, Pennsylvania Docket No. 50-388 License No.
NPF-22 Unit 2 As a result of the inspection conducted January 8 - 10, 1985 and in accordance with the NRC Enforcement Policy (10CFR2, Appendix C), the following violation was identified:
License NPF-22, Item 2.c.2.5 requires in part, "conducting the post-fuel-loading initial test program as described
.in Section 14 of the Final Safety Analysis Report without deviating from the initial test program administrative procedures."
The Pennsylvania Power and Light Company administrative procedure governing the post fuel loading ini-tial test program, AD-TY-460, requires, in Section 6.5. 17, "prepara-tion of a test exception report whenever test results fail to satisfy acceptance criterion," "and, in Section
- 6. 1. 15," analysis of osci 1-latory behavior whenever more than two positive polarity peaks exist utilizing form AD-TY-460-5."
Contrary to the above, as of January 10,
- 1985, two examples of failure to follow the administrative procedure for adequate analysis of test results for the post fuel loading initial test program were identified:
ST-8.4-6 implement'ed on October 7, 1984 did not analyze for the oscil-latory behavior of RHR level and pressure in the time period of 1560-1680
- seconds, did not complete form AD-TY-460-5 as required in step 8.4.7. 1, did not identify in Section 8.4.7.2 that such osci llations would not meet acceptance criteria and did not prepare a test exception report.
2.
ST-11.3-4 implemented on September 29, 1984 did not identify in Step 11.3.6 that LPRMs 08-33 and 32-17 were bypassed, did not indicate that the acceptance criteria analysis in step 11.3.6 could not be satisfied and did not prepare a test exception report.
This is a Severity Level V Violation.
(Supplement I)
Pursuant to the provisions of 10 CFR 2.201, Pennsylvania Power 5 Light Company is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations and (3) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending this response time.
8503220344 850304 PDR
<< ADQCK 05000388 9
PDR OFFICIAL RECORD COPY DL50-388/85 0003.0.0 01/16/85