UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 19, 2012 Mr. J. R. Morris Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
SUBJECT:
NOTIFICATION OF CATAWBA NUCLEAR STATION - COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000413, 414/2012007
Dear Mr. Morris:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection (CDBI) at your Catawba Nuclear Station during the weeks of August 13 - 17, August 27 - 31, and September 10 - 14, 2012. The inspection team will be led by Shakur Walker, a Senior Reactor Inspector from the NRC's Region II Office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued December 6, 2010.
The inspection will evaluate the capability of risk significant / low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.
During a telephone conversation on April 16, 2012, Mr. Walker confirmed with Adrienne Driver of your staff, arrangements for an information-gathering site visit and the three-week onsite inspection. The schedule is as follows:
Information-gathering visit: Week of July 23 - 27, 2012 Onsite weeks: August 13 - 17, August 27 - 31, and September 10 - 14, 2012 The purpose of the information-gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor Analyst, will support Mr. Walker during the information-gathering visit to review probabilistic risk assessment data and identify risk significant components, which will be examined during the inspection.
The Enclosure lists documents that will be needed prior to the information-gathering visit.
Please provide the referenced information to the Region II office by July 16, 2012. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
DEC 2
Additional documents will be requested during the information-gathering visit. The additional information will need to be made available to the team in the Region II office prior to the inspection teams preparation week of August 6. Mr. Walker, will also discuss the following inspection support administrative details: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection, (2) method of tracking inspector requests during the inspection, (3) licensee computer access, (4) working space, (5) arrangements for site access, and (6) other applicable information.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Walker at 404-997-4639 or me at 404-997-4530.
Sincerely,
/RA/
Rebecca L. Nease, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.
50-413 and 50-414 License Nos.
Enclosure:
Information Request for Catawba Nuclear Station - Component Design Bases Inspection cc w/encl: (See page 3 and 4)
_ML12110A074______________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII/DRS/EB1 RII/DRS/EB1 SIGNATURE
/RA/
/RA/
NAME S. WALKER R. NEASE DATE 4/ 16 /2012 4/ 18 /2012 E-MAIL COPY?
YES NO YES NO
3 DEC cc w/encl:
George T. Hamrick Station Manager Catawba Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Tanya M. Hamilton Engineering Manager Catawba Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Steven B. Putnam Safety Assurance Manager Catawba Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Randy D. Hart Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution David A. Baxter Vice President, Nuclear Engineering General Office Duke Energy Carolinas, LLC Electronic Mail Distribution M. Christopher Nolan Fleet Safety Assurance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Charles J. Thomas Fleet Licensing Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Luellen B. Jones Fleet Licensing Engineer Duke Energy Carolinas, LLC Electronic Mail Distribution Lara S. Nichols Vice President-Legal Duke Energy Corporation Electronic Mail Distribution David A. Cummings Associate General Counsel Duke Energy Corporation Electronic Mail Distribution Richardson, Alicia Licensing Administrative Assistant Duke Energy Corporation Electronic Mail Distribution Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station U.S. NRC 4830 Concord Road York, SC 29745 David A. Repka Winston Strawn LLP Electronic Mail Distribution County Manager of York County York County Courthouse P. O. Box 66 York, SC 29745-0066 Piedmont Municipal Power Agency Electronic Mail Distribution cc w/encl: (continued on Page 4)
4 DEC cc w/encl: (continued from Page 3)
Vanessa Quinn Federal Emergency Management Agency Radiological Emergency Preparedness Program 1800 S. Bell Street Arlington, VA 20598-3025
Enclosure INFORMATION REQUEST FOR CATAWBA NUCLEAR STATION COMPONENT DESIGN BASES INSPECTION Please provide the information electronically in.pdf files, Excel, or other searchable format on CDROM. (or FTP site, Sharepoint, etc.) The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use.
- 1.
From your most-recent probabilistic safety analysis (PSA) excluding external events and fires:
- a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
- b. A list of the top 500 cutsets
- 2.
From your most-recent probabilistic safety analysis (PSA) including external events and fires:
- a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
- b. A list of the top 500 cutsets
- 3.
Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide human reliability worksheets for these items.
- 4.
List of time critical operator actions with a brief description of each action.
- 5.
List of Emergency and Abnormal Operating Procedures revised (significant) since September 1, 2009, with a brief description of each revision.
- 6.
List of components with low design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and MOV risk-margin rankings, etc.), and associated evaluations or calculations.
- 7. List of station operating experience evaluations/reviews performed, and documented in the stations corrective action program, for industry events and safety related equipment failures/vulnerabilities [as communicated by NRC Generic Communications, Industry Communications, 10 CFR Part 21 Notifications, etc.] since September 1, 2009.
- 8.
List and brief description of safety related SSC design modifications implemented since September 1, 2009.
- 9.
List and brief description of common-cause component failures that have occurred since September 1, 2009.
- 10. List and brief description of operability evaluations completed since September 1, 2009.
2
- 11. List of equipment on the sites Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s).
- 12. List and brief description of equipment currently in degraded or nonconforming status as described in RIS 05-020.
- 13. List and reason for equipment classified in maintenance rule (a)(1) status since September 1, 2009, to present.
- 14. Copies of System Descriptions (or the like design basis documents) for Safety-Related Systems.
- 15. Copy of UFSAR(s).
- 16. Copy of Technical Specification(s).
- 17. Copy of Technical Specifications Bases.
- 18. Copy of Technical Requirements Manual(s).
- 19. List and brief description of Root Cause Evaluations that have been performed since September 1, 2009.
- 20. In-service Testing Program Procedure(s).
- 21. Corrective Action Program Procedure(s).
- 22. One line diagram of electrical plant. (Electronic and full size - hard copy week of July 23)
- 23. Index and legend for electrical plant one-line diagrams.
- 24. Primary AC calculation(s) for safety-related buses.
- 25. Primary DC calculation(s) for safety-related buses.
- 26. PI&Ds for Safety-Related systems. (Electronic and 1/2 size - hard copy week of July 23)
- 27. Index and Legend for PI&Ds.
- 28. Copy of Operability determination procedure(s).
- 30. Copies of condition reports associated with findings from previous CDBI. (If applicable)
- 31. Index (procedure number, titles, and current revision) of station Emergency Operating Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response Procedures (ARPs).
- 32. Copy of any self-assessments performed in preparation for this inspection.
3
- 33. List of any condition reports generated in preparation for this inspection.
- 34. Copies of condition reports generated from previous CDBI (2009).
- 35. Contact information for a person to discuss PRA information prior to the information-gathering trip. (Name, title, phone number, and e-mail address)