ML17083C461

From kanterella
Jump to navigation Jump to search
Forwards Initial SALP Repts 50-275/92-34 & 50-323/92-34 for Period 910701-921231.Informs That Overall,Salp Board Found Performance of Licensed Activities at Plant to Be Superior
ML17083C461
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/12/1993
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G857 List:
References
NUDOCS 9302230177
Download: ML17083C461 (4)


See also: IR 05000275/1992034

Text

ENCLOSURE

~i 1COy~

%p

~4

0

C

D

>>%*4+

UNITED STATES

NUCLEAR REGULATORYCOMMlSSlON

REolON V

1450 MARlALANE

VVALNUTCREEK. CAUFORNIA94596-5388

February

12,

1993

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electr ic Company

Nuclear Power Generation,

B14A

77 Beale Street,

Room 145]

P. 0.

Box 770000

San Francisco,

California 94]77

Attention:

Nr. G, H. Rueger,

Senior Vice President

and General

Hanager

Nuclear

Power Generation

Business

Unit

Subject:

Systematic

Assessment

of Licensee

Performance

(SALP)

Report Nos. 50-275/92-34

and 50-323/92-34

The NRC's Systematic

Assessment

of Licensee

Performance

(SALP) Board has

com-

pleted its periodic evaluation of the performance of your Diablo Canyon Nuclear

Plant for the period July 1,

1991 through

December

31,

1992.

An Overview is

provided

asSection II.A of the enclosed Initial SALP Report.

The performance of Diablo Canyon

was evaluated

in the functional

areas

of P'lant

Operations,

Radiological Controls, Maintenance/Surveillance,

Emergency

Preparedness,

Security,

E'ngineerfng/Technical

Support,

and Safety Assessment/

guality Verification.

The criteria used in conducting thfs assessment

and the

SALP Board's evaluation of your performance

in these functional

areas

are

outlined in NRC Manual

Chapter

0516,

"Systematic

Assessment

of Licensee

Performance,"

dated

September

28,

1990.

Overall, the

SALP Board found the performance of licensed activities at Diablo

.Canyon to be superior.

The. Security. functional area

was

assessed

by the

SALP

Board to be Category

2, improving, with all other functional areas

evaluated

Category

1.

Based

on the Board's

assessment,

we wish to recognize

the overall

performance of your management

and staff in exhibiting an attitude clearly

directed

toward safe facility operation.

Based

upon discussions

with your staff,

a management

meeting to discuss

the

results of the

SALP Board's

assessment

has

been

scheduled for February

25,

1993.

Arrangements for this meeting will be discussed

further with your staff

in the near future.

In that

no functional

area

was assessed

as Category 3,

a written response

to

the enclosed fnitfal SALP report fs not required.

However, you may submit

comments

on the enclosed report, if desired,

within 30 days after the

February

25 meeting.

In accordance

with Section

2.790 of the NRC's "Rules of Practice",

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

Initial SALP report will be placed fn the

NRC's Publfc Document

Room.

9302230177

'7302 i2 t,

l

PDR

ADOCK 05000275'

PDR

hA

~ 0 hy

~ h,

~ w

~ \\e

5rl5

I

V

lg

- 2-

Should you have

any questions

concerning

the

SALP report,

we will be pleased

to

discuss

them with you.

Since ely,

'Dt)hn B. Hartin

Regional Administrator

Enclosure;

Initial SALP Report Nos.

50-275/92-34

50-323/92-34

cc: w/enclosure;

0, A. Sexton,

PG&E

D. D. Townsend,

Vice President/Plant

Manager,

PG&E

C.

M. Marner,

Esq., Attorney

D. A. Taggart, Director, guality Support,

PG&E

B. Thomas,

News Services,

PG&E

T. L. Grebel,

Regulatory Compliance Supervisor,

PG&E

State of California (Gordon K. Van Vleck)

Bob Hendrix, County Administrator

Sandra Silver

INPO

TOTAL P 83

C

~ I