Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML15258A1832015-09-0909 September 2015 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative N1-I4-SPT-006 Project stage: Response to RAI ML16028A4342016-03-0101 March 2016 Relief Request (RR) N1-I4-SPT-006, Inservice Inspection Program Project stage: Other 2015-09-09
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23136A8832023-05-16016 May 2023 Responses to Request for Additional Information and Request for Confirmation of Information Regarding Environmental Review of Subsequent License Renewal Application L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information ML23103A2752023-04-13013 April 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request for Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML23089A3542023-03-30030 March 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI ML22115A1752022-04-25025 April 2022 ASME Section XI Inservice Inspection Program - Relief Request N2-14-LMT-004 - Fourth Interval Third Period Limited Examinations - Response to Request for Additional Information ML21350A4082021-12-16016 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Genera Tor Tube Inspections, Rev 1, Using the Consolidated Line-Item Improvement Process Response to RAI ML21341B4372021-12-0606 December 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application Responses to NRC Request for Additional Information Safety Review - Set 5 ML21258A3542021-09-15015 September 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Confirmation of Information Set 2 Safety Review ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21126A3152021-05-0606 May 2021 Proposed License Amendment Request to Battery Surveillance Requirements - Response to Request for Additional Information ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 ML21056A5572021-02-25025 February 2021 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response ML21053A4332021-02-22022 February 2021 (Naps), Units 1 and 2 - Subssequent License Renewal Application (SLRA) Environmental Review - Response to NRC Request for Additional Information ML21042B9042021-02-11011 February 2021 Subsequent License Renewal Application, Response to NRC Requests for Confirmation of Information for the Environmental Review ML21033A3022021-01-25025 January 2021 (NAPS) Units 1 and 2 - Subsequent License Renewal Application (SLRA) - Provides Requested Documents in Response to Environmental Audit. Part 1 of 2 ML21022A1752020-12-16016 December 2020 Steam Generator Tube Inspection Report RAI Response ML20296A6672020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Proposed Inservice Inspection Relief Request N1-I4-LMT-003 Response to Request for Additional Information ML20296A7272020-10-22022 October 2020 Stations Units 1 & 2 - Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break LOCA Supplement to the Response to Request for Additional Information ML20268B1872020-09-24024 September 2020 ASME Section XI Inservice Inspection Program, Proposed Inservice Inspection Alternative N1-I5-NDE-002, Response to Request for Additional Information ML20156A2872020-06-0404 June 2020 Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 & 2 Request for Alternatives to Requirements of ASME OM Code - Response to RAI ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20140A3362020-05-18018 May 2020 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules - Response to Request for Additional Information ML20021A0052020-01-17017 January 2020 Inservice Testing Program Request for Alternative to Requirements of ASME OM Code Relief Request P-9, Response to Request for Additional Information ML19249B7672019-08-29029 August 2019 Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs ML19248B7622019-08-22022 August 2019 Supplement to Proposed License Amendment Request - Flood Protection Dike Modification - Response to Onsite Audit Questions ML19225D1302019-08-0808 August 2019 Response to Request for Additional Information (Follow-Up) Regarding Open Phase Protection Per NRC Bulletin 2012-01 - Proposed License Amendment Request ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19156A2072019-05-24024 May 2019 Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML19071A1142019-03-0707 March 2019 Response to 03/12/2012 Information Request, Seismic Probabilistic Risk Assessment Supplement for Recommendation 2.1 ML18267A0682018-09-18018 September 2018 Attachment - Response to Request for Clarification on Proposed Consolidated Emergency Operations Facility License Amendment Requests ML18257A2272018-09-14014 September 2018 SPRA (Fukushima 50.54f) Audit (Clarification) Questions - Plant Response ML18169A2262018-06-13013 June 2018 Attachment 1 - Response to Request for Additional Information ML18169A2272018-06-13013 June 2018 Attachment 3 - Proposed NAPS Emergency Plan Changes ML18093A4452018-03-28028 March 2018 Ad 2, Response to 03/12/2012 Information Request Seismic Probabilistic Risk Assessment for Recommendation 2.1 ML18092A0812018-03-26026 March 2018 Supplement to Proposed License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18037A7042018-01-31031 January 2018 Response to Request for Additional Information Regarding Proposed License Amendment Request for Spent Fuel Storage and New Fuel Storage ML17354A1602017-12-14014 December 2017 Response to March 12, 2012 Information Request Spent Fuel Pool Seismic Evaluation for Recommendation 2.1 ML17241A0452017-08-24024 August 2017 Proposed ISI Alternatives NI-14-NDE-010 and N2-14-NDE-005 Reactor Pressure Vessel Nozzle Weld Inspections Response to Request for Additional Information ML17171A2302017-06-14014 June 2017 Response to Request for Additional Information ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-009 and N2-I4-NDE-004 ML17065A2502017-02-28028 February 2017 & Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Response to Request for Referenced Information Related to RAIs 2-2, 3-5, and 3-8 ML17025A1282017-01-20020 January 2017 Independent Spent Fuel Storage Installation - Response to Request for Additional Information for License Renewal Application (CAC L25121) 2023-07-26
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 9, 2015 U. S. Nuclear Regulatory Commission Serial No.: 15-245A Attention: Document Control Desk NLOS/DEA: R1 Washington, DC 20555-0001 Docket No.: 50-338 License No.: NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNIT 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PROPOSED INSERVICE INSPECTION ALTERNATIVE NI-14-SPT-006 In a May 19, 2015 letter (Serial No.15-245) Dominion requested an inservice inspection (ISI) alternative, NI-14-SPT-006, for North Anna Power Station (NAPS). The proposed alternative would allow system leakage testing per ASME Section XI, Table IWB-2500-1 and IWB-5221, with isolation valve 1-CH-HCV-1311 in the normally closed position, as an alternative to the system leakage test requirements of IWB-5222(b) for this piping segment.
In an email dated August 13, 2015, the Nuclear Regulatory Commission (NRC) transmitted a request for additional information (RAI) related to the proposed ISI alternative. The Dominion response to the RAI is provided in Attachment 1. In response to RAI 1, a copy of drawing 11715-CBM-095C-4, Sheet 1 of 2 is provided in .
Should you have any questions or require additional information, please contact Ms. Diane E. Aitken at (540) 894-2574.
Sincerely, Mark Sartain Vice President Nuclear Engineering Commitments contained in this letter: None Attachments:
- 1. Response to Request for Additional Information
- 2. Drawing 1171 5-CBM-095C-4, Sheet 1 of 2
Serial No. 15-245A Docket No. 50-338 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Dr. V. Sreenivas NRC Project Manager- NAPS U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station
Serial No. 15-245A Docket No. 50-338 Attachment 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION Virginia Electric and Power Company (Dominion)
North Anna Power Station Unit I
Serial No. 15-245A Docket No. 50-338 Attachment 1 Page 1 of 3 RAIl1 Please provide a drawing of the auxiliary spray piping segment. The drawing is listed on the Relief Request as 11715-CBM-095C-4, Sheet 1 of 2, but was not included with the request.
Dominion Response A copy of drawing 11715-CBM-095C-4, Sheet 1 of 2, ISI Classification Boundary Dwg Interval-4, Chemical and Volume Control System, North Anna Power Station Unit 1, is included as Attachment 2.
RAI 2
Please provide a list of materials for the auxiliary spray piping and discuss the pipe construction.
Dominion Response The auxiliary spray piping is constructed of the materials indicated below and meets the design pressure and temperature ratings of 2735 psig and 650°F, respectively.
Component Material Piping 2" NPS A376-TP316, S/160 Pipe Fittings A403-WP316, (elbows/red ucers) S/160, BW 1-CH-328 A182-F316,S/160 1-CH-HCV-1311 A351 GR CF8
RAI 3
Are there any welded connections (e.g., butt or socket) in the auxiliary spray piping?
Discuss any industry or plant specific operating experience regarding potential degradation of the welded connections in the subject components by mechanism such as fatigue or stress corrosion cracking?
Dominion Response There are 23 butt welded connections in the auxiliary spray piping, none of which have shown signs of degradation due to fatigue or stress corrosion cracking. The Risk-Informed ISI Program, Relief Request N1-14-RI-001 (SER dated January 21, 2011, ADAMS ML110050003), and the supporting evaluations classify the subject auxiliary spray piping, with butt welded connections, as Code Case N-716 Item No. R1.20, Elements not subject to a Degradation Mechanism. No operating experience related to
Serial No. 15-245A Docket No. 50-338 Attachment 1 Page 2 of 3 degraded welded connections on this line was identified, partially due to the fact that because the potential for thermal shock during the performance of system pressure testing has been recognized and other utilities with similar configurations have been granted relief requests for this piping segment.
RAI 4
If there are welded connections in the subject piping segment, have they been volumetrically examined during current or past intervals?
Dominion Response The butt-welded locations along the subject piping segment (line number 2"-CH 1502-Q1), which are considered high safety significant (HSS) and classified with no degradation mechanism (Item No. RI1.20) in the Risk-Informed ISI Program, have not been selected for the Fourth Inspection Interval at this time. Prior to implementation of the Risk-Informed ISI Program, butt welds on line 2"-CH-68-1502-Q1 were examined per ASME Code Section Xl, examination category B-J, Item No. B9.21, with selections subject only to surface examinations. On February 2, 1993, welds 20 and 21 on this same line were examined with a liquid penetrant (PT) examination with no recordable indications. On February 23, 1996, weld 26A on the subject line was also examined with a liquid penetrant (PT) examination with no recordable indications. On the corresponding Unit 2 Auxiliary Spray Line, covered by relief request N2-14-SPT-006 (SER dated November 2, 2010, ADAMS ML102510218), PT examinations were performed on six welds from 1992 through 1999. No recordable indications were identified.
RAI 5
Is there any current or past history of leakage in the subject piping segment? If so, please discuss the leakage and what corrective actions were taken. What are the leakage detection capabilities at the plant?
Dominion Response There has been no history of leakage identified in the subject piping segment between valves 1-CH-HCV-1311 and 1-CH-328. In addition to the performance of IWB-5222(a) exams, the body to bonnet fasteners for these valves are examined every refueling outage in accordance with the Boric Acid Corrosion Control Program. The Reactor Coolant System (RCS) leakage detection systems consist of containment sump monitors (2 trains) and the containment atmosphere radiation monitors (gaseous and particulate). Operability of these systems is maintained in accordance with Technical Specification (TS) 3.4.15, RCS Leakage Detection Instrumentation. In addition, the RCS leakrate is computed daily as required by TS 3.4.13, RCS Operational Leakage.
Serial No. 15-245A Docket No. 50-338 Attachment 1 Page 3 of 3
RAI 6
Are any segments of the auxiliary spray piping insulated or inaccessible in a manner that would prevent a complete VT-2 examination? If so, discuss methods planned to examine these sections.
Dominion Response All of the auxiliary spray piping is insulated. Although no examination hold time is required for Category B-P components, a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> hold time is used to meet the required IWA-5213 insulated component hold time requirements for the other Examination Categories.
RAI 7
Will there be any retained pressure in the pipe during the VT-2 Examinations? If so, provide the retained pressure values in the pipe and what will be in the pipe (i.e., RCS coolant or air?)
Dominion Response The subject piping segment between 1-CH-HCV-131 1 and 1-CH-328 is assumed to be pressurized to RCS pressure due to minor valve leakage. However, since no connection is available for mounting temporary instrumentation this assumption has not been validated.
RAI 8
Discuss whether or not it is possible to pressure test the auxiliary spray piping segment with an external pump.
Dominion Response A plant modification would be required to install the appropriate vents/drains to facilitate use of an external pump to pressure test the auxiliary spray piping segment.
RAI 9
Are there any other factors such as excessive dosage that should be considered in this evaluation?
Dominion Response Approval of the proposed Inservice Inspection Alternative NI-14-SPT-006 would minimize the total dose received by craft personnel required to install test connections and examination personnel performing the inspections. Historically, the contact dose rates have been 400 - 1500 mrem/hr (1-CH-328) and 50 - 250 mrem/hr (1-CH-HCV-1311).
Serial No. 15-245A Docket No. 50-338 Attachment 2 DRAWING 11715-0BM-095C-4, Sheet I of 2 ISI CLASSIFICATION BOUNDARY DWG INTERVAL-4 CHEMICAL AND VOLUME CONTROL SYSTEM NORTH ANNA POWER STATION UNIT 1 Virginia Electric and Power Company (Dominion)
North Anna Power Station Unit I