Category:Letter
MONTHYEARIR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds 2024-08-26
[Table view] Category:Congressional Correspondence
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 04/18/11 EDO CONTROL: G20110226 DOC DT: 03/22/11 FINAL REPLY:
Senator Frank R. Lautenberg TO:
Chairman Jaczko FOR SIGNATURE OF : ** PRI ** CRC NO: 11-0165 Chairman Jaczko DESC: ROUTING:
New Jersey's Nuclear Safety - Oyster Creek Borchardt (EDATS: SECY-2011-0179) Weber Virgilio Ash Muessle OGC/GC DATE: 03/30/11 Dean, RI Leeds, NRR ASSIGNED TO: CONTACT: Wiggins, NSIR Burns, OGC EDO Rihm Doane, OIP Schmidt, OCA SPECIAL INSTRUCTIONS OR REMARKS:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). Region I, NRR and NSIR to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
--T-NIoJ-'S EC>-q-0 1` s~Iw-o'
EDATS Number: SECY-2011-0179 Source: SECY Genra 'Inomtn Assigned To: OEDO OEDO Due Date: 4/18/2011 11:00 PM Other Assignees: SECY Due Date: 4/20/2011 11:00 PM
Subject:
New Jersey's Nuclear Safety - Oyster Creek
Description:
CC Routing: Regiont; NRR; NSIR; OGC; OIP; OCA ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE IOhrIfomto Cross Reference Number: G201 10226, LTR-l 11-0165 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO IIPrcs Inomtn I Action Type: Letter Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko Urgency: NO Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
Region I, NRR and NSIR to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
I DoumntInomtn I Originator Name: Senator Frank R. Lautenberg Date of Incoming: 3/22/2011 Originating Organization: Congress Document Received by SECY Date: 3/30/2011 Addressee: Chairman Jaczko Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of I
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Mfar 29, 2011 15:46 PAPER NUMBER: LTR-1 1-0165 LOGGING DATE: 03/29/2011 ACTION OFFICE: EDO AUTHOR: SEN Frank Laukenberg AFFILIATION: CONG ADDRESSEE: Gregory Jaczko
SUBJECT:
Concerns the Oyster Creek nuclear generating station ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack LETTER DATE: 03/22/2011 ACKNOWLEDGED No SPECIAL HANDLING: Commission Correspondence NOTES:
FILE LOCATION: ADAMS DATE DUE: 041)Y2011I DATE SIGNED:
EDO -- G20110226
FRANK R. LAUTENBERG NEW JERSEY APPROPRIATIONS td tats nat COMMERCE, SCIENCE, AND WASHINGTON, DC 20510 TRANSPORTATION ENVIRONMENT AND PUBLIC WORKS March 22, 2011 Chairman Gregory B. Jaczko U.S. Nuclear Regulatory Commission Mail Stop O-16G4 Washington, D.C., 20555-0001
Dear Chairman Jaczko,
Thank you for briefing the Environment and Public Works Committee last week on the nuclear situation in Japan. Those events have raised concerns about the susceptibility of our own nuclear fleet, and it is imperative that we take all necessary action to prevent similar events in our country.
As you know, two of New Jersey's four nuclear facilities use the same General Electric boiling water reactor and Mark I containment system design as the Fukushima Daiichi Power Station in Japan. One of those facilities is the Oyster Creek Nuclear Generating Station, which is the nation's oldest commercial nuclear power generator and is located near the Atlantic Ocean.
In light of the new information coming from Japan, I request that you conduct a comprehensive review of the safety of the nuclear plants in New Jersey to determine whether any modifications are necessary to address risks newly identified as a result of the events in Japan.
The review should also include a general reassessment of the suitability of the Mark I design for use at nuclear facilities. If during this review you become aware of shortcomings in the Nuclear Regulatory Commission's authority to require additional safeguards, please identify those.
Please keep my office updated on your progress in conducting this review. Thank you for your consideration of this request and for your work to ensure the safety and security of U.S.
nuclear facilities.
Sincerely, HART SENATE OFFICE BUILDING, SUITE 324 2 RIVERSIDE DRIVE ONE GATEWAY CENTER, 23RD FLOOR ONE PORT CENTER, SUITE 505 NEWARK,NJ 07102 WASHINGTON, DC 2051008101 (973) 639-8700 FAX: (973) 639-8723 (202) 224-3224 FAX: (202) 228-4054 (856) 338-8922 FAX: (856) 338-8936