MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18
[Table view] |
Text
NEXTera ENERGY&
7 POINT BEACH November 9,2012 NRC 2012-0088 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant Unit 1 Docket 50-266 Renewed License No. DPR-24 10 CFR 50.55a Request, Relief Request 1-RR-4 Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the " A lnlet Nozzle Weld Fifth Ten-Year lnservice Ins~ectionProuram Interval In accordance with 10 CFR 50.55a, "Codes and Standards," Paragraph (a)(3)(i), NextEra Energy Point Beach, LLC (NextEra) requests that the Nuclear Regulatory Commission (NRC) grant relief from the requirements of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code (B&PV Code),Section XI, 2007 Edition with 2008 Addenda for the re-examination of the Point Beach Nuclear Plant (PBNP) Unit 1 reactor pressure vessel (RPV) "A" lnlet Nozzle Weld RC-32-MRCL-Alll-03. Relief is requested on the basis that alternative methods will provide an acceptable level of quality and safety.
Specifi,cally, relief is requested to use the qualification requirements for weld examinations conducted from the inside piping surface contained in ASME Code Case N-695, along with the vendor's root mean square (RMS) error achieved under the Performance Demonstration Initiative (PDI) at the Electric Power Research Institute (EPRI) Nondestructive Examination (NDE) Center. The details of the request for relief are enclosed.
NextEra requests approval of this request prior to Marchl5, 2013. The Unit 1 RPV examinations will be conducted during the Spring 2013 refueling outage. The requested duration of this relief request is until the end of the First Period of the Fifth Inspection Interval, which would end July 31, 2015.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 Summarv of Commitments This submittal contains no new commitments or revisions to existing commitments.
Very truly yours, NextEra Energy Point Beach, LLC Enclosure cc: Regional Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Mr. Mike Verhagan, Department of Commerce, State of Wisconsin
ENCLOSURE RELIEF REQUEST 1-RR-4 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT UNIT 1 Request for Relief in Accordance with 10 CFR 50.55a(a)(3)(i)
Alternative Requirements to ASME Section XI Appendix VII (Supplements 2 and 10)
Examinations of Class 1 Pressure Retaining Welds Conducted from the Inside Surface ASME Code Component(s) Affected Code Class: 1 Examination Category: Category R-A Item Number: R1.20 Component Number: RC-32-MRCL-Alll-03 Component Designation: Elbow to Inlet Nozzle at 328.5" Drawing Number: ISI-1120
Applicable Code Edition and Addenda
The current inservice inspection program is based on the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, 2007 Edition with 2008 Addenda. Testing of personnel, procedures, and equipment for the ultrasonic examination of applicable Class 1 and 2 components is governed by Appendix VIII, "Performance Demonstration for Ultrasonic Examination Systems," of the ASME Code,Section XI.
Applicable Code Requirements The examination of Class 1 and 2 piping welds are required to be performed using procedures, personnel and equipment qualified to the criteria of the ASME Code,Section XI, Appendix VIII, and specifically Supplement 10, "Qualification Requirements for Dissimilar Metal Pipe Welds,"
for the examination of ltem R1.20 nozzle-to-piping dissimilar metal welds.
Paragraph 3.2, "Sizing Acceptance Criteria," Subparagraph (b) of Supplement 10 states "examination procedures, equipment, and personnel are qualified for depth sizing when the RMS (root mean square) error of the flaw depth measurements, as compared to the true flaw depths, is less than or equal to 0.125-inch (3.2mm)."
Code Case N-695, "Qualification Requirements for Dissimilar Metal Piping Welds,Section XI, Division 1", provides alternative requirements to Appendix VIII, Supplement 10 and is unconditionally approved for use through Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 16.
Paragraph 3.3(c) of Code Case N-695 states, "Examination procedures, equipment, and personnel are qualified for depth-sizing when the RMS error of the flaw depth measurements, as compared to the true flaw depths, do not exceed 0.125-in. (3 mm)."
Page 1 of 2
Reason for the Request NextEra Point Beach, LLC (NextEra) is performing a volumetric re-examination of RC-32-MRCL-Alll-03 dissimilar metal (DM) weld from the inside diameter (ID) surface during the upcoming refueling outage as required by Paragraph IWB-2420(b). NextEra will implement the NRC-approved alternative requirements of Code Case N-695 for qualification.
NextEra proposes using an alternative RMS error depth-sizing requirement as compared to the 0.125-inch RMS error value stated in Code Case N-695. A NextEra representative confirmed with the Performance Demonstration Initiative (PDI) Administrator on September 25, 2012, that no vendor has successfully demonstrated compliance with the Code-required 0.1 25-inch RMS value for qualification tests for examinations conducted from the ID surface (for either stand-alone Supplement 10 or combined Supplement 2 and 10 qualifications).
NextEra has verified through the PDI Administrator that the examination vendor selected to perform the scheduled re-examinations at Point Beach Nuclear Plant (PBNP) has achieved a 0.212-inch RMS error for the Supplement 10 qualification, a 0.21 1-inch RMS error for the Supplement 2 qualification, and a 0.21 1-inch RMS error for the Combined Supplement 2 andl0.
Proposed Alternative and Basis for Use Pursuant to 10 CFR 50.55a(a)(3)(i), relief is requested for an alternative requirement that will provide an acceptable level of quality and safety.
For the re-examination of indications recorded on weld RC-32-MRCL-AIII-03 (Supplement lo),
NextEra proposes to apply the difference between the examination vendor's achieved RMS error and the Code Case N-695 required 0.1 25-inch RMS error to actual flaw depths during depth-sizing of indications.
Applying the difference between the required RMS error and the achieved RMS error to the actual flaw being sized will ensure a conservative bounding flaw depth for the applicable dissimilar metal weld to be examined at PBNP Unit 1.
Duration of Proposed Alternative The requested duration of this relief request is until the end of the First Period of the Fifth lnspection Interval, which would end July 31, 2015.
Precedents A similar relief request was granted to PBNP:
NRC to FPL Energy Point Beach LLC, letter, Point Beach Nuclear Plant, Units 1 and 2 -
The Fourth 10-Year Interval lnservice lnspection Program Plan Requests for Relief No.
RR-21 (TAC Nos. MD 8319 and MD8320), dated August 25,2008 (ML081690887)
Page 2 of 2