Responds to Re Potential for Delays in Issuance of OL Decision,In Order to Satisfy Antinuclear Minority Groups Concerned Re Plant Ability to Withstand Effect of Earthquakes
ML16341C932
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/27/1979
From: Boyd R
Office of Nuclear Reactor Regulation
To: Miller P
AFFILIATION NOT ASSIGNED
Shared Package
ML16340A476 List:
References
NUDOCS 7906070401
Download: ML16341C932 (4)


Text

,0 Distribution:

Docket 's PDR Local PDR APRg 7 Q7Q EDO Reading NRR Reading H.

R. Denton E.

G.

Case R.

S.

Boyd D.

F.

Ross D.

F.

Bunch R.

C.

DeYoung R. J. Mattson V. Stello Docket Nos:

50-275 and 50-323

Dear Mir. Miller:

Yir. P.

C. Hiller 19401 Shubert Saratoga, California 95070 0

D.

B. Vassallo J.

F. Stolz B.

C. Buckley E.

G. Hylton ELD G. Ertter (05940)

M. M. Groff E.

Hughes E.

Moore J. Yore, ASLB rE (3)

SECY Mail (3) (l060)

I am pleased to respond to your letter dated torch 28, 19?9, to the Chairman of the Nuclear Regulatory Comoission.

Since it would not be appropriate under current Cotrmission rules for the Chairman to comment on your concern, your letter was referred to me for reply.

You expressed concern over the potential for delays in the issuance of a decision on an operating license for the Diablo Canyon Nuclear Plants in order to satisfy anti-nuclear minority groups.

Furthermore, you urged that the Commission grant an operating license to the Pacific Gas 8 Electric Company for Diablo Canyon, Unit l.

As you may knoti, the major safety concern during our review of Diablo Canyon was the ability of the plant to safely withstand the effects of a postulated earthquake from the nearby Hosgri fau'lt.

The Hosgri fault, which is located approximately 3 1/2 miles from the Diablo Canyon P'lants, was discovered in 1971.

As a result of this discovery, an intensive study of the effect of the Hosgri fault was undertaken by the Pacific Gas 5 Electric Company, the U. 'S. Geological Survey and the. Nuclear Regulatory Commission.

The results of this study, indicated that sig-nificant modifications were necessary in order that the Diablo Canyon Plants withstand a magnitude 7. 5 earthquake at the Hosgri fault.

llhile we believe this to be a very severe design basis earthquake, we find that the required modifications and attendant delays were necessary and in the best interest of the genera'l public.

Comprehensive public hearings were 'conducted over a period of several months by an Atomic Safety and Licensing Board., These hearings were completed on February 15, 1979 and the record was closed early last month.

The Atomic Safety and Licensing Board is in the process of preparing its decision regarding the licensing of Diablo Canyon based on the record of these proceedings.

'F9000T 0 lg)(

PPPICE~

SURNAME~

DATE~

NRC FORM 518 (9.76) NRCM 0240 4 U, S, 4OVERNMENT PRINTIN4 OPPICEs ISTd d2d d24

4 4

r nt

~ PP I 4 /4 1 /P I

, ~ ~

$ ~

~ 4

~

4 4

~1 4

'4 1

4 4

I 4

4 4

1 '

41

~ 4 I

/ ~

~

4

/

'4 I /

(

P 4

4 4,

/

1 4

~

L P ~

4 4

4 P

~ /

4 ~

4 4

4 6 4 -'4 P.

4, Eiil 4

PP(

Nr. P.

C. Niller es 2 The ground motion earthquake that was recorded from the June 12, 1978 earthquake event at the Fukushima hbclear Power Station in Japan was about two-thirds of that level for which the p'lant was designed, although substantially lower than that for which the Diab'lo Canyon plant is designed.

Since domestic nuclear power plants are designed very similat ly to these Japanese plants, this event gives us confidence that American plants should also be capable of withstanding similar events.

Me will continue to follow the reports dealing with the effect of the June 12, 1978 earthquake on the Fukushima Station and will consider this information with respect to staff criteria for domestic nuclear plant designs.

Thank you for your interest.

Sincerely, OrigbeI dyed bp Roger S. Boyd Roger S. Boyd, Director Division of Project Pznagement Office of Nuclear Reactor Regulation DPPICE~

SURNAME&

DPM.

I GH lton cm DATE~...+.P

. /

NRC EORM 318 (9 76) NRCM 0240 DPM:LWRrAD DBVassallo DPM R

0'1 JFSt O4< g~j>S

DPM, BCBuc 1

04/g~Se P

/79 04/

/79 4 U, 0, OOVERNMENT PRINTIN4 OPPICEi ISTS 020 024 DP RSBoy 04/ 84'79

L ~ t r

~

  • tt r = ~ rttvk

~ ~

~ r

~

t t

ll V Ir r

tk i

~'t

~

')

I

~

Lfr IL ~

r

~

\\ k P

L L

V.

k I

s

Li L

e K

kl II

\\

V ~

L@'

~

~

~

~.

\\

\\

~

I k ~

'L F,

.-.J.

~ t

~

'H

~

L r

V lt tk'C wy r ~

" v r

"LQ l

.I "Writ5 C" V'k k.