Request for Additional Information Regarding Updated Final Safety Analysis Report Review
ML120790421
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/21/2012
From: John Hughey
Plant Licensing Branch 1
To: Pacilio M
Exelon Generation Co
Hughey J, NRR/DORL, 301-415-3204
References
TAC ME6354, TAC ME6355
Download: ML120790421 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 21,2012 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING UPDATED FINAL SAFETY ANALYSIS REPORT REVIEW (TAC NOS. ME6354 AND ME6355)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated April 4, 2011, Exelon Generation Company, LLC {the licensee}, submitted the Updated Final Safety Analysis Report (UFSAR)

Revision 23 and Fire Protection Program Revision 18 for Peach Bottom Atomic Power Station, Units 2 and 3. The submittal was in accordance with Title 10 of the Code of Federal Regulations, Section 50.71{e). The NRC staff has reviewed the submittal and determined that additional information is needed.

To complete its review, the NRC staff is requesting the licensee submit the following documents:

1. Engineering Change Request 08-00493
2. Engineering Change Request 09-00011
3. UFSAR Change 2011-003 If you have any questions, please contact me at {301} 415-3204.

~'D~

John D. Hughey, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: Distribution via ListServ

March 21,2012 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 REQUEST FOR ADDITIONAL INFORMATION REGARDING UPDATED FINAL SAFETY ANALYSIS REPORT REVIEW (TAC NOS. ME6354 AND ME6355)

Dear Mr. Pacilio:

By letter to the Nuclear Regulatory Commission (NRC) dated April 4, 2011, Exelon Generation Company, LLC (the licensee), submitted the Updated Final Safety Analysis Report (UFSAR)

Revision 23 and Fire Protection Program Revision 18 for Peach Bottom Atomic Power Station, Units 2 and 3. The submittal was in accordance with Title 10 of the Code of Federal Regulations, Section 50.71 (e). The NRC staff has reviewed the submittal and determined that additional information is needed.

To complete its review, the NRC staff is requesting the licensee submit the following documents:

1. Engineering Change Request 08-00493
2. Engineering Change Request 09-00011
3. UFSAR Change 2011-003 If you have any questions, please contact me at (301) 415-3204.

Sincerely, Ira!

John D. Hughey, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: Distribution via ListServ DISTRIBUTION:

RidsNrrPMPeachBottomResource RidsNrrLAABaxterResource PUBLIC RidsRgn1 MailCenterResource RidsNrrDorlLpl1-2Resource LPLI-2 RfF RidsOgcRpResource RidsAcrsAcnw_MailCTRResource RidsNrrDorlDprResource ADAMS Accession No.: Ml120790421 OFFICE LPL1-2/PM LPL 1-2/PM LPL1-2/LA LPL1-2/BC JHughey JWhited ABaxter MKhanna 03121/2012 03/21/2012 03/21/2012 03/2112012