L-2015-258, Request for Additional Reply for License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment

From kanterella
(Redirected from ML15301A252)
Jump to navigation Jump to search

Request for Additional Reply for License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment
ML15301A252
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/06/2015
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2015-258, TAC MF6518
Download: ML15301A252 (4)


Text

0October FPLi 6, 2015 L-2015-258 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 1 Docket No. 50-335 RAI REPLY FOR LICENSE RENEWAL CONDENSATE STORAGE TANK CROSS-CONNECT BURIED PIPING INSPECTION COMMITMENT

References:

1. FPL Letter L-2015-135 dated April 29, 2014, "License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection (Unit 1 only) Revised Commitment", ADAMS Accession No.

ML15146A055.

2. Request for Additional Information License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment Florida Power and Light Company St. Lucie Unit No. 1 (M1F65 18), ADAMS Accession No. ML15237A418.

Florida Power & Light (FPL) submitted FPL Letter L-20 15-135 dated May 12, 2015, "License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection (Unit 1 only) Revised Commitment" in Reference 1. Reference 2 forwarded a NRC request for additional information (RAI) on the submittal.

FPL's response to the RAIs is attached to this correspondence.

Please contact Lyle Berry at (772) 467-7680 should you have any questions regarding this submittal.

Very Eric S. Katzmnan Licensing Manager St. Lucie Plant ESK/lrb Attachment cc: USNRC Regional Administrator, Region II USNRC Project Manager, St. Lucie Nuclear Plant USNIRC Senior Resident Inspector, St. Lucie Nuclear Plant Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

L-2015-258 Attachment Page 1 of 3 REQUEST FOR ADDITIONAL INFORMATION LICENSE RENEWAL CONDENSATE STORAGE TANK CROSS-CONNECT BURIED PWPNG INSPECTION COMMITMENT FLORIDA POWER AND LIGHT COMPANY ST. LUCIE UNIT NO. 1 DOCKET NO. 50-335 TAG NO. MF6518 By letter dated May 12, 2015 (Agency wide Documents Access and Management System Accession No.

ML15146A055), Florida Power and Light Company provided information regarding the license renewal commitment for St. Lucie Plant, Unit No. 1 (St. Lucie) to perform a one-time inspection of the Condensate Storage Tank (CST) cross-connect buried piping, prior to the end of the initial operating license term.

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review.

RAT 1 For the concrete that encases the CST piping, state the extent (i.e., length and depth) of concrete that was exposed and the condition of the concrete.

RAI 2 State the basis for why water intrusion is not expected through the concrete to the surface of the stainless steel CST cross-connect piping, or if the potential for water intrusion exists, why loss of material or cracking of the stainless steel piping is not expected.

L-201 5-25 8 Attachment Page 2 of 3 NRC RAI# 1 For the concrete that encases the CST piping, state the extent (i.e., length and depth) of concrete that was

"_- exposed and the condition of the concrete.

FPL Response to RAI # 1 On March 29, 2015 excavation activities uncovered a concrete structure at the design location of the pipe (8-C-95 Condensate Storage Tank cross-connect). A section of concrete was exposed approximately 11 feet long. The width was 18 inches and the depth of the concrete was determined to be 18 inches by partial (semi-circle) excavation at two locations approximately 6 feet apart on the East side.

The West side was not disturbed because design drawings indicated a fire protection pipe was in close proximity on the West side. The drawings identify the lowest section of the pipe run is at elevation 13 feet (the nominal site grade elevation is elevation 18 feet) and this is the approximate location where the concrete was exposed.

There were no indications of any degradation of the concrete such as cracking, spalling, scaling, pitting, leaching, erosion, settlement, cavitation or abrasion areas, voids, pop outs or exposed reinforcing steel.

Debris observed on the concrete duct is from excavated soil and gravel. The concrete duct has rough edges and surface. It can be concluded that this roughness is due to concrete formwork removal during the original construction activities and the condition is in accordance with the original construction specification for concrete which states, "for surfaces against which backfill or concrete is to be placed no treatment is required except for repair of defective areas."

NRC RAI# 2 State the basis for why water intrusion is not expected through the concrete to the surface of the stainless steel CST cross-connect piping, or if the potential for water intrusion exists, why loss of material or cracking of the stainless steel piping is not expected.

FPL Response to RAI # 2 The As-Built isometric drawing for the pipe is dated August 7, 1973. Specific records associated with the concrete placement for the pipe were not located. Plant operating experience obtained from the buried piping program and the observed condition of the concrete which was exposed during the inspection will be used to support the conclusion that water intrusion does not exist and loss of material or cracking of the stainless steel piping is not expected.

The excavation site was dry which is consistent with the design. Unit 1 FSAR Figure 3-8.41 "Water Table at EL + 3 'Loading" and Unit 2 FSAR Section 2.4.13.5 "Design Basis for Subsurface Hydrostatic Loading" identify "The water table is at elevation plus 3 feet MVLW [sic] for normal conditions...". With the design location being approximately 10 feet above the normal water table, the concrete encased pipe is not likely to be submerged for extended periods of time.

Summary_ of Inspection Results from excavation of the pipe / concrete As stated above, on March 29 2015 excavation activities uncovered a concrete structure at the design location of the pipe. This supported the conclusion that the pipe is encased in concrete and not directly buried.

L-2015-258 Attachment Page 3 of 3 No degradation of the concrete such as cracking, spalling, scaling, pitting, leaching, erosion, settlement, cavitation, abrasion, areas, voids, pop outs or exposed reinforcing steel were identified during the inspection. Debris observed on the concrete duct was from excavated soil and gravel. The concrete duct has rough edges and surface. It can be concluded that this roughness is due to concrete fornwork removal during the original construction activities.

Based on the observed condition of the concrete, water intrusion is not expected through the concrete to the surface of the stainless steel crosstie piping.

Results of the inspection are located in the Corrective Action program under Action Request (AR) 02036344.

Buried Piping Program St. Lucie has implemented a buried piping inspection program in accordance with NEI 09-14, "Guideline for the Management of Underground Piping and Tank Tntegrity"', Rev. 3. Program review determined that St. Lucie Unit 2 design documents are very specific and require concrete encasement of buried piping that is stainless steel or contains licensed material. Since the Unit 1 design documents did not specifically require this encasement, exploratory digs were conducted. In each of the inspections, the piping was found to be encased in concrete and the concrete was solid with no delamination. This piping was then exempt from piping surface inspection as part of the buried piping inspection program, since it was determined to be encased in concrete.

In accordance with NEI 09-14 Rev. 3, the St. Lucie buried piping program scope includes safety- related, licensed material, or environmentally hazardous lines. The 8-C-95 line does not fall into this scoping condition, but was included and credited in the buried piping program due to the St. Lucie one-time license renewal conmmitment. St. Lucie's Buried Piping Asset Management Plan is a living document and is periodically updated with inspection results, risk ranking, and future inspection scope.

St. Lucie conducted soil sampling as part of the buried piping inspection program. In general, the soil pH was approximately 9.0, indicating the soil was alkaline. Based on the EPRI presentation, "What Constitutes Corrosive Soil", by Doug Munson, dated July 2013, a pH > 8.5 indicates dissolved salts, low resistivity, and corrosive to cast iron. The CST crosstie piping at St. Lucie is stainless steel and loss of material or cracking are not expected to occur with the tested soil condition, due to any migration of water through the concrete to the surface of the piping.

References:

1. St. Lucie Action Request Assignment 01681374-06, NEI 09-014 Revision 3, Asset Management Plan, St. Lucie Nuclear Station Underground Piping and Tank Integrity Program (UJPTIP),

Revision 0.

2. St. Lucie Action Request 02036344, License Renewal Inspection of Condensate Cross Tie C-8-95 (a.k.a, 8-C-95).
3. St. Lucie Work Order WO 40129353-01, Visual Exam of Buried U1/U2 COND. CROSSTIE 8"-C-95.