ML17037B631
| ML17037B631 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/11/1977 |
| From: | Rhode G Niagara Mohawk Power Corp |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B631 (4) | |
Text
U.S, NUCLEAR REGULATOflY
%MISSION NRCiFDRM %B
{2 70)
NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL'OCKET NUMBER FILE NUMBER TPo Mr. George, Lear F RPIVl:'Niagara Mohawk Power Corp.
- Syracuse, N. Y.
13202 Gerald K. abode DATE OF DOCUMENT
'4-11-77 DATE RECEIVED OI)-19-77
)I]LETTER RIG INAL COPY ONOTORIZED VNC LASS IF I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION Ltr. Ref.
Ibhed.t Ql'-14>>77 1tr...Advis evaluation has been completed. concerning spray cooling coefficient margins charact to the core spray system and. that system'ubstantial and. do not require further quantifgcation....
ENCLOSURE ng ristic s
( 1 pag
)
PLANT NAME:
NINE MILE POINT UNIT $ J.
jcm SAFETY ASSIGNED AD:
NQKX PR0.1i'.CT IIAiih E LXC ASST FOR ACTION/INFORMATION
'CKZHXEE:
PROJECT MANAGER'IC ASST 4
INTERNALDISTRIBUTION EG FXL NRC PDR X & E g
OELD GOSSICK & STAFF HIPC CASE HANAUER HARLESS PROJECT MANAGFMENT BOYD P ~ COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOV1lOLT LPDR ~
Cab.&
TIC:
NSIC:
ASLB:
ACRS YS 1)OWING/
SYSTEMS SAFETY HEINEMAN
- SCHROEDER ENGXNEERING
't)ACARRY BOSNAK SX)NEIL PAWLXCK REACTOR SAFE ROSS NOVAK ROSZTOCZY CHECK AT& I SALTZMAN RUTH)'.RG EXTERNAL DISTRIBUTION NAT~IAB REG V IE LA PDR CONS ULTANTS:
PLANT SYSTEMS TEDESCO IPPOLXTO OPERATXNG REACTORS STELLO OPERATING TECH EISENHUT
~hE BUTI E BEGONIAVXN=tK ULRQKSON ~OI<
SITE SAFF.
ENV 0
ERNST BALLARD SPANGLER SITE TECH Gh~a)ILL STEPP HULIIAN SITE ANALYSIS VOLL))ER BUNCH J ~ COLLINS
'KRFGER CONTROL NUMBER 7 /dO+'0'
~
NRC FofIM )9d I2.76)
7
- f ~
(Ig
~ ~.x~
- s
~ <~sr
<< ~~,
r
\\J e~ p
~ 4 V(
l,t.
mL P-';
=
l I
~PI I
k P
< ~
II 1
I y)s.
"I N$,
K A
1
Aegolatpyy File dy NIAGARAMOHAWKPOWER CORPORATION NIAGARA ~
MOHAWK 300 ERIE BOUI.EVARO. WEST SYRACUSE. N. Y. 13202 April ll, 1977 g
ifpg
+Ql/ IlgSp.~O+y
>earp 4
p r
Director of Nuclear Reactor Regulation Attention:
Mr. George Lear, Chief Operating Reactors Branch g3 U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 qqju1 atoQ Re:
Nine Mile Point Unit 1 Docket No. 50-220 DPR-63
Dear Mr. Lear:
In a January 14, 1977 letter, Niagara Mohawk provided justi-fication for core spray cooling coefficients used for emergency core cooling analysis for Nine Mile Point Unit l.
In that letter, it was stated that Niagara Mohawk would evaluate the need to more precisely quantify the margins inherent in our core spray system.
This evaluation has been completed.
Based upon information provided in the January 14, 1977 letter, it has been determined that the spray cooling coefficient margins characteristic to the core spray system are substantial and do not require further quanti-fication.
Therefore, Niagara Mohawk does not plan to do additional analyses and/or tests to further support core spray cooling co-efficients currently assumed in Nine Mile Point Unit 1 emergency core cooling analyses.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION Gerald K. Rhode Vice President Engineering WRD/sz
t I
I 1"
'4 lb h
'h "l