ML100331992
| ML100331992 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 02/01/2010 |
| From: | Reynolds S Division of Nuclear Materials Safety III |
| To: | O'Connor T Northern States Power Co |
| References | |
| 3-2009-006 | |
| Download: ML100331992 (3) | |
Text
February 1, 2010 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2009-006
Dear Mr. OConnor:
This letter refers to an investigation conducted by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI) to determine if a contract non-destructive examination (NDE) inspector at the Monticello Nuclear Plant willfully failed to follow temperature requirements for NDE inspections of dry fuel storage canisters. Based on the evidence developed during the investigation, we did not substantiate the allegation. The synopsis from the OI report of investigation is enclosed.
If you have any questions or comments regarding this matter, please contact James Heller or Paul Pelke of the NRC Region III staff at telephone number (630) 829-9500.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
You should note that final NRC documents, including the final OI reports, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information pursuant to the FOIA. Requests under the FOIA should be made in accordance with 10 CFR 9.23, Request for Records. The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading-rm/foia/foia-request.html.
Sincerely,
/RA by Patrick L. Louden Acting for/
Steven A. Reynolds, Director Division of Nuclear Materials Safety Docket No. 50-263 License No. DPR-22
Enclosure:
Synopsis of OI Report No. 3-2009-006
February 1, 2010 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2009-006
Dear Mr. OConnor:
This letter refers to an investigation conducted by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI) to determine if a contract non-destructive examination (NDE) inspector at the Monticello Nuclear Plant willfully failed to follow temperature requirements for NDE inspections of dry fuel storage canisters. Based on the evidence developed during the investigation, we did not substantiate the allegation. The synopsis from the OI report of investigation is enclosed.
If you have any questions or comments regarding this matter, please contact James Heller or Paul Pelke of the NRC Region III staff at telephone number (630) 829-9500.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
You should note that final NRC documents, including the final OI reports, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information pursuant to the FOIA. Requests under the FOIA should be made in accordance with 10 CFR 9.23, Request for Records. The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading-rm/foia/foia-request.html.
Sincerely,
/RA by Patrick L. Louden Acting for/
Steven A. Reynolds, Director Division of Nuclear Materials Safety Docket No. 50-263 License No. DPR-22
Enclosure:
Synopsis of OI Report No. 3-2009-006
- See previous concurrence G:\\EICS\\ALLEGATIONS\\AMS-LTRS\\08 AMS\\080095 Monticello\\080095 synopsis 2 licensee.docTo receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N
RIII N RIII N RIII N RIII N
NAME Pelke*
Lipa*
Langan* ** Orth***
Louden for Reynolds DATE 01/29/10 01/29/10 02/01/10 02/01/10 02/01/10 OFFICIAL RECORD COPY
- For permission to release OI synopsis.
- The 3-week email has expired.
ENCLOSURE SYNOPSIS This investigation was initiated on December 1, 2008, by the U.S. Nuclear Regulatory Commission, Office of Investigations, Region III, to determine if a contract Non-Destructive Examination (NDE) Inspector at the Monticello (Monticello) Nuclear Plant willfully failed to follow temperature requirements for NDE inspections of dry fuel storage canisters.
Based upon the evidence developed, this investigation did not substantiate the allegation that a contract NDE Inspector at Monticello willfully failed to follow temperature requirements for NDE inspections of dry fuel storage canisters.
Case No. 3-2009-006