Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 5, 2012 U,S. Nuclear Regulatory Commission Serial No.12-622 Attention: Document Control Desk NAPS/JHL RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS I AND 2 ANNUAL SUBMITTAL OF TECHNICAL SPECIFICATION BASES CHANGES PURSUANT TO TECHNICAL SPECIFICATION 5.5.13.d Pursuant to Technical Specifications 5.5.13.d, "Technical Specifications (TS) Bases Control Program," Dominion hereby submits the changes to the Bases of the Technical Specifications implemented during the period of October 1, 2011 through September 30, 2012. A summary of these changes is provided in Attachment 1. Enclosed is an electronic copy (CD) of the entire TS Bases through Revision 48 for your information.
TS Bases changes that were submitted to the NRC for information along with the associated License Amendment Request transmittals, submitted pursuant to 10CFR50.90, were reviewed and approved by the Facility Safety Review Committee.
These changes have been implemented with the respective License Amendments. A summary of these changes is provided in Attachment 1.
If you have any questions regarding this submittal, please contact Mr. Page Kemp at (540) 894-2295.
Sincerely, R. M. Garver Director, Nuclear Safety and Licensing Attachment Enclosure - CD of Current TS Bases (Revision 48)
Commitments made in this letter: None AOD'
cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. J. E. Reasor, Jr. (without Enclosure)
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 State Health Commissioner (without Enclosure)
Virginia Department of Health James Madison Building- 7th Floor 109 Governor Street Room 730 Richmond, Virginia 23219 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 G-9A Rockville, Maryland 20852-2738 Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 G-9A Rockville, Maryland 20852-2738 NRC Senior Resident Inspector (without Enclosure)
North Anna Power Station
ATTACHMENT Serial No.12-622
SUMMARY
OF TS BASES CHANGES ASSOCIATED WITH LICENSE AMENDMENTS Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2
Summary of TS Bases Changes Associated with License Amendments Addition to Analytical Methodology to Core Operating Limits Report for Best Estimate Large Break Loss-of-Coolant Accident These amendments and Bases changes add a reference to Technical Specification (TS) 5.6.5.b, Core Operating Limits Report (COLR), to permit the use of the Westinghouse Best Estimate Large Break Loss-of-Coolant accident (BE-LOCA)
Evaluation Methodology using the Automated Statistical Treatment of Uncertainty Method (ASTRUM) for the analysis of LBLOCA at North Anna Units 1 and 2.
The TS Bases changes are made to differentiate the usage of accumulator water level (volume) between small break (SB) LOCA and LBLOCA methodologies. The SBLOCA methodologies use a nominal contained water volume. The best estimate or realistic LBLOCA methodologies sample the accumulator water volume over a given range.
The other Bases changes are to replace "10 CFR 50, Appendix K"with "10 CFR 50.46".
The use of 10 CFR 50.46 allows for the use of both best estimate LBLOCA and deterministic SBLOCA methodologies, since it invokes the requirements of Appendix K.
The Bases changes noted above were submitted to the NRC by Dominion submittals dated October 21, 2010, June 23, 2011 and August 22, 2011 and incorporated into the Bases on March 21, 2012 upon NRC approval and implementation of the associated Technical Specification changes (Amendments 267 for Unit 1 and 248 for Unit 2 issued on February 29, 2012).
Adoption of TSTF-513, Regarding Revision of Operability Requirements and Actions for Reactor Coolant System (RCS) Leakage Detection Instrumentation These amendments and Bases changes revise Technical Specification (TS) 3.4.15, RCS Leakage Detection Instrumentation. The amendments define a new time limit for restoring inoperable RCS leakage detection instrumentation to operable status and establish alternate methods of monitoring RCS leakage when one or more required leakage detection monitors are inoperable. The changes are consistent with NRC-approved Industry Technical Specification Task Force (TSTF) Standard Technical Specifications change TSTF-513, Revision 3.
The TS Bases are revised to clarify the specified safety function for each required instrument in the limiting condition for operation (LCO) Bases, delete discussion from the Bases that could be construed to alter the meaning of TS operability requirements, and reflect the changes made to TS 3.4.15.
Page 1 of 2
The Bases changes noted above were submitted to the NRC by Dominion submittal dated April 27, 2011 and incorporated into the Bases on November 1, 2011 upon NRC approval and implementation of the associated Technical Specification changes (Amendments 265 for Unit 1 and 246 for Unit 2 issued on September 28, 2011).
Page 2 of 2