ML17122A357
| ML17122A357 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 05/02/2017 |
| From: | Janak G South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-17003476, RIS-17-003 | |
| Download: ML17122A357 (3) | |
Text
South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, Texas 77483 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 South Texas Project Units 1and2 May 2, 2017 NOC-AE-17003476 File No. G30 10CFR55 Docket Nos. STN 50-498; STN 50-499 Operator Licensing Examination Schedule
Reference:
NRC Regulatory Issue Summary (RIS) 2017-03 STP Nuclear Operating Company is submitting the attached response to RIS 2017-03.
There are no commitments in this letter.
If you have any questions, please contact me at (361) 972-7327 or Mr. Adrian Culver at (361) 972-8604.
mk
Attachment:
NRC Form 536 STI: 34490914
-f~r Gregory W. Janak Manager, Operations Training
cc:
(paper copy)
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (08H04) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 NOC-AE-17003476 Page 2 of 2 (electronic copy)
Morgan. Lewis & Beckius LLP Steve Frantz, Esquire Paul Bessette U.S. Nuclear Regulatory Commission Lisa M. Regner Jennifer Bridges Kelly Clayton NRG South Texas LP Mark Walker Jim von Suski!
Skip Zahn CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Helen Watkins Robert Free
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
?"""""'
Estimated burden per response to comply with this volunlal)I Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
~~CJ
>fl"-~
OPERA TOR LICENSING information collection Is used to plan budgets and resources for operator examinations.
Send
~
comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 ti EXAMINATION DATA F53), U.S. Nuclear Regulatol)I Commission, Washington, DC20555-0001, or by e-mail to i
cl' lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnation and Regulatol)I Affairs,
- ."'~
~Q.f?
NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means
><*01<¥ used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION SOUTH TEXAS PROJECT IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 NUMBER OF REACTOR 6
8 17 6
OPERATORS NUMBER OF SENIOR REACTOR 6
4 4
9 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2
3 0
6 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 7 /15/19 7/13/20 7 /12/21 7/25/22 ALTERNATE DATE 8/5/19 8/3/20 8/2/21 8/15/22
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY CY NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (05-2016)