MONTHYEARML24285A1682024-10-11011 October 2024 Email Response: LTR-24-0212 David Lochbaum Letter - Public Access to Advisory Committee on Reactor Safeguards Materials - Seabrook ASR ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24115A2362024-03-28028 March 2024 Acceptance Review: Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML24285A2022022-07-0202 July 2022 Email Response - LTR-24-0212 - Patricia Skibbee - President C-10 Board of Directors - David Lochbaum ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds ML19070A2382019-03-10010 March 2019 LTR-19-0088 Maura Healey, Attorney General, the Commonwealth of Massachusetts, Ltr NextEras Requests for a License Amendment and Twenty-year Extension Prior to Issuance of a Final Decision in Adjudicatory Hearing on Concrete Degradation at 2024-05-24
[Table view] |
Text
Valentine, Nicholee From: Thomas, George k.
Sent: Friday, January 13, 2012 10:33 AM To: Cruz, Holly
Subject:
FW: PREDECISIONAL -'0ffieAL-U4SE-O-NY: Preliminary Draft Response for Comment reg. Alkali-Silica Reaction (ASR) Issue at Seabrook Attachments: Seabrook ASR Prelim DRAFT Response (OUO) for Comment 12-20-11.docx
- Holly, Here is the prelim draft version that I sent out for feedback. There is also a very similar DRAFT version (but with a cover letter) in ADAMS ML11347A300.
Thanks.
George From: Thomas, George Sent: Tuesday, December 20, 2011 12:05 PM To: Sheikh, Abdul; Modes, Michael; Chaudhary, Suresh; Raymond, William; Graves, Herman; Pires, lose; Lehman, Bryce Cc: Conte, Richard; Auluck ,Rajender; Hogan, Rosemary; Murphy, Martin; Manoly, Kamal; Farzam, Farhad; Burritt, Arthur
Subject:
PREDECISIONAL F t: Preliminary Draft Response for Comment reg. Alkali-Silica Reaction (ASR) Issue at Seabrook Attached is a Preliminary Draft Response that I put together to the Request for Technical Assistance from Region 1 with regard to the ASR-degradation issue of concrete structures at Seabrook Station. The purpose of this email is to solicit internal brainstorming, input, and comment on the issue and the attached preliminary response. Please note that the attached preliminary document is NOT the NRR/DE position and has not been reviewed and concurred within NRR/DE. Further, we have not yet got a firm comprehensive Action Plan and Test Plan from the licensee, which is very important to taking an NRC position on the issue. Please provide your comments at the earliest but no later than COB January 20, 2012.
Thanks.
George Thomas Structural Engineer NRR/DE/EMCB 301-415-6181 From: Hiland, Patrick \ ,'--*-
Sent: Tuesday, December 20, 2011 7:47 AM To: Miller, Chris Cc: Conte, Richard; Thomas, George
Subject:
FW: Briefing Material for Tomorrow's Call at 200pm on Seabrook ASR Importance: High Chris, my staff discussed the attached briefing notes with me last night. In particular, I was briefed on the TIA which George Thomas of my staff is working on, that has a due date of 12/29. Not sure what the expectations are, but it appears that answering the TIA with firm guidance is not achievable by 12/29. George has put together a number of specific criteria that could be used to compare with licensee's "plan" when delivered. I've advised George Thomas to send out his draft information as a brainstorm effort to solicit input from NRR/DLR, RES, and Region I. I've been told that the NRC doesn't have any specific engineering/technical guidance available regarding ASR and that we are searching out info from other industries. Obviously, the licensee has the responsibility to evaluate under XVI and should do the engineering work to defend their corrective action. Our staff will continue to search out current information, but we do not anticipate providing an accurate list of criteria by 12/29. The purpose of this email is info only. ( .
1
From: Conte, Richard Sent: Monday, December 19, 2011 1:30 PM To: Auluck, Rajender; Ayres, David; Bahadur, Sher; Burritt, Arthur; Chaudhary, Suresh; Chernoff, Harold; Clifford, James; Cline, Leonard; Conte, Richard; Cruz, Holly; Delligatti, Mark; Evans, Michele; Ferrer, Nathaniel; Galloway, Melanie; Hiland, Patrick; Howe, Allen; Khanna, Meena; Lamb, John; Lehman, Bryce; Lund, Louise; Manoly, Kamal; Miller, Chris; Miller, Ed; Modes, Michael; Morey, Dennis; Murphy, Martin; Plasse, Richard; Raymond, William; Roberts, Darrell; Sakai, Stacie; Sheikh, Abdul; Thomas, George; Wilson, Peter
Subject:
Briefing Material for Tomorrow's Call at 200pm on Seabrook ASR See attached agenda and talking points along with attachments for more details.
2