ML12087A315

From kanterella
Jump to navigation Jump to search
G20120202/LTR-12-0115/EDATS: SECY-2012-0141 - Ltr. Thomas F. Obrien Relicensing of Seabrook
ML12087A315
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/12/2012
From: O'Brien T
City of Newburyport, MA, City Council
To: Jaczko G
NRC/Chairman
Cunanan A
References
G20120202, LTR-12-0115, SECY-2012-0141, EDATS: SECY-2012-0141
Download: ML12087A315 (7)


Text

EDO Principal Correspondence Control FROM:

DUE:

/

EDO CONTROL: G20120202 DOC DT: 03/12/12 FINAL REPLY:

Thomas F. O'Brien City of Newburyport, Massachusetts TO:

Chairman Jaczko FOR SIGNATURE OF :

    • GRN CRC NO: 12-0115 DESC:

ROUTING:

Relicensing of Seabrook (EDATS: SECY-2012-0141)

Borchardt Weber Virgilio Ash Mamish OGC/GC

Dean, RI
Wiggins, NSIR
Burns, OGC
Bowman, OEDO DATE: 03/26/12 ASSIGNED TO:

NRR CONTACT:

Leeds SPECIAL INSTRUCTIONS OR REMARKS:

For Appropriate Action.

If response is

made, please coordinate with OGC.

Note:

OGC will prepare ex parte response for SECY's signature.

1ýý fb -

EDATS Number: SECY-2012-0141 Source: SECY Gener al Inor aioII Assigned To: NRR Other Assignees:

Subject:

Relicensing of Seabrook

==

Description:==

CC Routing: Regionl; NSIR; OGC ADAMS Accession Numbers -

Incoming: NONE OEDO Due Date: NONE SECY Due Date: NONE Response/Package: NONE Othe Infraio Cross Reference Number: G20120202, LTR-12-0115 Related Task:

File Routing:. EDATS Staff Initiated: NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO PoesI nforatio Action Type: Appropriate Action Priority: Medium Sensitivity: None Signature Level: No Signature Required Urgency Approval Level: No Approval Required OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions: For Appropriate Action. If response is made, please coordinate with OGC. Note: OGC will prepare ex parte response for SECY's signature.

NO Originator Name: Thomnas F.O'Brien Date of Incoming: 3/12/2012 Originating Organization: City of Newburyport, Document Received by SECY Date: 3/26/2012 Massachusetts Addressee: Chairman Jaczko Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of I

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Mar 22, 2012 09:25 PAPER NUMBER:

ACTION OFFICE:

LT R-15 OG ED LOGGING DATE: 03/21/2012 AUTHOR:

AFFILIATION:

ADDRESSEE:

SUBJECT:

ACTION:

DISTRIBUTION:

LETTER DATE:

ACKNOWLEDGED SPECIAL HANDLING:

Thomas O'Brien MA Gregory Jaczko Resolution with respect to the relicensing of the Seabrook Station Appropriate RF 03/12/2012 No OGC to prepare ex parte response for SECY's signature...to be reviewed by SECY/RAS NOTES:

EDO for Appropriate Action ADAMS FILE LOCATION:

DATE DUE:

DATE SIGNED:

EDO -- G20120202

CITY OF NEWBURYPORT CITY COUNCIL NEWBURYPORT CITY HALL 60 PLEASANT STREET P.O. Box 550 NEWBURYPORT, MA 01950 TEL: 978-465-4407 FAX: 978-462-7936 March 12, 2012 Nuclear Regulatory Commission Chairman Gregory B. Jaczko Washington, DC 20555-0001

Dear Chairman Jaczko,

On January 30, 2012 the City Council of the Newburyport voted unanimously to adopt the enclosed Resolution with respect to the relicensing of the Seabrook Station. As members of the Newburyport City Council, we feel we have a responsibility to address public safety matters on behalf of the residents, visitors, and businesses in our community. Accordingly, we wish to inform the Nuclear Regulatory Commission (NRC) of our deep concern about current safety risks posed by the Seabrook nuclear power plant. Specifically, we are concerned about significant degradation of concrete in the nuclear power plant structure due to unabated groundwater infiltration and the admission by the NRC that the full of extent of this problem is unknown.

It is of the utmost importance in the case of the Seabrook reactor that the NRC not relicense this facility based on an "aging management plan" submitted to and approved by the NRC. The scope and complexity of the corrective measures at Seabrook Station warrant that the reactor's owner/operator repair the concrete and abate the groundwater infiltration before the NRC considers relicensing. The NRC should not accept a paperwork promise to fix the plant as the basis of relicensing.

The NRC should, instead, strengthen its oversight of Seabrook Station. We appreciate that the NRC inspection team reported the degradation to the public. We are, however, justifiably concerned that the groundwater infiltration and resulting structural concrete degradation have gone on for years-by the NRC's own account-without being fully addressed.

The NRC has now described concrete degradation as "severe", finding a twenty-two percent (22%) reduction in compression strength only halfway through the plant's current operating license. Clearly, the processes leading to this degradation did not occur overnight. Thus, it is reasonable to expect the NRC to determine if on-site inspections have adhered to existing protocols in every respect and, further, to determine if the inspection protocols themselves are adequate. For the sake of safety and transparency, it is also reasonable to ask the NRC to distribute their findings to the public.

Our constituents know that a building is no stronger than its foundation. We, and many constituents, are concerned that the NRC and Seabrook's owner/operator are rushing to relicense this nuclear power plant without first guaranteeing the long-term stability and safety of the facility. With 18 years left on the current license, there is absolutely no reason for the NRC to accelerate the relicensure process.

Our constituents deserve complete assurance that the significant problems the NRC has reported will not result in Seabrook's sirens warning us to evacuate this great city.

Respectfly submitted by, Thom"s F. O'Brien, President and Members of the Newburyport City Council TFO/lmv Enclosure

CIT[Y OF N]E\\WBU[RYPORT IN CITY COUNCIL ORDERED:

Date:

January 30, 2012 RESOLUTION ON SEABROOK STATION RELICENSING Whereas, in May 2011, the Nuclear Regulatory Commission(NRC) reported that concrete degradation caused by an alkali-silica reaction had significantly weakened foundation structures at the Seabrook nuclear power plant; and Whereas, the NRC has stated that such degradation has affected a safety structure at the plant; and Whereas, the NRC admitted it did not know the extent and severity of the degradation throughout the plant's foundation where groundwater has saturated the concrete; and Whereas, Seabrook Station is the only -commercial reactor in the United States with confirmed structural concrete degradation affecting a safety structure; and Whereas, in light of this condition, the NRC has notified all commercial reactors in the United States to search for similar concrete degradation due to alkali-silica reaction; and Whereas, the Nuclear Regulatory' Commission has the primary responsibility to regulate commercial nuclear reactor operations and protect public safety related to said operations; Therefore, be it rcsolved that the Newburyport City Council request the Nuclear Regulatory Commission to take the following steps:

  • Immediately halt all relicensing activities related to Seabrook Station; o

Conduct peer-reviewed studies of the reactor's ability to withstand seismic activity with compromised structural concrete, and publicly report the results of these studies;

  • Fully investigate the causes of the unabated groundwater infiltration and resulting concrete degradation, and publicly report the results of such investigation; Devise a corrective action program to address both groundwater infiltration and concrete

.degradation throughout the facility;

  • Require the owner and operator of Seabrook Station to take corrective measures to stop groundwater infiltration and related concrete degradation;
  • Inspect and monitor the results of those corrective measures over a sustained (multiyear) period of time to ensure that corrective measures are effective;

9 If, following corrective measures and sustained monitoring, the Nuclear Regulatory Commission determines that degradation of safety structures has not abated, that it suspend the license to operate Seabrook Station until safe operation of this reactor can be assured.

Councillor Kathleen O'Connor Ives Councillor Edward C. Cameron Councillor Barry N. Connell Councillor Robert J. Cronin In City Council January 30, 2012 Motion to approve by Councillor Connell, seconded by Councillor Cameron. Roll call vote, 10 yes, I absent (Heartquist). So voted.

[/ I(

-*4 Approve:

Attest:____

Donna D. Holaday, Mayor Richrd B. Jones, City Clerk U

Date: